R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA CONTACT: +91 7875558825,e-mail : jbandassociate1@gmail.com .3.ASSCDEIATE VALUER ARCHITECT, INTERIOR, DESIGNER & FORM1 |See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 31/03/2025 To, Shree Hinglajmata construction, RIH No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Subject: Certificate of Percentage of Completion of Construction Work of 'GURUSAHANI TWIN TOWER"situated at plot No-138,S.No-15,N-4 cidco Aurangabad having MahaRERA Registration Number (P51500048239 ) being Developed by shri. Hiroo Chimandas Gurusahani( promoter)&shree Hinglajmata construction (co-pormoter ) Sir, /We have undertaken assignment as Architect /Licensed Surveyor of Certiftying Percentage of Completion of Construction Work of "GURUSAHANI TWIN TOWER" having Chimandas Registration Number (P51500048239) being developed by shri. Hiroo MahaRERA Gurusahani (promoter) &shree Hinglajmata construction (co-pormoter ) Based on the Site Inspection,with respect to the Layout / each Building/Wing of the aforesaid RealEstate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERAisas per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. ADHA A.LLAM c A S Reg.No. CAM0J40967 TABLE-A Layout /Building /Wing Number : Stand alone single building having only one wing S. TasksI Activity No. Percentage of Actual Work Done (As on date of the Certificate) (1) (2 (3) 1. Excavation 100 % 2 Basements (if any) 100% 3 Podiums (if any) 4 Plinth 0 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, lnternal Plaster, Floorings, Doors, 97% windows within Flats / Premises 8. Sanitary Fittings within Flats/Premises 98 % 9. Staircases, Lift Wells & Lobbies at each Floor Level 98 % Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 100 % Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings Applicable points and Equipments as per CFO NOC, Electrical Fittings, ompleted 90% Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal &External Development Works) in respect of the Registered Phase / Project Number Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As ondate of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads &Footpaths No AMC Roads 2 Water Supply Yes 90% As per details obtained from consultant AÄ.M.C.A Reg.No. XiCANO/42367 3. Sewerage (Chamber Lines, Yes 100% AMC chamber line Septic Tank, STP) 4. Strom Water Drains No NA 5 Landscaping&Tree Planting No NA 6. Street Lighting No 0 NA 7 Community Buildings No NA 8 Treatment &Disposal of Sewage No NA and Sullage Water 9 Solid Naste Management & No 0 NA Disposal 10. Water Conservation / Rain Water Yes 95 % As per details Harvesting obtained from consultant 11. Energy Management No 12. Fire Protection & Fire Safety Yes 90% As per details from requirements consultant/ fire NOC 13. Electrical Meter Room, Sub- No NA Station, Receiving Station 14. Others (Option to Add more) No ALA.M.C.A. Reg.No. \CANO40967 Yours faithfully, RRCH Signature &Name of Architect JADHAV.R.S Agreed &Accepted by: Signature shri.Hiroo Chímandas Gurusahani( promoter) SHREE HINGLAJMATA CONSTRUCTIONS shree Hinglajmata construction (co-pormoter ) Patner Date:31/03/2025