-N.G. Karkhane B.E. (Hons.) (Pilani), M.Tech., (l1T, Mum.), FI.E., F.V., MISSE, MWwWA, MACI(USA) Designer Consulting Civil Engineer * Structural Valuer (CAT |-474) Government Registered PropertyEngineer(F-11 1017-5) (M) 9823028081 Structural Auditor, * Chartered 'MOGRA' Rana Nagar, Opp. Hotel Atithi, Aurangabad- 431 003. Jalna Road, E-mail: ngkarkhane@gmail.com Annexure B FORM-2 [See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Monev from Designated Account-Project WIse) Date: 11/01/2025 To The Shree Hinglajmata Constructions Row House No. Al/4, Tirupati Park, Gurusahani Nagar, N4 Cidco, Aurangabad. Subject: Certificate of Cost Incurred for Development of 'Gurusahani Twin Towers' having MahaRERA Registration Number P-51500048239 Only Applicable after project Registration) being Developed by Shree Hinglajmata Constructions. Sir, 1. I N.G. Karhane have undertaken assignment of Certifying Estimated Cost for Gurusahani Twin Towers, having Maha RERA Registration Number P-51500048239 (Only Applicable after project Registration being developed by Shree Hinglajmata Constructions. ) We have estimated the cost of Civil, MEP and Allied Works required for completion of tne apartments & proportionate completion of internal &s external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us tor the Project under Reference y the Developers / Consultants. 1ne Schedule of Items &Ouantity required for the entire work as calculated by.N.G. Karhane 8AMC-59/89) Quantity Surveyor appointed by the Developer/Engineer, the inputs assumption of the cost of material, labour & other carried out by made by the Developer, and the Site Inspection us to ascertain / confirm the above analysis given to us. completion of the 3. We estimate Total Estimated Cost of Cr. aforesaid Project mentioned under reference at Rs. 8.0 estimated (Total of Table A B) at the time of Registration. The Civil, MEP & Total Cost of Project is with reference to the proportionate Allied Works completion of the apartments & as per the completion of internal & external works, for the Speciications mentioned in the Agreement of Sale & Completion purpose of obtaining Occupation Certificate / Plotted Certificate for the Buildingis) I Wingis) I Layout / Development from the 07/10/2021 being the Planning is Authority under whose jurisdiction the aforesaid Project being implemented. calculates to Rs. 7.5 4. The Estimated Cost incurred till date is Estimated Cost Cr Total of Table A & B). The Amount of / Incurred is calculated on the basis of input materials items. services used & unit cost of these & Allied 5. The Balance Cost of completion of the Civil,' MEP Works for completion of Apartments & proportionate completion of internal && external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is &: estimated at Rs. 0.5 Cr (Total of Table A 6. I Certify that the Cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale. of the aforesaid Project as completed on the date of this certificate is & B below: as given in Table A TABLE-A Building/Wing/Layout/Plotted Development bearing RERA No. P51500048239 or called 'Gurusahani Twin Towers' (to be prepared separately for each Building/Wing/ Layout/Plotted Project) Development of the Real Estate Particulars Amount (in Rs) S.No of 8.00 Cr 1. Total Estimated. Cost Building/Wing/ Layout/Plotted date of Development as On Registration is of 7.5 Cr 2. Cost incurred as On date Certificate 93.75% 3. Work Done in Percentage (as Percentage of Estimated Cost) ** 0.5 Cr Balance Cost to be incurred 4. (based on Estimated Cost) Cost incurred on Additional/ Extra 5. Estimated Items not included in the Cost (Table-C) TABLE-B Works in respect of Internal & External Developmnent Registered Phase Amount (in Rs) Particulars S.No Internal & 1. Total Estimated Cost of Works External Development facilities in including amenities & Registration of the Layout as on date is date of Cost incurred as on 2. Certificate Work Done in Percentage (as 3. Percentage of Estimated Cost) incurred (based 4. Balance Cost to be on Estimated Cost) Additional / Extra 5. Cost incurred on the Estimated Items not included in Cost (Table-C) Yours Faithfully, N.G. KARKHANE of Engineer Signature & Name (IN BLOCh LDITERS) with Stamp Bachelor's Degree Holier or eqarOipi t9kCuo [Not Less than nMo NFE, ME M 2(u) of the Act) VONLTING AN SGNERCL ENGN CTRUCTURATR CHARTERD ENGINE R VT.RSOT. PROOrdTY AL Ra 1006, iO) (If applicable) Local Authority license no. Agreed and Accepted by: Constructions Signature for on behalf of Shree Hinglajmata Name: DEVENDRA A. DESHPANDE Date: sHKEE HINGLAJMAIA CONSIKUCIIUn, For on behalf of Land Owner DR. HIROO C. GURSAHANI (Personnel Capacity) Partner Note: complete Registered Real Estate I. The Scope of work is to time to time and as PrOject as per drawings approved from per specifications mentioned in agreement of sale. of Engineer or can 2. (") Quantity survey can be done by office Surveyor, whose be done by an independent Quantity the certificate of quantity calculated can be relied upon by Engineer. In case of independent quantity surveyor being the appointed by Developer, thename has to be mentioned at place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required escalation of cost etc. As this is an estimated cost any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if here are any deviations/qualifications. Example: Any deviations in input material used from specificationsin agreement of sale. Table C List of Extra/Additional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) S.R. No. List of Extra/Additional/ Deletes Items Amount (in Rs.) 1 2.