R. S. JADHAV ARCITE A306 CUS SPACI 01YMPA NIAR GARK DA SUTGIRNI CHOWK GARKH DA AURANGABAD CONTACI 97875358825 email SIADIUM A31 00 INDIA bandasSOcate lomal co J.3, ASSOEIATE AACHITECT. INTEAI0R, 0E8IGMER & VALUER FORM 1 (See Regulation 3] ARCHITECTg cERTIFICATE (1o be submitted at the time of Regiatration of Ongong Project & for Withdrawal of Money from Designatcd Account) Date 31/12/2024 To, Shree Hinglajmata constructlon, RIH No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Subject: Certificate of Percentage of Completionof Construction Work of 'GURUSAHANI TWIN TOWER" situated at plot No-138,S.No-15,N-4 cidco Aurangabad having MahaRERARegistration Number (P51500048239 ) being Developedby shri. Hiroo Chimandas Gurusahani( promoter) &shree Hinglajmata construction (co-pormoter ) Sir, I/We have undertaken assignment as Architect/Licensed Surveyor of Certifying Percentage f Completion of Construction Work of 'GURUSAHANI TWIN TOWER" having MahaRERA Registration Number (P51600048239) being developed by shri. Hiroo Chimandas Gurusahani (promoter) &shree Hinglajmata constructlon (co-pormoter ) Based on the Site Inspection, with respect to the Layout / each BuildingWing of the Real Estate Project, Icertify that as on date of thts Certiticate, the Percentage of Nork aforesaid Done for each of the Building/Wing of the Real Eslate Project under MahaRERA is as per Table-A hereun below. The percentage of work executed WIn respect l0 eachof the activity of enttre Phase is detailed in Table-B. ALAMCAW Keg No CAI10/465o7 TABLE-A Layout / Building /Wing Number: Stand alone single build1ng having only one wing S Percentage of Actual Work No. Tasks / Activity Done (As on date of the Certificate) (1) (3) (2) Excavation 100 % 2 Basements (if any) 100 % 3 Podiums (if any) 4 Plinth 5 stilt Floor 100 % 6 Slab of Super Structure 100 % 7 Internal Walls, Internal Plaster, Floorings, Doors, 92 % windows within Flats / Premises 8 Sanitary Fittings within Flats /Premises 92% 9. Staircases, Lift Wells & Lobbjes at each Floor Level 95 % Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 98% Completion of Terraces, with waterproofing of the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings Applicable points and Equipments as per CFO NOC, Electrical Fittings, completed 50% Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to ntrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirenents as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage of Details No. (Yes /NO) actual Work Done (As on date of (1) 1 (2) Internal Roads &Footpaths No (3) Certificate) (4) (5) -2 Water Supply Yes 80% AMC Roads As details per obtained from consultant ACAS Rog Nu CAINO48967 3 AMC chamber line Sewerage (Chamber Septic Tank, STP) Lines, Yes 95% 4. NA Strom Water Drains No NA 5 6 Landscaping &Tree Planting No NA 7 Street Lighting No NA 8 Community Buildings No NA Treatment &Disposal of SevwageNo and Sullage Water NA 9. Solid Waste Management & No Disposal As per details 10. Water Conservation / Rain Water Yes 80% obtained from Harvesting consultant 11. Energy Management No 0 As per details from 12. Fire Protection & Fire Safety Yes 50% consultant/ fire NOC requirements 13. Electrical Meter Room, Sub- No NA Station, Receiving Station 14. Others (Option to Add more) No SADHAP TA.LLA.M C. Yours faithfully, CA/ Regad67 Signature & Name of Architect JADHAV.R.S Agreed &Accepted by: Signature shri.Hiroo Chimandas Gurusahani( promoter) ShREE HINGLAJMATA CONS^TRUCTIONS shree Hinglajmata construction (co-pormoter ) Date:31/I12/2024 Parthar