-N.G. Karkhane FLV, MISSE, MWWA, MACI (USA) B.E. (Hons.) (Pilani), M. Tech. (IIT, Mum.), FLE. Designer Structural * Consulting Civil Engineer Valuer (CAT|-474) Government Registered Property Engineer(F-11 1017-5) (M) 9823028081 Structural Auditor, Chartered Jalna Road, Aurangabad - 431 003. 'MOGRA' RanaNagar, Opp. Hotel Atithi. E-mail: ngkarkhane@gmail.com Annexure B FORM -2 [See Regulation 3] ENGINEER'S CERTIFICATE Withdrawal of (To be submitted at the time of Registration of Ongoing Project and for Money from Designated Account - Project Wise) Date: 31/12/2023 To The Shree Hinglajmata Constructions Row House No. A1/4, Tirupati Park, Gurusahani Nagar, N4 Cidco, Aurangabad. Subject: Certificate of Cost Incurred for Development of Gurusahani Twin Towers' having MahaRERA Registration Number P.51500048239 Only Applicable after project Registration) being Developed by Shree Hinglajmata Constructions. Sir, l I N.G. Karhane have undertaken assignment of Certifying Estimated Cost for Gurusahani Twin Towers, having Maha RERA Registration Number P-51500048239 (Only Applicable after project Registration being developed by Shree Hinglajmata Constructions. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers/ Consultants. The Schedule of Items & Quantity required for the entire work as calculated by N.G. Karhane Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. RKHA (AMC-59/89)c NG aforesaid estimate Total Estimated Cost of completion of the 3. We A& at Rs. 8.0 Cr. (Total of Table Project mentioned under reference Project is The estimated Total Cost of B) at the time of Registration. Allied Works completion of the with reference to the Civil, MEP & of internal & external works. apartments & proportionate completion per the specifications mentioned in the Agreement of Sale & for the as Certificate / Completion Certificate purpose of obtaining Occupation Plotted Development from the for the Building(s) IWingls) ILayout / whose jurisdiction 07/ 10/2023 being the Planning Authority under the aforesaid Project is being implemented. Rs. 6.0 Cr Total 4. The Estimated Cost incurred til date is calculates to is calculated of Table A & B). The Amount of Estimated Cost Incurred cost of these on the basis of input materials / services used && unit items. 5 The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 2.0Cr (Total of Table A& B). 6. ICertify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE-A Building / Wing / Layout / Plotted Development bearing RERA No. P51500048239 or called "Gurusahani Twin Towers' (to be prepared separately for each Building/Wing/Layout/Plotted Development of the Real Estate Project) S.No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building/ Wing / 8.00 Cr Layout / Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate 6.0 Cr 3. Work Done in Percentage (as Percentage of 75 % Estimated Cost) 4. Balance Cost to be incurred ** (based on 2.0 Cr Estimated Cost) Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) AMC-S9/89); TINGE TABLE- B Internal & External Development Works in respect of Registered Phase S.No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Internal & External Development Works including amenities & facilities in the Layout as on date of Registration is 2 Cost incurred as on date of Certificate 3 Work Done in Percentage (as Percentage of Estimated Cost) 4. Balance Cost to be incurred ** (based on Estimated Cost) 5. Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Yours Faithfully,y N.G. KARKHANE Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than Bachelor's Degree Holder or equivalent a per Section 2(u) of the Act] N.G. KARKHANE BEeas),M Tech. FIV,FE,MISSE MWAMACISA *CONSULTING CIVIL ENGINeER 'STRUCTURAL DESIGNER'STRUCTURAL AUDITOR. *CHARTERED ENGINESR 'GOVT. REGT. PROPERTY VALUER ASh, Rana Nagar. Jetna Roed, "Mogra" Opp. HotlPn.:(0) |Aurangabad-491005, 0240-2452305, (R485 53. Mo-99230ROS1.6-1ankarkhne gmall. om Local Authority license no. (If applicable) Agreed and Accepted by: Constructions Signature for on behalf of Shree Hinglaimata SREE HINGLAJIATA C0NSTRUCIIONS Name : DEVENDRA A. DESHPANDE Date : For on behalf of Land Owner / Promoter DR. HIROO C. GURSAHANI (Personnel Capacity) Note : as per work is to complete Registered Real Estate Project specifications The scope of per 1. time to time and as drawings approved from mentioned in agreement of sale. can be done survey can be done by office of Engineer or of quantity 2. () Quantity certificate Quantity Surveyor, whose case of independent by an independent upon by the Engineer. In calculated can be relied name has to be surveyor being appointed by Developer, the being quantity the place marked (") and in case quantity areoffice of mentioned at in the the name of the person calculated by office of Engineer, the quantity calculated should be for Engineer, who is responsible (*). mentioned at the place marked between be incurred (4) may vary from Difference (**) Balance Cost to to deviation 3. Actual Cost incurred (2) due estimated Total estimated Cost (1) and this is an escalation of cost etc. As in quantity required / quantity required for development of the Real cost any deviation in amendment of the cost incurred / to be Estate Project will result in incurred. with specifications are indicative and not 4. All comnponents of work exhaustive. deviations/ qualifications. Example: 5 Please specify if here are any used from specifications in Any deviations in input material agreement of sale. Table C considered in Cost. List of Extra/Additional /Deleted Items of Total Cost) (which were not part of the original Estimate Amount (in Rs.) Sr.No. List of Extra/Additional/Deletes Items 1. 2.