R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA CONTACT: +91 7875558825, e-mail : jbandassociate1 @gmail.com 3ASSOeATs CIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM1 [See Regulation 3] ARCHITECT'SCERTIFICATE Ongoing Project & for Withdrawal of (To be su bmitted at the time of Registration of Money from Designated Account) Date: 31/03/2024 To, Shree Hinglajmata construction, RIH No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Certificate of Percentage of Completionof Construction Work of 'GURUSAHANI Subject: cidco Aurangabad having TWIN TOWER" situated at plot No-138,S.No-15,N-4 MahaRERA Registration Number (P51500048239 ) being Developed by Hinglajmata shri. Hiroo Chimandas Gurusahani( promoter) & shree construction (co-pormoter ) Sir, Surveyor of Certifying Percentage of /We have undertaken assignment as Architect /Licensed TOWER" having MahaRERA Completion of Construction Work of 'GURUSAHANI TWIN Hiroo Chimandas Registration Number (P51500048239) being developed by shri. (co-pormoter ) Gurusahani (promoter) &shree Hinglajmata construction / each Building/Wing of the aforesaid Based on the Site Inspection, with respect to the Layout Certificate, the Percentage of Work Done for Real Estate Project, Icertify that as on date of this under MahaRERA is as per Table-A herein Project each of the Building/Wing of the Real Estate to each of the activity of entire Phase is respect below. The percentage of work executed with detailed in Table-B. TABLE-A Layout / Building / Wing Number:Stand alone single building having only one wing Percentage of Actual Work S. Tasks IActivity Done No. (As on date of the Certificate) (2) (3) (1) 100 % 1. Excavation 95 % 2. Basements (if any) 3. Podiums (if any) 4 Plinth 100 % Stilt Floor 100 % 6 Slab of Super Structure 80 % 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats / Premises 80 % 8 Sanitary Fittings within Flats / Premises Staircases, Lift Wells & Lobbies at each Floor Level 90 % Overhead and Underground Water Tanks 80 % 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings Electrical Fittings, and Equipments as per CFO NOC, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant and all other to Building/Wing, Compound Wallcomplete Project requirements as may be required to Sale, Any other as per specifications to Agreement of Activity TABLE-B Works) in respect of the Registered Phase / Common Areas (Internal & External Development Project Number Percentage of Details Common Areas & Facilities Proposed S. (Yes / NO) actual Work No. Done (As on date of Certificate) (3) (4) (5) (1) (2) AMC Roads No 1. Internal Roads & Footpaths As per details Yes from 2 Water Supply obtained Consultant AMC chamber line 3 Sewerage (Chamber Lines, Yes Septic Tank, STP) Strom VWater Drains No oooo NA 4 NA 5 Landscaping &Tree Planting No No 0 NA 6 Street Lighting NA 7. Community Buildings No NA 8. Treatment & Disposal of Sewage No and Sullage Water NA 9. Solid Waste Management & No Disposal As per details 10. Water Conservation / Rain Water Yes obtained from Harvesting consultant Energy Management No As per details from 11. Yes Safety 12. Fire Protection & Fire Consultant/ fire NOC requirements NA Electrical Meter Room, Sub No 13. Station, Receiving Station No 14. Others (Option to Add more) Rog.bo, 2 Yours faithfully, CA10498. Signature &Name of Architect JADHAV R.S Agreed &Accepted by: Signature SHREE HINGLAJMATACONSTRUCTIONS shri.Hiroo Chimandas Gurusahani( promoter) shree Hinglajmata construction (co-pormoter Partner Date:31/04/2024