R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA CONTACT:+91 7875558825, e-mail : jbandassociate1(@gmail.com J.3. ASS0CIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM1 |See Regulation 3] ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project &s for Withdrawal of Money from Designated Account) Date: 31/12/2023 To, Shree Hinglajmata construction, R/H No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Subject: Certificate of Percentage of Completion of Construction Work of 'GURUSAHANI TWIN TOWER" situated at plot No-138,S.No-15, N-4 cidco Aurangabad having MahaRERARegistration Number (P51500048239 ) being Developed by shri. Hiroo Chimandas Gurusahani( promoter) & shree Hinglajmata construction (co-pormoter ) Sir, /We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of GURUSAHANI TWIN TOWER" haing MahaRERA Registration Number (P51500048239) being developed by shri. Hiroc Chimandas Gurusahani (promoter) &shree Hinglajmata construction (co-pormoter ) Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesa1d Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for eachof the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A single building having only one wing 081 Lavout /Building /Wing Number: Stand alone Percentage of ActualWork Tasks / Activity Done S. No. (As on date of the Certificate) (3) (2) 100 % (1) 1. Excavation 95 % 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100 % 5 Stilt Floor 100 % 6 Slab of Super Structure 70 % Plaster, Floorings, Doors, 7 Internal Walls, Internal windows within Flats / Premises 70 % Sanitary Fittings within Flats / Premises Floor Level 80% Staircases, Lift Wells & Lobbies at each Overhead and Underground Water Tanks 65 % Elevation, 10. External Plumbing & External Plaster, of the Completion of Terraces, with waterproofing Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings Electrical Fittings, and Equipments as per CFO NOC, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall complete and all other requirements as may be required to Project Agreement of Sale, Any other as per specifications to Activity TABLE-B Phase / Common Areas (Internal & External Development Works) in respect of the Registered Project Number Common Areas & Facilities Proposed Percentage of Details S. (Yes / NO) actual Work No. Done (As on date of Certificate) (1) (2) (3) (4) (5) 1 Internal Roads &Footpaths No 0 AMC Roads As per detals 2 Water Supply Yes 0 from obtained Consultant AMC chamber line 3. Sewerage (Chamber Lines, Yes Septic Tank, STP) oooc NA Strom VWater Drains No 4 NA No 5 Landscaping & Tree Planting NA No 6. Street Lighting No NA 7 Community Buildings NA No 8 Treatment & Disposal of Sewage and Sullage Water NA Management &No 9 Solid Waste Disposal As per details Water Yes 0 10. Water Conservation / Rain obtained from Harvesting Consultant No 11 Energy Management As per details from Yes Fire Protection & Fire Safety consultant/ fire NOC 12. requirements NA Electrical Meter Room, Sub No 13. Station, Receiving Station No 14. Others (Option to Add more) Yours faithfully, Signature & Name of Architect JADHAV .R.S Agreed &Accepted by: Signature shri.Hiroo Chimandas Gurusahani( promoter) SHREE HINGLAJMATA CONSTRUCTIONS shree Hinglajmata construction (co-pormoter ) Date:31/12/2023 Partnar