R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA a CONTACT: +91 7875558825, e-mail: jbandassociate1@gmail.com J. B. ASSOCIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM 1 [See Regulation 31 ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 30109/2023 To, Shree Hinglajmata construction, RlH No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Subject: Certificate of Percentage of Completion of Construction Work of 'GURUSAHANI TWIN TOWER" situated at plot No-138,S.No-15,N-4 cidco Aurangabad having MahaRERA Registration Number ( P51500048239 ) being Developed by shri. Hiroo Chimandas Gurusahani( promoter) & shree Hinglajmata construction (co-pormoter ) Sir, I / We have undertaken assignment as Architect 1 Licensed Surveyor of Certifying Percentage of Completion of Construction Work of 'GURUSAHANI TWIN TOWER" having MahaRERA Registration Number (P51500048239) being developed by shri. Hiroo Chimandas Gurusahani (promoter) & shree Hinglajmata construction (co-pormoter ) Based on the Site Inspection, with respect to the Layout 1 each BuildinglWing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildinglWing of the Real Estate Project under MahaRERA is as per Table-A herein . below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. ( \ <. TABLE-A Layout / Building / Wing Number: Stand alone single building having only one wing s. Tasks I Activity Percentage of Actual Work I No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100 % 2. Basements (if any) 95% 3. Podiums (if any) 0 / 4. Plinth 0 5. Stilt Floor 100 % 6. Slab of Super Structure 100 % 7. Internal Walls, Internal Plaster, Floorings, Doors, 60 % windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 50% 9. Staircases, Lift Wells & Lobbies at each Floor Level 70% Overhead and Underground Water Tanks to. External Plumbing & External Plaster, Elevation, 60% Completion of Terraces, with waterproofing of the BuildinQ / Wing lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 0 : 11. and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildinglWing, Compound Wall and a" other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity I TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number s. Common Areas & Facilities Proposed Percentage of Details No. (Yes I NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No 0 AMC Roads 2. Water Supply Yes 0 As per details I obtained from I ------------------------ __ ----------. ---- consultant 3. Sewerage (Chamber Lines, Yes 0 AMC chamber line Septic Tank, STP) 4. Strom Water Drains No 0 NA 5. Landscaping & Tree Planting No 0 NA 6. Street Lighting No 0 NA 7. Community Buildings No 0 NA 8. Treatment & Disposal of Sewage No 0 NA and Sullage Water ! 9. Solid Waste Management & No 0 NA Disposal 10. Water Conservation 1 Rain Water Yes 0 As per details Harvesting obtained from consultant 11. Energy Management No 0 12. Fire Protection & Fire Safety Yes 0 As per details from requirements consultant! fire NOC 13. Electrical Meter Room, Sub- No 0 NA Station, Receiving Station 14. Others (Option to Add more) No 0 Yours faithfully, Signature & Name of Architect JADHAV.R.S Agreed & Accepted by: Signature shri.Hiroo Chimandas Gurusahani( promoter) shree Hinglajmata construction (co-pormoter ) Date: 30109/2023