fl. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA o CONTACT: +91 7875558825, e-mail: jbandassociate1@gmail.com J. B. ASSOCIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 01/03/2023 To, Shree Hinglajmata construction, R/H No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of 'GURUSAHANI TWIN TOWER" situated at plot No-138,S.No-15,N-4 cidco Aurangabad having MahaRERA Registration Number ( P51500048239 ) being Developed by shri. Hiroo Chimandas Gurusahani( promoter) & shree Hinglajmata construction (co-pormoter ) Sir, I 1We have undertaken assignment as Architect 1 Licensed Surveyor of Certifying Percentage of Completion of Construction Work of 'GURUSAHANI TWIN TOWER" having MahaRERA Registration Number (P51500048239) being developed by shri. Hiroo Chimandas Gurusahani (promoter) & shree Hinglajmata construction (co-pormoter) Based on the Site Inspection, with respect to the Layout 1 each BuildinglWing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildinglWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. / TABLE-A Layout I Building I Wing Number: Stand alone single building having only one wing s. Tasks I Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100 % 2. Basements (if any) 90% 3. Podiums (if any) 0 4. Plinth 0 5. Stilt Floor 90% 6. Slab of Super Structure 90% 7. Internal Walls, Internal Plaster, Floorings, Doors, 5% windows within Flats I Premises 8. Sanitary Fittinos within Flats I Premises 0 9. Staircases, Lift Wells & Lobbies at each Floor Level 30% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 0 Completion of Terraces, with waterproofing of the Building I Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 0 and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase I Project Number s. Common Areas & Facilities Proposed Percentage of Details No. (Yes I NO) actual Work Done (As on date of Certificate (1 3 5 1. AMC Roads 2. As er details obtained from 3. consultant Sewerage (Chamber Lines, Yes 0 AMC chamber line Septic Tank, STPl 4. Strom Water Drains No 0 NA 5. Landscaping & Tree Planting No 0 NA 6. Street Lighting No 0 NA 7. Community BUildil}gs No 0 NA 8. Treatment & Disposal of Sewage No 0 NA and Sullage Water 9. Solid Waste Management & No 0 NA Disposal 10. Water Conservation / Rain Water Yes 0 As per details Harvesting obtained from consultant 11. Energy Management No 0 12. Fire Protection & Fire Safety Yes 0 As per details from requirements 13. consultant/ fire NOC Electrical Meter Room, Sub- No 0 NA Station, Receiving Station 14. Others (Option to Add more) No 0 .Yours faithfully, Signature & Name (in block letters) Architect JADHAV.R.S Agreed & Accepted by: Signature .shri.Hiroo Chimandas Gurusahani( promoter) shree Hinglajmata construction (co-pormoter) Date:01/03/2023