Er. Aditya Anil Pawar Civil Engineer Annexure - B FORM - 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date'. 12-07-2026 To, NANDAN CONSTRUCTIONS, PLOT NO 51, MAHESH NAGAR, CHHATRAPATI SAMBHAJI NAGAR B having Certificate of Cost lncurred for Development of NANDAN VATIKA WING Subject: by NANDAN MahaRERA Registration Number P51500047993 being developed CONSTRUCTIONS. (FOR APR to JUN 2026 QTR) Sir, Cost 1 I / We Er. Aditya Anil pawar have undertaken assignment of Certifying Estimated P51500047993 being NANDAN VATTKA W|NG B having MahaRERA Registration Number developed by NANDAN CONSTRUCTIONS' of the 2 We have estimated the cost of Civil, MEP and Allied Works required for completion apartments & proportionate completion of internal & external works of the Project as per the calculations are based specifications mentioned in the Agreement of sale. our estimated cost by the on the Drawings/Plans made available to us for the Project under Reference for the entire work as Developers / consultants. The schedule of ltems & Quantity required the assumption of the calculated by Quantity Surveyor* appointed by the Developer/Engineer, cost of material, taoour & other inputs made by the Developer, and the site lnspection carried out by us to ascertain / confirm the above analysis given to us' mentioned under 3 We estimate Total Estimated Cost of completion of the aforesaid Project atthetimeof Registration The referenceat Rs.8,10,00,000/-(Total ofTableA&B) estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion per the of the apartments & proportionate completion of internal & external works, as purpose of obtaining Occupation specifications mentioned in the Agreement of Sale & for the Certificate / Comptetion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the CHHATRAPATI SAMBHAJI NAGAR MUNICIPAL CORPORATION being the is being implemented Planning Authority under whose jurisdiction the aforesaid Project (Total of Table A & B)' 4 The Estimated Cost incurred tilldate is calculates to Rs. 6,78,15,000/- j.s.qa.l.qutate.d..-o.n..th.e..besis..qf. jnpu.t.m.a.te.ria.is.l-s.e-rytses The Amount of .Est!mat-e._d..Q9gt.tn9.u.r.r.e..d. u se-d..&. u n it.c..qst.qf .th.e.s.e. !te ms 5. The Balance cost of completion of the civil, MEP & Allied works for completion of per specifications aS Apartments & proportionate completion of internal & external works, mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 1,31,85'000/- (Total of Table A & B). Er. Aditya Anil Pawar Civil Engineer 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE. A / Lavout / Plotted Number of NANDAN VATIKA WING B S. No. Particulars Amount (in Rs.) 1 Total Estimated Cost of Building / Wing / Layout / Plotted Rs. 7,35,00,000/- Development as on date of Reqistration is 2 Cost incurred as on date of Certificate - 30 JUN 2026 Rs. 6,'17 ,40.0001- 3 Work Done in Percentage (as Percentage of Estimated B4% Cost) 4 Balance Cost to be incurred ** ((based on Estimated Rs. 1,17,60,0001 Cost) 5 Cost incurred on Additional/ Extra ltems not included in the Estimated Cost (Table-C) TABLE - B nternal & External Development Works of NANDAN VATIKA WING B S. No. Particulars Amount (in Rs.) 1 Total Estimated Cost of lnternal & External Development Rs. 75,00,0001 Works including amenities & facilities in the Layout as on date of Registration is 2 Cost incurred as on date of Certificate - 30 JUN 2026 Rs. 60,75,0001 3 Work Done in Percentage (as Percentage of Estimated 81% Cost) 4 Balance Cost to be incurred .. ((based on Estimated Rs. 14,25,000/- Cost) 5 Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) Yours faithfully, rlg{^tl9e r Er. Ad itya A"H Signature & Name (lN BLOCK LETTERS)with Stamp of Engineer Local Authority License Number (if applicable) Agreed & Accepted by: Signature of Promoter Name: NANDAN Date: 12-07-2026 Note: Er. Aditya Anil Pawar Civil Engineer 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (.) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional/ Deleted ltems considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional/ Deleted Items Amount (in Rs.) 1 2