Archipel Architects archipel qrchitects Architects, Planners, Interior Designers Bhagya Nagar, Adalat Road, Aurangabad. Add.: 04, Phone:0240-6531891, Cell :98 23 231891 Ar.Kapil Gujarathi ARCHITECTS CERTIFICATE Date: 15/7/2024 To, MRUNAL CONSTRUCTION, Harsiddhi Plot No. 1, Survey No.179/6, Harsul, Housing Society, Jalgaon Road, Aurangabad. Leaves Construction Work of Project 21- Certificate of Percentage of completion of M/S MRUNAL Subject: developed by Number P51500048155, being having MahaRERA Registration CONSTRUCTION. assignment of certifying Percentage of ARCHITECTS have undertaken Sir, I/ We ARCHIPEL under MAHA RERAI Project 21-Leaves (to be registered completion of Construction Work of with respect to WS MRUNAL CONSTRUCTION. Based on Site Inspection, being developed by that as on the date of Building/Wing of the aforesaid Real Estate Project, I certify each of the building /wing of the Real Estate of Work done for each of the this certificate, the Percentage MAHARERA] is, as per table A herein [to be registered under Project as registered vide number each of the major activity of the percentage of the work executed with respect to below. The is detailed in the Overall Percentage of work done with respect to each Building 21-Leaves and Table B. Table - A each Building (Wing of the project) (To be prepared separately for Building (APRIL TOJUN2024) TASKS 1 ACTIVITY % OF SR.NO. wORKDONE 100% Excavation 0 100% 02 1Number of Plinth 0% Number of Basement Floor O 03 100% 04 1 Number of Stilt Floor 100% Structure 05 8 Number of Slabs of Super within 90% Internal walls, Internal Plaster, Flooring each of the Flat 06 Flats/Premises, Doors and Windows to Premises 65% Flat/Premises, Electrical Sanitary Fittings within the 07 Fittings within the Flat/Premises Floor 95% Lobbies at each Staircases, Lifts Wells and Lifts, Overhead and 08 level connecting Staircases and Under ground Water Tanks 70% extemal plaster, elevation, 09 The extemal plumbing and waterproofing of the completion of terraces with Building/Wing, AMBHA. ,ARCHIA GAR Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to 60% 10 entrance lobby's, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation (Completion Certificate Table - B (Untemal &Extemal Development Works in Respect of the entire Registered Phase) PROPOSED DETAILS SR.NO. TASKS 1 ACTIVITY (YES/NO) WORKDONE 01 Internal Roads & Footpaths No 0% As per drawings by Consultants 02 Yes 30% As per drawings by Water Supply Consultants 03 Sewerage (chamber, lines, 35% As per drawings by septic Tank, STP Yes Consultants 04 As per drawings Storm Water Drains No 0% by Consultants 05 Landscaping & Tree As per drawings by No 0% Consultants Planting 06 Aggregate Area of As per drawings by No 0% Consultants Recreational open Space 07 Street Lighting As per drawings by No 0% Consultants No 0% Not Applicable 08 Community Buildings 09 Treatment and As per drawings by disposal of sewage No 0% Consultants and sullage water Solid Waste arrangement As per drawings by 10 and No 0% Consultants Disposal Water conservation, As per drawings by 11 Yes 25% Consultants Rain waterharyesting cHIPE, ARCHI CAI04134894 2/3, MULEY. IAPADIA n COMPLEX. JALNA ROAI, Asper drawings by No 0% Consultants 12 Energy management Fire protection and fire As per drawings by No 0% Consultants 13 safety requirements Electrical meter room. As per drawings by Substation, receiving Yes 0% Consultants 14 station Others. Compound wall As per drawings by 15 Yes 90% Consultants & Entrance Gate & 45.0% for internal & external Overall project completion is 87.00% for building development works. Yours Faithfully, AIPELARGHIT For CAI04/34894 ARCAIPELARHTECTS 2/3, MULEY. TAPADIA O COMPLEX, JALNA ROAD, SAMBH 4JINA MeCNAS eONSTRUCTION Name :- M/S MAÖNA TcONSTRUCTION Date :- 15/7/2024