Archipel Architects archipel architects Architects, Planners, Interior Designers Add.: 04, Bhagya Nagar, Adalat Road, Aurangabad. Phone : 0240-6531891, Cell: 98 23 231891 Ar.Kapil Gujarathi ARCHITECTSCERTIFICATE Date: 15/4/2024 To, MRUNAL CONSTRUCTION, Plot No. 1, Survey No.179/6, Harsiddhi Housing Society, Jalgaon Road, Harsul, Aurangabad. Work of Project 21- Leaves Subject: Certificate of Percentage of completion of Construction by M/S MRUNAL having MahaRERA Registration Number P51500048155, being developed CONSTRUCTION. Percentage of Sir, I/ We ARCHIPEL ARCHITECTS have undertaken assignment of certifying under MAHA RERAI completion of Construction Work of Project 21-Leaves [to be registered being developed by WS MRUNAL CONSTRUCTION. Based on Site Inspection, with respect to on the date of each of the Building/Wing of the aforesaid Real Estate Project, I certify that as building wing of the Real Estate this certificate, the Percentage of Work done for each of the table Aherein Project as registered vide number [to be registered under MAHA'RERA] is, as per below. The percentage of the work executed with respect to each of the major activity of the 21-Leaves and Overall Percentage of work done with respect to each Building is detailed in the Table B. Table - A (To be prepared separately for each Building (Wing of the project) Building (JAN TOMAR 2024) TASKS 1 ACTIVITY % OF SR.NO. WORKDONE 100% 01 Excavation 1Number of Plinth 100% 02 0 Number of Basement Floor 0% 03 100% 04 1Number of Stilt Floor 100% 8 Number of Slabs of Super Structure Internal walls, Internal Plaster, Flooring within 85% 06 Flats/Premises, Doors and Windows to each of the Flat Premises Sanitary Fittings within the Flat/Premises, Electrical 60% 07 Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor 95% 08 level connecting Staircases and Lifts, Overhead and Under ground Water Tanks NRCHIS CAIDM4894 213,MULLY IAPADIA COMPLEX JALNA ROAD, SAMBH JINAC elevation, 65% 09 The external plumbing and external plaster, completion of terraces with waterproofing of the Building/VWing, Installation of lifts, water pumps, Fire Fighting Fittings fittings to and Equipment as per CF0 NOC, Electrical Compliance Common Areas, electro, mechanical equipment, environment/CRZ NOC, Finishing to 50% to conditions of 10 entrance lobby's, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other reguirements as may be required to Obtain Occupation (Completion Certificate Table- B (Intemal & Extemal Development Works in Respect of the entire Registered Phase) PROPOSED DETAILS SR.NO. TASKS 1 ACTIVITY (YES/NO) WORKDONE 01 Internal Roads & Footpaths No 0% As per drawings by Consultants 02 Yes 15% As per drawings by Water Supply Consultants 03 Sewerage (chamber, lines, 20% As per drawings by septic Tank, STP Yes Consultants 04 As per drawings Storm Water Drains No 0% by Consultants 05 Landsca ping & Tree As per drawings by No 0% Consultants Planting 06 As per drawings by Aggregate Area of No 0% Consultants Recreational open Space 07 Street Lighting As per drawings by No 0% Consultants 08 Community Buildings No 0% Not Applicable 09 Treatment and As per drawings by No 0% Consultants disposal of sewage and sullage water Solid Waste arrangement As per drawings by 10 and No 0% Consultants Disposal HIPEL RCHITS CAI04/34894 213, MULLY 1APADIA COMPLEX, JALNA ROAD, SAN As per drawings by 11 Water conservation, Yes 10% Consultants Rain water harvesting As per drawings by 12 No 0% Consultants Energy management Fire protection and fire As per drawings by 13 No 0% Consultants safety requirements Electrical meter room. As per drawings by 14 Substation, receiving Yes 0% Consultants station Others. Compound wall As per drawings by 15 Yes 85% & Entrance Gate Consultants Overall project completion is 85.00% for building & 40.0% for internal & external development works. Yours Faithfully, MPEL, ARCHI Fok CAIO4/34894 213. MULEY. TAPADIA ARCHJPÉLARCHITECTS COMPLEX, JALNA ROAD, SAMBH JI MRIGAAE 80N6TRUCTION PARTNER Name :- M/S MRÜNAL CONSTRUCTION Date :- 15/4/2024