Archipel Architects archipel architects Architects, Planners, Interior Designers Add.: 04, Bhagya Nagar, Adalat Road,Aurangabad. FORM 1 [see Regulation 3] Phone: 0240-6531891, Cell:98 23 231891 Ar.Kapil Gujarathi ARCHITECTS CERTIFICATE Date: 15/1/2024 To, MRUNAL CONSTRUCTION, Plot No. 1, Survey No.179/6, Harsiddhi Housing Society, Jalgaon Road, Harsul, Aurangabad. Construction Work of Project 21- Leaves Subject: Certificate of Percentage of completion of being developed by M/S MRUNAL having MahaRERA Registration Number P51500048155, CONSTRUCTION. of certifying Percentage of Sir, I/ We ARCHIPEL ARCHITECTS have undertaken assignment be registered under MAHA RERAI completion of Construction Work of Project 21-Leaves [to on Site Inspection, with respect to being developed by WS MRUNAL CONSTRUCTION. Based Project, Icertify that as on the date of each of the Building/Wing of the aforesaid Real Estate the building /wing of the Real Estate this certificate, the Percentage of Work done for each of MAHA RERA] is, as per table A herein Project as registered vide number [to be registered under activity of the respect to each of the major below. The percentage of the work executed with respect to each Building is detailed in the 21-Leaves and Overall Percentage of work done with Table B. Table A project) (To be prepared separately for each Building {Wing ofthe Building (JULY TO SEPT 2022) TASKS 1 ACTIVITY % OF SR.NO. WORKDONE 100% Excavation 01 100% 02 1Number of Plinth 0% 03 ONumber of Basement Floor 100% 04 1 Number of Stilt Floor 100% 05 8 Number of Slabs of Super Structure 80% Internal walls, InternalPlaster, Flooring within 06 Flats/Premises, Doors and Windows to each of the Flat Premises Electrical 45% Sanitary Fittings within the Flat/Premises, 07 Fittings within the Flat/Premises IPEL ARCK 95% Staircases, Lifts Wells and Lobbies at each Floor 08 level connecting Staircases and Lifts, Overhead and CWoH/34894 (4, BHAGYA Under ground Water Tanks NAGAR, ADALAT ROAD AUR GABAO 09 The external plumbing and external plaster, elevation, 50% completion of terraces with waterproofing of the Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas,electro, mechanical equipment, Compliance 10 to conditions of environment/CRZ NOC, Finishing to 0% entrance lobby's, plinth protection, paving of areas appurtenantto Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation [Completion Certificate Table - B (Internal &External Development Works in Respect of the entire Registered Phase) PROPOSE DETAILS SR.NO. TASKS 1 ACTIVITY D (YES/NO) WORKDONE 01 Internal Roads & Footpaths No 0% As per drawings by Consultants 02 Yes 0% As per drawings by Water Supply Consultants 03 Sewerage (chamber, lines, 0% As per drawings by septic Tank, STP Yes Consultants 04 As per drawings Storm Water Drains No 0% by Consultants 05 Landscaping &Tree As per drawings by No 0% Consultants Planting 06 Aggregate Area of As per drawings by No 0% Consultants Recreational open Space 07 Street Lighting As per drawings by No 0% Consultants 08 Community Buildings No 0% Not Applicable 09 Treatment and As per drawings by disposal of sewage and No 0% Consultant[ kotL ARCE Sullage water CA/04/34394 Solid Waste rmanagement As per drawings by , SHAGYA CTS NAGAR, 10 No 0% Consultants ADALAT ROAD Disposal AURANGABA9 11 Water conservation, As per drawings by Yes 0% Consultants Rain water harvesting 12 No 0% As per drawings by Energy management Consultants Fire protection and fire As per drawings by 13 No 0% safety requirements Consultants Electrical meter room. As per drawings by 14 Substation, receiving Yes 0% Consultants station 15 Others. Compound wall & As per drawings by Entrance Gate Yes 85% Consultants Overall project completion is 83.00% for building & 29.0% for internal &external development works. Yours Faithfully, ARCRE CA/04/34894 04, BHAGYA NAGAR, ADALAT ROAD For ARCHPEL ARCHITECTS AURANGAS Agreed & MRUNAL&SRBRUCTION PARTNER Name:- M/S MRUNAL CONSTRUCTION Date :- 15/1/2024