Satish Shinde M.E. (Civil) M.I.E. F.I.V STRUCTURAL DESIGNER APPROVED VALUER Off. 110, Amber Plaza-A, Opp. S.T. Stand, Ahmednagar, Ph: 5601435, Mob: 94227-38260 Annexure - B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) To, Date:31/03/2025 M/s. Trishul Constructions, 101, Veer Shanti, Kranti Chowk, Aurangabad. Subject: Certificate of Cost Incurred for Development of Project named as MAHARERA Registration No.PS1500048055 being developed Tridal-B', having by M/s. Trishul Constructions. Sir, 1. VWe Faiz Abdul Majeed Sagri have undertaken assignment of Certifying Tridal-B', having MAHARERA Registration No.P51500048055 being Estimated Cost for Trishul Constructions. developed by M/s. 2. We have estimated the cost of Civil, MEP and Alied Works required for apartments & proportionate completion of internal & external works of the completion of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost the Drawings/Plans made available to us for the Project calculations are based on under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as Abdul Majeed Sagri Quantity Surveyor* appointed by the calculated by Faiz the cost of material, labour & other inputs made by the Developer/Engineer, the assumption of Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid reference at Rs.4,15,00,000- (Total of Table A & B) at the time of Project mentioned under Total Cost of Project is with reference to the Civil, Registration. The estimated MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per mentioned in the Agreement of Sale & for the purpose of the specifications obtaining Occupation Certificate / Completion Certificatefor the Building(s) / Wing(s) /Layout /Plotted Development Town Planning Dept.(Aurangabad Municipal Corporation) dated from the Authority under whose jurisdiction the aforesaid Project is being 30/05/2022 being the Planning implemented. 4. The Estimated Cost incurred till date is calculates to Rs.3,40,00,000 /-Total of Table A & B). The Amount of Estimated Cost Incurred is calculated on the basis of unit cost of input materials /services used & these items. The Ralance Cost of completion of the Civil, MEP &Allied Works for completion of Apartments mentioned in & proportionate completion of internal & external works, as per specifications Agreement of Sale, of the aforesaid Project is estimated at Rs 75,00,000/- (Total of Table A R B) proportionate internal & 6. 1Certify that the cost of Civil, MEP & Allied Work for apartments & Sale, of the aforesaid Project external works, as per the specifications mentioned in Agreement of in Table A & B below: as completed on the date of this certificate is as given TABLE-A Building Wing/LayoutPlotted Development called (Tridal-B)' Particulars Amount (in Rs.) Sr. No. 3,45,00,000/ 1. Total Estimated Cost of Building / Wing / Layout / Plotted Development as on date of Registration is 2,75,00,000/ 2 Cost incurred as on date of Certificate 79.71% 3 Work Done in Percentage (as Percentage of Estimated Cost) 70,00,000/ 4 Balance Cost to be incurred ** (based on Estimated Cost) 5 Cost incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) TABLE-B Internal & External Development Works in respect of the Project Sr. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of Internal & External 70,00,000/ Development Works including amenities & facilities in the Layout as on date of registration is 2. Cost incurred as on date of Certificate 65,00,000/ 3. Work Done in Percentage (as Percentage of Estimated 92.86% Cost) 4. Balance Cost to be incurred ** ((based on Estimated S,00,000/ Cost) Cost incurred on Additional/Extra Items not included in the Estimated Cost (Table-C) Yours faithfully, Er. Sarish Shinde (Structural Engineer) [Not less than Bachelor 's Degree Holder or equivalent as per Section 2(u) of the Act) LocalAuthority License Number: E/393/04 Agreed &Accepted by: Signature for and behalf of Promoter Name: Mr. Nageshwar Kunjar Date: 31.03.2025 Note: Estate Project as per drawings approved I. The scope of work is tocomplete Registered Real Agreement to Sale. from time to time as per specifications mentioned in the Engineer or can be done by an independent 2. () Quantity Survey can be done by the office of Calculated, can be relied up on by Quantity Surveyor, who's Certificate of Quantity appointed by Developer, the name Engineer. In case of independent quantity surveyor being in case quantity are being calculated by office has to be mentioned at the place marked (*) & Engineer, who is responsible for the quantity of Enginee, the name of person in the office of calculated should be mentioned at the place marked (*). Cost vary from difference between Total Estimated 3. (**) Balance Cost to be incurred (4) may etc. As required / escalation of cost (1)&actual Cost incurred (2) due to deviation in quantity required for the Development of Real Estate this is an Estimated Cost any deviation quantity / to be incurred. Project will result in an amendment of the cost incurred & not exhaustive 4. All components of work with specifications are indicative Any deviation in input S. Please specify if there are any deviations /qualifications. Example: material used from specifications in Agreement of Sale. TABLE -C List of Extra/ Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra/Additional / Deleted Items Amount (in Rs.) 2