FORM 1 [see Regulation 3) Archipel Architects archipel architects ARCHITECTS CERTIFICATE Architects, Planners, Interior Designers Add.: 04,Bhagya Nagar, Adalat Road, Aurangabad. Phone : 0240-6531891, Cell: 98 23231891 Date: 15/10/2023 Ar.Kapil Gujarathi To, MRUNAL CONSTRUCTION, Harsiddhi Plot No. 1,Survey No.179/6, Housing Society, Jalgaon Road, Harsul, Aurangabad. Project 21- Leaves Percentage of completion of Construction Work of Subject: Certificate of M/S MRUNAL Registration Number P51500048155, being developed by having MahaRERA CONSTRUCTION. Percentage of ARCHIPEL ARCHITECTS have undertaken assignment of certifying Sir, I/ We under MAHA RERAI Project 21-Leaves [to be registered completion of Construction Work of with respect to by WS MRUNAL CONSTRUCTION. Based on Site Inspection, being developed that as on the date of Building/Wing of the aforesaid Real Estate Project, I certify each of the the Real Estate the Percentage of Work done for each of the building /wing of this certificate, is, as per table A herein registered vide number [to be registered under MAHA RERA] Project as major activity of the percentage of the work executed with respect to each of the below. The Building is detailed in the work done with respect to each 21-Leaves and Overall Percentage of Table B. Table - A Building (Wing of the project) (To be prepared separately for each Building (JULY TO SEPT 2022) TASKS 1ACTIVITY % OF SR.NO. WORKDONE 100% Excavation 01 100% 02 1 Number of Plinth 0% 03 ONumber of Basement Floor 100% 04 1 Number of Stilt Floor 100% Structure 05 8 Number of Slabs of Super Flooring within 70% Internal walls, Internal Plaster, Flats/Premises, Doors and Windows to each of the Flat 06 Premises Flat/Premises, Electrical 25% Sanitary Fittings within the 07 Fittings within the Flat/Premises each Floor 95% at Staircases, Lifts Wells and Lobbies Lifts, Overhead and 08 level connecting Staircases and Under ground Water Tanks 50% plaster, elevation, 09 The external plumbing and external RIPEL completion of terraces with waterproofing of the ARCH Building/Wing, 4, SAGYA NAGAR, ADALAT ROAD URANGABD Installationof lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance 0% 10 to conditions of environment/CRZ NOC, Finishing to entrance lobby's, plinth protection, paving of areas apartment to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation [Completion Certificate Table -B entire Registered Phase) (Internal & External Development Works in Respect of the PROPOSED DETAILS SR.NO. TASKS 1 ACTIVITY (YES/NO) WORKDONE 0% As per drawings by 01 Internal Roads & Footpaths No Consultants Yes 0% As per drawings by 02 Consultants Water Supply 0% As per drawings by 03 Sewerage (chamber, lines, Consultants septic Tank, STP Yes 04 As per drawings Storm Water Drains No 0% by Consultants Landscaping & Tree As per drawings by 05 0% Consultants No Planting As per drawings by 06 Aggregate Area of 0% Consultants No Recreational open Space As per drawings by 07 Street Lighting 0% No Consultants Community Buildings No 0% Not Applicable 08 Treatment and As per drawings by 09 No 0% Consultants disposal of sewage and sulage water As per drawings by Solid Waste management Consultants 10 & No 0% Disposal As per drawings by Water conservation, Yes 0% Consultants 11 Rain water harvesting NGABS As per drawings by No 0% Consultants 12 Energy management As per drawings by Fire protection and fire No 0% Consultants 13 safety requirements Electrical meter room. As per drawings by 0% Consultants 14 Substation, receiving Yes station As per drawings by Others. Compound wall 15 Yes 75% Consultants & Entrance Gate external for building & 25.0% for internal & Overall project completion is 80.00% development works. Yours Faithfully, ARCE CA/04/34394 CTS 04, BHAGYA NAGAR, ADALAT ROAD For URANGGABPS ARCHIPEL ARCHITECTS Agreed &AeFeptedsTRUCTION KDTNFR Name:- M/S MRUNAL cONSTRUCTION Date :