Archipel Architects archipel architects Architects, Planners, Interior Designers Add.: 04, Bhagya Nagar, Adalat Road, Aurangabad. Phone: 0240-6531891, Cell:98 23 231891 Ar.Kapil Gujarathi Date: 15/07/2023 To, MRUNALCONSTRUCTION, Plot No. 1, Survey No.179/6, Harsiddhi Housing Society, Jalgaon Road, Harsul, Aurangabad. Subject: Certificate of Percentage of completion of Construction Work of Project 21- Leaves MRUNAL having Maha-RERA Registration Number P51500048155, being developed by M/S CONSTRUCTION. Sir, I/ VWe ARCHIPEL ARCHITECTS have undertaken assignment of certifying Percentage of completion ofConstruction Workof Project 21-Leaves [to be registered under MAHA RERAI being developed by WS MRUNAL CONSTRUCTION. Based on Site Inspection , with respect to each of the Building/Wing ofthe aforesaid Real Estate Project, I certify that as on the date ofthis certificate, the Percentage ofWork done for each of the building/wing of the Real Estate Project as registered vide number [to be registered under MAHA RERA] is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the 21-Leaves and Overall Percentage ofworkdone with respect to each Building is detailed in the Table B. Table - A (To be prepared separately for each Building {Wing of the project) Building (JULYTO SEPT 2022), SR.NO. TASKS 1 ACTIVITY % OF WORKDONE Excavation 100% 01 02 1 Number of Plinth 100% ONumber of Basement Floor 0% 03 04 1 Number of Stilt Floor 100% 05 8 Number of Slabs of Super Structure 100% Internalwalls, Internal Plaster, Flooring within 70% 06 Flats/Premises, Doors and Windows to each of the Flat Premises Sanitary Fittings within the Flat/Premises, Electrical 5% 07 Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor 85% 08 level connecting Staircases and Lifts, Overhead and Underground Water Tanks 09 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing ofthe Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOc, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance 10 tocond itions ofenvironment/CRZ NOC, Finishing to entrance lobby's, plinth protection, paving ofareas appurtenantto Building/Wing, Compound Walland all other requirements as may be required to Obtain Occupation [Completion Certificate Table -B (Intemal &Extemal Development Works in Respect of the entire Registered Phase) PROPOSED DETAILS SR.NO. TASKS 1 ACTIVITY (YES/NO) WORKDONE 01 Intemal Roads & Footpaths No 0% As per drawings by Consultants 02 Yes 0% As per drawings by Water Supply Consultants 03 Sewerage (chamber, lines, 0% As per drawings by septic Tank, STP Yes Consultants 04 As per drawings Storm Water Drains No 0% by Consultants 05 Landscaping &Tree As per drawings by No 0% Consultants Planting 06 Aggregate Area of As per drawings by No 0% Consultants Recreational open Space 07 Street Lighting As per drawings by No 0% Consultants 08 Community Buildings No 0% Not Applicable 09 Treatment and As per drawings by disposal of sewage No 0% Consultants and sullage water Solid Waste anagement & As per drawings by 10 No 0% Disposal Consultants Water conservation, 0% As per drawings by 11 Yes Rain water harvesting Consultants 12 Asper drawings by No 0% Energy management Consultants Fire protection and fire As per drawings by 13 safety requirements No 0% Consultants Electrical meter room As per drawings by 14 Substation, receiving Yes 0% Consultants station 15 Others. Compound wall As per drawings by & Entrance Gate Yes 0% Consultants Overall project completion is 75.00% for building & 17.0% for intemal &external development works. ARCIU Yours Faithfully, For ARCHIPELARCHITECTS Agreed &AggRRISAbCONSTRUCTION PARTNER Name :- M/S MRUNAL CONSTRUCTION Date :- I5|o7}4028