Archipel Architects archipel architects Architects, Planners, Interior Designers Add.: 04, Bhagya Nagar, Adalat Road, Aurangabad. Phono : 0240-6531891, Cell :98 23 231891 Ar.Kapil Gujarathi Date: 15/04/2023 To, MRUNALCONSTRUCTION, Plot No. 1, Survey No.179/6, Harsiddhi Housing Society, Jalgaon Road, Harsul, Aurangabad. Subject: Certificate of Percentage of completion of Construction Work of Project 21- Leave sharing MahaRERA Registration Number P51500048155, being developed by M/S MRUNAL CONSTRUCTION. Sir, / We ARCHIPEL ARCHITECTS have undertaken assignment of certifying Percentage of completion ofConstruction Workof Project 21-Leaves [to be registered under MAHA RERAI being developed by WS MRUNAL CONSTRUCTION. Based on Site Inspection , with respect to each of the Building/Wing ofthe aforesaid Real Estate Project, Icertify that as on the date ofthis certificate, the Percentage ofWork done for each of the building/wing of the Real Estate Project as registered vide number [to be registered under MAHA RERAJis, as per table Aherein below. The percentage of the work executed with respect to each of the major activity of the 21-Leaves and Overall Percentage ofworkdone with respect to each Building is detailed in the Table B. Table - A (To be prepared separately for each Building {Wing of the project) Building (JULY TO SEPT 2022) SR.NO. TASKS1 ACTIVITY % OF WORKDONE 01 Excavation 100% 02 1 Number of Plinth 100% 03 ONumber of Basement Floor 0% 04 1Number of Stilt Floor 100% 05 100% 6 Number of Slabs of Super Structure Internalwalls, Internal Plaster, Flooring within 50% 06 Flats/Premises, Doors and Windows to each of the Flat Premises 07 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor 75% 08 level connecting Staircases and Lifts, Overhead and Underground Water Tanks 09 The ekfrnal plumbing and external plater, elevation, 0% complefion of terracds with waterpfoofing o the GA Building Wing, Installationoflifts, waterpumps, Fire Fighting 0% Fittingsand Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 condition sofenvironment/CRZ NOC, Finishing to entrance lobby's, plinth protection, paving of areasappurtenantto Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation [Completion Certificate Table - B (Internal &External Development Works in Respect of the entire Registered Phase) PROPOSED DETAILS SR.NO. TASKS 1 ACTIVITY (YES/NO) WORKDONE 01 Internal Roads & Footpaths No 0% As per drawings by Consultants 02 Yes 0% Asper drawings by Water Supply Consultants 03 Sewerage (chamber, lines, 0% As per drawings by septicTank, STP Yes Consultants 04 As per drawings Storm Water Drains No 0% by Consultants 05 Landscaping &Tree As per drawings by No 0% Consultants Planting 06 Aggregate Area of As per drawings by No 0% Consultants Recreational open Space 07 Street Lighting As per drawings by No 0% Consultants No 0% Not Applicable 08 Community Buildings 09 Treatment and As per drawings by disposal of sewage No 0% Consultants and sullage water Solid Waste management As per drawings by 10 & Disposal No 0% Consultants Water conservation, As per drawings by 11 Yes 0% Consultants Rain water hafvestihg GA 12 As per drawings by No 0% Energy management Consultants Fire protection and fire As per drawings by 13 safety requirements No 0% Consultants Electrical meter room. As per drawings by 14 Substation, receiving Yes 0% Consultants station 15 Others. Compound wall As per drawings by & Entrance Gate Yes 0% Consultants Overall project completion is 55.00% for building &15.0% for internal & external development works. Yours Faithfully, For ARÇHIPELÁRCHITECTS CAD42094 AD:LT ROAD AgrRSAEERptedbTION URANGABE PARTNER Name :- M/S MRUNAL CONSTRUCTION Date :- 15/04/2023