Plot No.21, Varad Complex Ce 20cK No.02, (M5) Inoa Behind Rathi Tower, Bijinagar, Aurangabad. 431005 E Mal:gridsconsuitant@gimal.com 37057 okd 31290, 7 9 0 Annexure - B FORM - See Regulation 31 2 GRIDS CONSULTANT ENGINEER'S CERTIFICATE e at the time of Orng Project arnd tr hdrawa s Oitted of Registration o1 Money from Designated Barnik Account) w Date 07/1O/2022 Uttam Bhaurao Patil, Ashish Uttamrao Patil And Priti Sudhir Maknikar, Aurangabad. Subject ertiticale of Cost Incurred for Development of Surekha Residency, Plo No.12, 13, Gut No.47, ltkheda, Aurangabad having MahakERA Registration Number P51500045627 (Only applicable ater Project Registration) being Developed by 1Utam Bhaurao Patil, Ashish Uttamrao Patil And Priti Sudhir Maknikar, Sir, 1. 1/We Prasad Aphale have undertaken assignment of Certifying Estimated Cost tor Surekha Residency, Plot No.12, 13, Gut No.47, Itkheda, Aurangabad having MahaRERA Registration Number P51500045627 (Only applicabie ater Project Registration) being Developed by [Uftam Bhaurao Patil, Ashish Uttamrao Patil And Priti Sudhir Maknikar). 2. We have estimated the cost of Civi, MEP and Al ed Works required for completion of the apartments & proportionate complefion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are Dasea on tne DrawingSFidns made availiabe to us Tor the Project under Relerence by the Developers consuitanis. Tne Sthedule of ltems & Quantity equired for the entire work as caliculated Dy Architect& Promoter Quantity Surveyor appointed by the DeveloperíEngineer, the assumption of the cost of materia, labour & other inputS made by tne Developer, and the Site Inspection carried out by us fo ascertain Conirm the above analysis given to us 3 We estimate Total Estimated cost or Compieion O tne aloresaid Project mentioned under reference at Rs. 5,99,30,542/ (lotal of 1able A & 8) at the lime of Registration. The estimated Total Cost of Proect is with relerence to the Civil, MEP& Allied Works completion of the apartments & proportionate completion of internal & external workS, 8S per the specinIcalons meniohed in the Agreement of Sale & for the purpose of obtaining Occupalion Certicate Ccmpletion Certficate for the Building(s)/ Wingfs)/ Layout Ploted Develapment from the AMC being the Planning Authorily under wiose jurisdicion ne aroresaid Project is being implemented 4. The Estimated Cost incurred til date is calculates to Rs. 2,06,25,946- (Total of Table A & B). The Amount of Esimaieg.st.Incurred.S.calculated.on. the. basis.of.input matenals.Services.used.o.unit.cost 01.mese.tems PRASAD APHALE B.E. (Cv), M.E. (Struct.) Regd. Ho: DDMC8IRI2021/APLIO1035 Get Reinlorced itegrated Design Sotudions Office:Block No,02, Plot No: 21. Varad Complex Behind Rathi Tower, Bljlinagar, Aurangabad. 431005 (M.S) lnda Cost of completion of the CivilMER & itant@gmail.com Apartments& proportionate AHed? Morksifor nch specitications mentioned completion of internal & exterma in w 4,93,04,596/- (Total ofAgreement at Rs. of Sale, of the aforesaid Proje Table A & 6. Certify that the cost of Civil, B) CONSULTANT MEP & Allied Work for nrernal& external works, apartments & the atOresaid Project as per the specifications mentioned in Agreemen or od as Table A &B below: completed on the date of this certificate is as given TABLE - A Building/ Wing / Layout Plotted Development bearing or called (to be preparcd Numoer. - Layout / Plotted separately of cach Building/ Wing Development of the Real Estate Project) No. Particulars Amount (in Rs.) Total Estimated Cost of PIoted Development as Building/Wing 6,99,30,5421- / Layout on date of Registration S Costincurred as on date ofCertificate Work Done in Percentage (as Percentage or 2,06,25,946/ Estimated Cost) Balance Cost to be incurred * (based on 1,49% Estimated Cost) 4,93,04,596/ Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) TABLEB Internal & External Development Works in respect of Registered Phase S. Particulars No. Amount (in Rs.) Total Estimated Cost of Internal & External Development Works including amenities & facilitiess 6,99,30,542 in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate Work Done in Percentage (as Percentage of 2,06,25,946/- 9.49%6 | Estimated Cost) Balance Cost to be incurred ((based on Estimated Cost) 4,93,04,596/ Cost incurred on Additional i Extra ltems not included in the Estimated Cost (Table-C) Agreed & Accepted by PRASADAPHALE B.E. (Cvil), M.E. (Struct.) Regd. Ne.: DDMPRKSADAPHALE Signatureo f Promoter (Structural Engineer) Name: Uttam Bhaurao Patil (Gpa Holder) Date:07/10/2022 Get Renforced Integrated Design solutons