Mnxsenl tkster.t r!ale,o{ n!rafi rr*,i: r{, & $}r(llil1f ri Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Daleil4-01-2024 To, VINAYAK ENTERPRISES, PLOT NO C/8 B/P,BEHIND MARU MOTERS, SATARA PARISAR, BEED BYPASS, AURANGABAD Subject: Certificate of Percentage of Complelion of Construction Work of VINAYAX BUSINESS CENTRE having MahaRERA Regislration Number P51500047881 being developed by VINAYAX ENTERPRISES (For Jan to Mar 2024 QTR) Sir, I / We MANGAL DESIGN ARCHITECTS AND INTERIOR 0ESIGNER have underlaken assignment as Architect / Licensed Surveyor of Certifying Percenlage of Complelion of Construclion Work of VINAYAK BUSINESS CENTRE having MahaREM Registration Number !!!!QQQ[!!! being developed by VINAYAK ENTERPRISES Based on the Site lnspection, with respect to lhe Layout / each BuildingflVing of the aforesaid Real Estate Project, I certify that as on date of lhis Certificate, lhe Percentage of Work Done for each of the BuildingAVing of the Real Estate Project under MahaRERA is as per Table-A& B herein below The percentage of work executed with respecl lo each of the activity of entire Phase is detailed in Table-B. TABLE-A VINAYAX BUSINESS CET{TRE S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Cortificate) (1) (21 (3) 1 Excavation 100Vo 2. Basemenls (if anv) 3. Podiums (if anv) 4. Plinth 100% 6 Stilt Floor 100% 6. Slab of Super Struclure 100% 7. lnternal Walls, lnlernal Plaster, Floorings, Doors, windows 7lYo within Flats / Premises MnNeoRl Elrsrru L Sanitarv Fittinos within Flats / Premises 60% 9. Slaircases, Lifl Wells & Lobbies al each Floor Level 0verhead 700/o and Underground Water Tanks 10. External Plumbing & External Plasler, Elevation, Completion of 60% Terraces, with waterproofinq of the Buildino / Winq 11 lnstallation of Lifl s, Water Pumps, Eire+igh{in$#tingrrand 60% Equiprnentsas-per€F0-+l€C, Electrical Fittings, Meehanical Fnuipments, Complianee to eondilions of Environmenl / eM NOQ Finishing to Enlrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildinglWing, Compound Wall and all olher requirements as may be required lo complete Project as per specifications to Aoreement of Sale, Anv olher Activitv TABLE.B Common Areas (lnternal & Exlernal Development Works) for S. No. Common Areas & Facilities Proposed Percentage of aclual Details (Yes / N0) Work Done (As on date of Certificale) (r) (21 (3) (4) (5) 1 lnternal Roads & Footpaths NO Ii.A. 2. Water Supply YES 5070 As Der availabilitv 3. Sewerage (Chamber, Lines, Septic YES 50o/o Drainage Line till Tank, STP) MIDC Line 4. Slrom Water Drains NO N.A. 5. Landscapino & Tree Planlino NO N,A, 6, Street Liohtino NO N,A. 7. Community Buildinos NO N.A. 8. Trealment & Disposal of Sewage and NO N.A, Sullaoe Waler o Solid Waste Manaoemenl & Disoosal NO N.A. 10. Waler Conservalion / Rain Water YES 00% Rain Water Harvesting Harvesting As per Norms 11 Energy Management NO N.A. 12. Fire Protection & Fire Safety NO t.o. requirements 13. Electrical Meter Room, Sub-Stalion, NO N.A. Receivinq Stalion 14. Aqqreqate area of recrealional Ooen NO N,A. Mnxoenr ErsrsN ,leral'**ia , t*?E tara tr'crl:rr! Space 15. Others (Option to Add more) Yours faithfully, For MANGAL DESIGN ARCHITECTS AND tNTERtOR DEStcNER I /*tq^ t,.- Signalure & Name of Land Surveyor / frf6hiteci 'M License Number Vilhobo Nolole ARTNERS Name: VINAYAK ENTERPRISES Dale:14-01-2024