PLEASE USE THIS Annexure A FORM 1 (See Regulation 3] MANGGAL DESIGN ARCHITECT'S CERTIFICATE ARCHITECTS&INTERIOR DESIGNEA (To be submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: 04-04-2023 To, VINAYAK ENTERPRISES, PLOT NO CI8 B/P, BEHIND MARU MOTERS, SATARA PARISAR, BEED BYPASS, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of VINAYAK BUSINESS CENTREhaving MahaRERA Registration Number P51500047881 being developed by VINAYAK ENTERPRISES Sir, II We M/s. Mangal Design Architects and Interior Designer have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of VINAYAK BUSINESS CENTREhaving MahaRERA Registration Number P51500047881 being developed by VINAYAK ENTERPRISES Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, Icertfy that as on date of this Certificate, the Percentage of Work Done for each of the BuildingVWing of the Real Estate Project under MahaRERA is as per Table-A &Bherein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A VINAYAK BUSINESS CENTRE S. Tasks I Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100% 5 Stilt Floor 00% 6 Slab of Super Structure 00% 7 Internal Walls, Internal Plaster, Floorings, Doors, 00% windows within Flats / Premises 8 Sanitary Fittings within Flats / Premises 1 MANGGAL ARCHIECenaINTERIOA OESIGNER Ar.Pramod Vithoba Narale nale.pramodz0gmal.com 0ARCHO CAOI/S424 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water-Pumps, Fire Fighting Fitings and Equipments-as per GFO-NOC, Electrical Fitings, Mechanical Equipments, Gempliance to-conditions-of Environment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal &External Development Works) for Project VINAYAK BUSINESS CENTRE S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actualWork Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads &Footpaths NO N.A. 2. Water Supply YES 00% As per availability 3 Sewerage (Chamber, Lines, YES 0% Drainage Line till Septic Tank, STP) MIDC Line 4. Strom Water Drains NO N.A. 5 Landscaping &Tree Planting NO NA. 6. Street Lighting NO N.A. 7. Community Buildings NO NA. 8 Treatment &Disposal of Sewage NO N.A. and Sullage Water 9 Solid Waste Management & NO N.A. Disposal 10. Water Conservation / Rain Water YES 00% Rain Water Harvesting Harvesting As per Norms 11. Energy Management NO N.A. 12. Fire Protection & Fire Safety NO N.A. requirements 13. Electrical Meter Room, Sub NO N.A. Station, Receiving Station 14. Aggregate area of recreational NO N.A. Open Space 2 MANGGRL Ar.Pramod Vithoba Narale naale.pramodomal.com 15. Others (Option to Add more) Yours faithfully, For Mangal Design Architects and Interior Designer Signature & Name of Land Surveyor / Architect License Number 2AMANGGAL ARCHITEC TS & INTEAIOR DESIGNER Ar.Pramod Vithoba Narale narale.pramod28@gmal.com OARCH) CA/2011/53824 Signature of Promoter Name: VINAYAK ENTERPRISES Date: 04-04-2023 3