I Archipel Architects Architects, Plonners, lnterior Designers Add.: 04, Bhagya Nagar, Adalal Road, Aurangabad. Pho.6 0240-6531891, Cell:9a 23 231891 Ar.Kopil Guiorothi Anuexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale:08-07-2023 To, RAJYOG DEVELOPERS, OFFICE NO-E, THIRD FLOOR, SAAM SQUARE, NIRALA BAZAR,, CHHATRAPATI SAMBHAJI NAGAR (AURANGABAD) Subject: Certificate of Percentage of Completion of Construction Work of SAIRAAJ HEIGHTS having MahaRERA Registration Number S!!1Q@[p9!] beins developed by Sir, I / We ARCHIPEL Architect / Licensed $urveyor of Certifying Percentage of of $!BAi&l!!!Q[$ havins MahaRERA Registration byBI]I9G lEllEleEEN Based on the Site of the aforesaid Real Estate Project, I of Work Done for each of the Build is as per Table-A& B herein below. The of the activity of entire Phase is detailed in T TABLE-A SAIRAAJ HEIGHTS - A.WPE BUILDING s. Tasks / Activity Percentage of Actual Work No. Done I (As on date of the Certificate) (1) (21 (3) 1. Excavation 100% 2. Basements (if anv) Podiums (if any) 4. Plinth 1O1Yo Stilt Floor 100% o. Slab of Super Structure 30% 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 31o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 30% o Staircases, Lift Wells & Lobbies at each Floor Level 30% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 30o/o Completion of Terraces, with waterprooflng of the Buildino / Winq 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Buildingruing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity T/TBLE.A SAIRAAJ HEIGHTS - B.TYPE BUILDING s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 1000/" 2. Basements (if any) J. Podiums (if anv) 4. Plinth 100% 5. Stilt Floor 100% 6. Slab of Super Structure 300k 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 30o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 30% 9. Staircases, Lift Wells & Lobbies at each Floor Level 30% Overhead and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, 30% Completion of Terraces, with waterproofing of the i Buildino / Winq 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingllVing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other ActivitV TABLE.B Common Areas (lnternal & External Development Works) in respect of SAIRAAJ HEIGHTS - A & B -TYPE BUILDING S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (21 (3) (4) (5) 1. lnternal Roads & Footpaths NO N.A. 2. Water Supolv YES 00% From Borewell 3. Sewerage (Chamber, Lines, YES 000k Drainage Line till Septic Tank, STP) Corporation Line 4. Strom Water Drains NO N.A. q Landscaping & Tree Planting YES 000h lnternal Project Tree Plantation b. Street Liqhtinq NO N.A. 7. Communitv Buildinos NO N.A. 8. Treatment & Disposal of Sewage NO N.A. and Sullaqe Water 9. Solid Waste Management & NO N.A. Disposal 10. Water Conservation / Rain Water YES 00% Rain Water Harvesting Harvesting As per Norms 11 Enerqy Manaqement NO N.A. 12. Fire Protection & Fire Safety NO N.A. requirements 13. Electrical Meter Room, Sub- NO N.A. Station. Receivinq Station 14. Aggregate area of recreational NO N.A. Open Space 15. Others (Option to Add more) ARCHITECTS & Name of Land License Agreed & Accepted by: \ Signature of Profrjter Name: RAJYOG DEVELOPERS Date: 08-07-2023