Ar. Doifode Dhananjay OUARE (B.ARCH.), (M.ARCH) "ARCHITECTS " INTERIOR DESIGNERS PROJECT CONSULTANTS DEVA's GROUP DARCHITECT'S, "GANRAJ" Plot nD &4, Galanan colony, Garkheda,AUranqabad, 431009 PHONE NO, -+91-9373294230, 9B22294230, 8a75326O61, 976745599S DATE FORM 1 [see Regulation 31 ARCHITECT'SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 13.08.2025 To The M/s Samarth Pride, Gut no. 38, Jalgaon Road, Sawangi, Chh. Sambhajinagar, Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number] situated on the Plot bearing Sawangi Gut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road the North, Land of gut no. 38 (P) to the South, Land of gut no. 36 to the East, Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010admeasuring Land Area = 2850.00 sq.mts. &Proposed Built-up Area= 2091.74sq.mt. area being developed by M/s Samarth Pride. Sir, I Dhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being of the Building/ Phase of the Project, situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850,00 sq,mts, &Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Owner / Promoter - (1) Shri. Dhananjay B. Doifode. as L.S. / Architect; () Shri. Abhay Patil. as Structural Consultant. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number PS1500045981 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Wing and Overall Percentage of work done with respect to each Building/Wing is detailed in the Table B. TABLE-A A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks/ Activity Percentage of Actual Work No (2) Done (1) (As on date of this Certificate) (3) 1. Excavation 100 % 2 Basement's (if any) N.A. 3. Podiums (if any) N.A. 4. Plinth 100 % 5 01 Stilt Floor N.A. 6. 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 100 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 70 % Staircases. lifts' Wells and Lobbies at each Floor level 100 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 70 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings N.A. and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anyother activities. B-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks/ Activity No Done (2) (Ason date of this (1) Certificate) (3) 1. Excavation 100 % 2. Basement's (if any) N.A. 3. Podiums (if any) N.A. 4. Plinth 100 % 5. 01 Stilt Floor N.A. 6. 02 Slabs of Super Structure 100 % 7. Internal walls, Internal Plaster, Floorings, I) doors and 100 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 70% Staircases. lifts' Wells and Lobbies at each Floor level 100 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 70 % completion of terraces withwaterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings N.A. and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. separately for each Layout C-Type Building (SAMARTH PRIDE) (To be prepared building/Wing of The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100 % 2. Basement's (if any) N.A. 3. Podiums (if any) N.A. 4. Plinth 100 % 5. 01 Stilt Floor N.A. 6. 02 Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings, 1) doors and 100% windows within Flats/Premises Sanitary Fittings within the Flat/Premises 70% 9 Staircases. lifts' Wells and Lobbies at each Floor level 100 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 70% completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings N.A. and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout D-Type Building (SAMARTH PRIDE) (To be prepared separately for each building/Wing of The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As ondate of this (1) Certificate) (3) Excavation 100 % 1. Basement's (if any) N.A. 2. N.A. 3. Podiums (if any) 100% 4. Plinth 01 Stilt Floor N.A. 5. 02 Slabs of Super Structure 100 % 6. Internal walls, Internal Plaster, Floorings, I) doors and 100 % 7. windows within Flats/Premises Sanitary Fittings within the Flat/Premises 70% Staircases. lifts' Wells and Lobbies at each Floor level 100 % 9 Overhead and Underground Water Tanks 70 % 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. N.A. 11 Installation of Lifts. water pumps, Fire Fitting Fittings fittings, and Equipment as per CFO NOC, Electrical mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project Any other as per specifications in agreement of Sale. activities. TABLE-B Works) in respect of the Registered Common Areas (Internal and External Development Phase/Project Number Details Common areas and facilities Proposed Percentage Sr of Actual (Yes/No) No Work (5) (3) (1) (2) Done (As on date of the Certificate) (4) 1 Internal Roads &Footpaths N.A. N.A. N.A. 00% BOREWELL 2. Water Supply yes Sewerage (Chamber, lines, Septic Tank, Septik 00 % Yes 3. STP). Tank 4 Storm Water Drains N.A. N.A. N.A. Landscaping & Tree Planting YES 00 % GARDEN 5 6 Street Lighting YES 00 % Along Road Community Buildings N.A. N.A. N.A. 7 8 Treatment and disposal of sewage and N.A. N.A. N.A. sullage water. Solid Waste management &Disposal N.A. N.A. N.A. 10 Water conservation/ Rain water Upto 00 % Yes harvesting Borewell 11 Energy management. N.A. N.A. N.A. 12 fire protection and lire Safety N.A. N.A. N.A. requirements 13 Electrical meter room, sub-station, METER 00 % N.A. receiving station. 14 Others (Option to Add more) N.A. N.A. N.A. Doifode Mr. DMananjay B. (B.Arch, M.Arch) CA/2013/60839 Gajanan Colony, Aurangabad "Ganraj" P.No.3 &4, Your's Faithfully, Signature &Name (N BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Name: M/s Samarth Pride. Date: 13.08.2025