Ar. Doifode Dhananjay SQUARE BARCH), MARCH " ARCHITECTS " INTERIOR DESIGNERS PROJECT CONSULTANTS DEVA'sGROUP DARCHITECT'S, "GANRAJ" Plot no 3& 4, Gajanan colony, Garkheda,Aurangabad. 431O09 PHONE NO. - +91 -9373294230, 9822294230, B275325061 9767455995 FORM 1 DATE: [see Regulation 3 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 12.04.2025 To The M/s Samarth Pride, Gut no.-38, Jalgaon Road, Sawangi,Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number] situated on the Plot bearing Sawangi Gut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North,Land of gut no. 38 (P)to the South, Land of gut no. 36 to the East , Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. &Prop0sed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. Sir, I Dhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being of the Building / Phase of the Project, situated on the plot bearing Sawangi Gut no. 38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sg.mts.&Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1 Following technical professionals are appointed by Owner/ Promoter: (1) Shri. Dhananjay B. Doifode. as L.S. / Architect; (i) Shri. Abhay Patil. as Structural Consultant. aforesaid Based on Site Inspection, with respect to each of the Building/Wing of the Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51500045981 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Wing and Overall Percentage of work done with respect to each Building/Wing is detailed in the Table B. TABLE-A A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks/ Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) (3) 1. Excavation 100 % 2. Basement's (if any) N.A. 3. Podiums (if any) N.A. 4. Plinth 100 % 5. 01 Stilt Floor N.A. 6. 02 Slabs of Super Structure 100 % 7. Internal walls, Internal Plaster, Floorings, I) doors and 100 % windows within Flats/ Premises SanitaryFittings within the Flat/Premises 60 % Staircases. lifts' Wells and Lobbies at each Floor level 100 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 60 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings N.A. and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. separately for each Layout B-Type Building (SAMARTH PRIDE) (To be prepared building/Wing of The Project) Percentage of ActualWork Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) 100% 1 Excavation N.A. 2. Basement's (if any) N.A. 3 Podiums (if any) Plinth 100% 4 01 Stilt Floor N.A. 5 02 Slabs of Super Structure 100% 6 100% 7. Internal walls, Internal Plaster, Floorings, I) doors and windows within Flats/Premises 60% Sanitary Fittings within the Flat/Premises Floor level 100 % 9 Staircases. lifts' Wells and Lobbies at each Overhead and Underground Water Tanks elevation, 60 % 10 External plumbing and external plaster, completion of terraces with waterproofing of the Building/wing. Fitting Fittings N.A. 11 Installation of Lifts. water pumps, Fire NOC, Electrical fittings, and Equipment as per CFO conditions of mechanical equipment, compliance to environment/CRZ NOC. Finishing to entrance lobby/s. areas appurtenant to plinth protection, paving of all other Building/Wing. Compound Wall and complete project requirements as may be required to agreement of Sale. Any other as per specifications in activities. C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) 1. Excavation 100 % 2. Basement's (if any) N.A. 3. Podiums (if any) N.A. 4. Plinth 100 % 5. 01 Stilt Floor N.A. 6. 02 Slabs of Super Structure 100 % 7. Internal walls, Internal Plaster, Floorings, ) doors and 100 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 60 % Staircases. lifts' Wells and Lobbies at each Floor level 100 % Overheadand Underground Water Tanks 10 External plumbing and external plaster, elevation, 60 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings N.A. and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. D-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks / Activity Percentage of Actual Work Done No (2) (1) (As on date of this Certificate) (3) 1. Excavation 100 % 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100 % 5. 01 Stilt Floor N.A. 6. 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 100 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 60 % Staircases. lifts' Wells and Lobbies at each Floor level 100% Overheadand Underground Water Tanks 10 External plumbing and external plaster, elevation, 60% completionof terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings N.A. and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr Commonareas and facilities Proposed Percentage Details No (Yes/No) of Actual (2) (3) Work (5) (1) Done (As on date of the Certificate) (4) 1. Internal Roads & Footpaths N.A. N.A. N.A. 2. Water Supply yes 00 % BOREWELL 3 Sewerage (Chamber, lines, Septic Tank, Septik 00 % yes STP). Tank 4 Storm Water Drains N.A. N.A. N.A. 5 Landscaping & Tree Planting YES 00 % GARDEN 6 Street Lighting YES 00 % Along Road 7 Community Buildings N.A. N.A. N.A. Treatment and disposal of sewage and N.A. N.A. N.A. sullage water. Solid Waste management & Disposal N.A. N.A. N.A. 10 Water conservation / Rain water harvesting Upto 00 % 00 % Borewell 11 Energy management. N.A. N.A. N.A. 12 fire protection and lire Safety requirements N.A. N.A. N.A. 13 Electrical meter room, sub-station, METER 00 % N.A. receiving station. 14 Others (Option to Add more) N.A. N.A. N.A. Doifod. Mr. Dhananjay B. (B.Arch, M.Arch) CA/2013/609 G3raj P.No.3 &4, 6,ul: Colony u: Your's Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Name: M/s Samarth Pride. Date:12.04.2025