FORM-2 ENGINEER'S CERTIFICATE Date:08.01.2025 To, M/S Samarth Pride , Gut No:38, Jalgaon Road, Ssawangi , Aurangabad. Subject: Certificate of Cost Incurred for Development or Construction of SAMARTH PRIDE" Building situated on Gut No :38 ( Part), Sawangi, Tal &Dist :Aurangabad , demarcated by its boundaries To the east -Gut No :36 To the West: Gut No :30.To The South: Gut No:38 (Part) &, To The North: 9.00 m wide approach road and Gut No :38 ( Part),admeasuring Land area =2850 .0 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- P51500045981 Sir 1, Er. Abhay Subrao Patil have undertaken assignment of certi fying Estimated Cost or the Subject Real Estate Project proposed to be registered under RERA, being of Building "SAMRTH PRIDE " situated on Gut No : 38 (Part) , Sawangi ,Tal &Dist :Aiurangabad ,demarcated by is boundaries To the east - Gut No :36 ,To the West: Gut No: 30,To The South: Gut No : 38 (Part) &, To The North:9.00 mwide approach road and Gut No 38( Part), admeasuring Land area =2850.00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Developer: i) Shri Dhananjay B.Doifode as L.S./ Architect; i) Shri Abhay Subrao Patil as Structural Consultant i) Shri Abhay Subrao Patil as Quantity Surveyor. 2. We have estimated the costof the completion to obtain Occupation Certificate of the Civil.MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation cerificate for the building from ABHAP CIDCO , Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being PATE Res. No. (M-1475244)+ implemented. MJS) artere Engi 4. The Estimated Cost Incurred till date is calculated at Rs. 3,88,29,098 |- The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtainOccupation Certificate from CIDCo,Aurangabad is estimated at Rs. 96,99,070 / 6 Icertify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TABLE-A Sr.No. Particulars Amounts Total Estimated cost of the building as gn date of Registration is Rs 3,63,91,598 / Cost Incurred as on date of certificate Rs 2,91,35,113 / 3 Work done in Percentage 80,06 % 4 Balance Cost to be lncurred Rs 72,56,487 / Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts 1. Total Estimated cost of the internal and external development works including Rs 1,21,08,400 / amities and facilities in the layout as on date of Registration is 2. Cost Incurred as on date of certificate Rs 96,93,985 / 3 Work done in Percentage 80.06 % 4 Balance Cost to be Incurred Rs 24,14,415 / 5 Cost Incurredon Additional /Extra ltems as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) BHAY Yours Faith fully Abhay Subrao Patil PATE Res. No. M-1475244) (MIE) artereo Eng) Agreed & Accepted by: Signature of Promoter Name: Date: 08-01-2025 Note: time 1. The scopeof' workis to complete Registered Real Estate Project as per drawings approved from Agreement to Sale. to time as per specilications mentioned in the independent office of Engincer or can be done by an 2. (*) Quantity Survey can be done by theQuantity Calculated, can be relied up on by Engineer. In Quantity Surveyor, who's Certificate of appointed by Developer, the name has to be mentioned case of independent quantity surveyor being calculated by office of Engineer, the name of marked() & in case quantity are being at the place mentioned for the quantity calculated should be person in the office of Engincer, who is responsible at the place marked (). & from difference between Total Estimated Cost (1) 3. (**) Balance Cost to be incurred (4) may vary required / escalation of cost etc. As this is an actual Cost incurred (2)due to deviation in quantity Development of Real Estate Project will the Estimated Cost any deviation quantity required forincurred. result in an amendment of the cost incurred / to be & not exhaustive 4. Allcomponents of work with specifications are indicative qualifications. Example: Any deviation in input material 5. Please specify if there are any deviations / used from specifications in Agreement of Sale. ANNEXURE - A considered in the Cost List of Extra /Additional / Deleted Itemns Total Cost) (Which were not parts of the original Estimate of S. No. List of Extra/ Additional/Deleted Items Amount (in Rs.) 1. 2. ABHAY Res. No. Chart (M-(MIE) 1475244) tered Srgine