FORM-2 ENGINEER'S CERTIFICATE Date:09.10.2024 To, M/S Samarth Pride, Gut No: 38, Jalgaon Road, Ssawangi , Aurangabad. SAMARTH PRIDE" Subject: Certificate of Cost Incurred for Development for Construction of " boundaries To Building situatedon Gut No :38 (Part),Sawangi, Tal & Dist:Aurangabad ,demarcated by its ToThe North :9,00 m the east - Gut No: 36 ,To the West :Gut No: 30,To The South:Gut No:38 (Part) &, built up wide approach road and Gut No : 38 ( Part) , admeasuring Land area = 2850 .00 Sq.Mt and Proposed area : 2091.74Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- P51500045981 Sir Estate 1, Er. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the Subject Real :38 Project proposed to be registered under RERA, being of Building " SAMRTH PRIDE" situated on Gut No (Part), Sawangi,Tal &Dist: Aiurangabad ,demarcated by its boundaries To the east -Gut No :36 ,To the West:Gut No :30,To The South: Gut No:38 (Part) &, To The North:9.00mwide approach road and Gut No: 38 (Part) , admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1.Following technical professionals are appointed by Developer: i) Shri Dhananjay B.Doifode as L.S./ Architect; ii) Shri Abhay Subrao Patil as Structural Consultant ii) Shri Abhay Subrao Patil as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate of the Civil,MEP and Allied works, of the Building ofthe project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168/- The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building from BHAY CIDCO ,Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being PATI Res. No. (M-1475244 arterc Engine implemented. amount of Estimated Cost Incurred till date is calculated at Rs. 3.21.74.898 /- The 4 The Estimated Cost Total Estimated Cost. Incurred is calculated on the baseof amount of project to Completion of the Civil, MEP and Allied works of the Build1ng of the subject 5 The Balance cost of Aurangabad is estimated at Rs. 1,63,53,270 / obtain Occupation Certificate from CIDCO, Civil, MEP and allied work for the aforesaid Project as completed on the date of 6 Icertify that the Cost of the below this certificate is as given in Table A and B TABLE-A Amounts Particulars Sr.No. Rs 3,63,91,598 / 1. Total Estimated cost of the building as on date of Registration is Rs 2,41,42, 186 / 2. Cost Incurred as on date of certificate 66.34 % 3. Work done in Percentage Rs 1,22,49,412 / 4 Balance Cost to be Incurred certificate not included Rs Nil. 5 Cost Incurred on Additional /ExtraItems as on date of in the Estimated Cost (Annexure-A) TABLE-B Amounts Particulars Sr.No. including Rs 1,21,08,400 / Total Estimated cost of the internal and external development works amities and facilities in the layout as on date of Registration is Cost Incurred as on date of certificate Rs 80,32,712 / 66.34 % 3 Work done in Percentage 4 Balance Cost to be Incurred Rs 40,75,688 / Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Nil. 5 in the Estimated Cost (Annexure-A) BHAY Yours Faith fully Abhay Subrao Patil PATI Res. No. M-1475244 (MIE) Eng Agreed & Accepted by: tered Signature of Promoter Name: Date: 09-10-2024 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time totime as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who'sCertificate of QuantityCalculated, can be relied up on by Engineer. In case of independentquantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) &in case quantity are being calculated by office of Engineer, the name of person inthe office of Engineer, whois responsible for the quantity calculated should be mentioned atthe place marked (*). 3. (**) Balance Cast to be incurred (4) may vary from difference between TotalEstimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. Allcomponents of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. ANNEXURE - A List of Extra / Additional/Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra/ Additional/ Deleted Items Amount (in Rs.) 1. 2. ABHA Res. No. *{M-147524)Engi(MIE) nes * red Eg PATIL