FORM-2 ENGINEER'S CERTIFICATE Date:03.07.2024 To, MIS Samarth Pride, Gut No : 38, Jalgaon Road, Ssawangi , Aurangabad. Subject: Certificate of Cost Incurred for Development for Construction of SAMARTH PRIDE Building stuated on Gut No :38 ( Part),Sawangi, Tal &Dist: Aurangabad , demarcated by its boundaries To the east - Gut No:36 , Tothe West : Gut No: 30,To The South: Gut No:38 ( Part) &, To The North: 9.00 m wide approach road and Gut No :38 ( Part), admeasuring Land area = 2850 .00 Sq.Mt and Proposed built up area : 2091.74Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- PS1500045981 Sir LEr. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being of Building SAMRTH PRIDE"situated on Gut No : 38 (Part),Sawangi,Tal & Dist:Aiurangabad , demarcated by its boundaries To the east - Gut No :36 , To the West:Gut No:30,To The South: Gut No : 38(Part) &, To The North:9.00 mwide approach road and Gut No 38( Part), admeasuring Land area =285000 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Developer. i) Shri Dhananjay B.Doifode as LS./ Architect; ii) ShriAbhay Subrao Patil as Structural Consultant i) ShriAbhay Subrao Patil as Quantity Surveyor. 2 We have estimated the cost of the completion to obtain Occupation Certificate of the Civil.,MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under referénce by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of matèrial, labour and other inputs made by Developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building from BHAY CIDCO , Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being PATIE Res. No. M-1475244|) MIE)Engis artered implemented. 2,71,74,548 (- The amount of Estimated (ost 4 The Estimated Cost Incurred tilldate is calculated at Rs. Incurred is calculated on the base of amount of Total Estimated Cost. the subject project to S. The Balance cost of Completion of the Civil, MEP and Allied works of the Build1ng of obtain Occupation Certificate from CIDCO ,Aurangabad is estimated at Rs. 2,13,53,620/ 6. Icertify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table Aand Bbelow TABLE-A Sr.No. Particulars Amounts 1. Total Estimated cost of the building as pn date of Registration is Rs 3,63,9I,598 / 2. Cost Incurred as on date of certificate Rs 2,03,90,212 / 3. Work done in Percentage S6.03 % 4. Balance Cost to be Incurred Rs I,60,01,386 / 5 Cost Incurred on Additional /Extra Items as on date of certi ficate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts Total Estimated cost of the internal and external development works including Rs 1,21,08,400 | amities and facilities in the layout as on date of Registration is 2 Cost Incurred as on date of certificate Rs 67,84,336 / 3 Work done in Percentage 56.03 % 4. Balance Cost to be Incurred Rs 53,24,064 / Cost Incurred on Additional / Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) BHAY Yours Faithfully Res.No.PAL (M-1475244) Abhay Subrao Patil (MIE)Engi hartere Agreed &Accepted by: Signature of Promoter Name: Date: 03-07-2024 Note: approved from time The scope of work is to complete Registered Real Estate Project as per drawings 1. the Agreement to Sale. mentioned in to time as per specifications independent Quantity Survey can be done by the office of Engineer or can be done by an 2. (*) Calculated, can be relied up on by Engineer. In Quantity Surveyor, who's Certificate of Quantity Developer, the name has to be mentioned quantity surveyor being appointed by case of independent are being calculated by ofice of Engineer, the name of at the place marked (*) & in case quantity mentioned in the office of Engineer, who is respon sible for the quantity calculated should be person at the place marked (*). (**) BalanceCost to be incurred (4) may vary from difference between Total Estimated Cost () & 3. regquired / escalation of cost etc. As this is an actual Cost incurred (2) due to deviation in quantity Development of Real Estate Project will the Estimated Cost any deviation quantity required forincurred. result in an amendment of the cost incurred /to be not exhaustive 4. Allcomponents of work with specifications are indicative & Example: Any deviation in input material 5. Please specify if there are any deviations / quali fications. used from specifications in Agreement of Sale. ANNEXURE - A Cost List of Extra /Additional/ Deleted Items considered in the (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) 1 2 eHAY P Res. No. M-1(MIE)475244) tered Engine