FORM-2 ENGINEER'S CERTIFICATE Date:10.04.2024 To, M/S Samarth Pride, Gut No : 38, Jalgaon Road, Ssawangi, Aurangabad. Subject: Certificate of Cost Incurred for Development for Construction of SAMARTHPRIDE Building situated on Gut No :38 (Part), Sawangi,Tal &Dist: Aurangabad ,demarcated by its boundaries To :9.00m the east -Gut No :36 , To the West :Gut No : 30,To The South: Gut No: 38 ( Part) &, To The North wide approach road and Gut No :38 (Part), admeasuring Land area = 2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- PS1500045981 Sir LEr. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being of Building " SAMRTH PRIDE"situated on Gut No :38 (Part) ,Sawangi ,Tal &Dist :Aiurangabad ,demarcated by is boundaries To the east -Gut No :36 ,To the West : Gut No :30,To The South: Gut No:38(Part) &, To The North:9.00 mwide approach road and Gut No 38 ( Part),admeasuring Land area =2850.00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1.Following technical professionals are appointed by Developer: i) ShriDhananjay B.Doifode as L.S./ Architect; i) Shri Abhay Subrao Patilas Structural Consultant ii) Shri Abhay Subrao Patil as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate of the Civil,MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to s for the project under reference by the Developer.and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Total Cost of project is with reference to the Civil., MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building from BHAY CIDCO , Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being PATIZ Res. No. *M-1475244) * (MIE)Engis implemented. hartere The Estimated Cost Incurred till date is calculated at Rs. 2,64.37,349 /- The amount of Estimated (ost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate from CIDCO, Aurangabad is estimated at Rs. 2,20,90,819 / 6. Icertify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table AandB below TABLE-A Sr.No. Particulars Amounts Total Estimatedcost of the building as on date of Registration is Rs 3,63,91,598 / 2 Cost Incurred as on date of certificate Rs 1,98,37,060 / 3 Work done in Percentage 54.51 % 4 Balance Cost to be Incurred Rs I,65,54,538 / 5 Cost Incurred on Additional / Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Total Estimated cost of the internal and external development works Amounts including Rs 1,21,08,400 / amities and facilities in the layout as on date of Registration is 2 Cost Incurred as on date of certificate Rs 66,00,289 / 3 Work done in Percentage 54.51 % 4 Balance Cost to be Incurred Rs 55,08,|||/ 5 Cost Incurred on Additional / Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) Yours Faithfully Res. No. *(M-1475244) * Abhay Subrao Patil artere (MIE) Sngine Agreed &Accepted by: Signature of Promoter Name: Date: 10-04-2024 Note: 1. The scope of work is tocomplete Registered Rcal Estate Project as per drawings approved from time Sale. Agreement to to timeas per specifications mentioned in the or can be done by an independent 2. (*) Quantity Survey can be done by the ofice of Engineer by Engineer. In Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on the name has to be mentioned case of independent quantity surveyor being appointed by Developer, of Engineer, the name of at the place marked (*) & in case quantity are being calculated by office calculated should be mentioned person in the office of Engineer, who is responsible for the quantity at the place marked (*). between Total Estimated Cost (1) & 3. (**) Balance Cost to be incurred (4) may vary from difference is an actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incuIred. exhaustive 4. All components of work with specifications are indicative & not 5. Please specify if there are any deviations/qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. ANNEXURE - A List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra/ Additional/Deleted Items Amount (in Rs.) 1 2 BHAY Res. No. PA; (M-1475244) (MIE) rtered Engine