FORM-2 ENGINEER'S CERTIFICATE Date: 06.10.2023 To, M/S Samarth Pride, Gut No :38, Jalgaon Road , Ssawangi , Aurangabad. Construction ofSAMARTH PRIDE Subject: Certificate of Cost Incurred for Development for Aurangabad , demarcated by its boundaries To Building situated on Gut No : 38 (Part), Sawangi, Tal &Dist: South: Gut No:38( Part) &,To The North :9.00 m the east -Gut No :36 , To the West : Gut No:30,To The 2850 .00 Sq.Mt and Proposed built up wide approach road and Gut No:38 ( Part), admeasuring Land area = area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- P51500045981 Sir Subject Real Estate L, Er. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the PRIDE"Situated on Gut No: 38 Project proposed to be registered under RERA,being of Building SAMRTH (Part), Sawangi , Tal &Dist : Aiurangabad , demarcated by its boundaries To the east -Gut No : 36, To the West: Gut No :30,To The South:Gut No:38 (Part) &, To The North:9.00 mwide approach road and Gut No : 38 ( Part), admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1.Following technical professionals are appointed by Developer: i) Shri Dhananjay .B.Doifode as L.S./ Architect; ii) Shri Abhay Subrao Patil as Structural Consultant iü) Shri Abhay Subrao Patil as Quantity Surveyor. 2 We have estimated the cost of the completion to obtain Occupation Certificate of the Civil MEP and Allied works, of the Building ofthe projec. Our estimated cost calculations are based on the Drawings/plans made . available to us for the project under reference by tbe Developer and Consultants and the Schedule of items and quantity for the entire work as calcuBated by Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Total Cost of project is with reference to the Civil., MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building from ABHAF CIDCO , Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being PAT Res. No. implemented. *M-1(MI)475244) Engine amount of Estimated Cost 4 The Estimated Cost Incurred till date is calculated at Rs. 2,42,49,999 |- The Incurred is calculated on the base of amount of Total Estimated Cost. 5 The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate from CIDCO, Aurangabad is estimated at Rs. 2,42,78,169 - 6 Icertify that the Cost of the Civil, MEP and alied work for the aforesaid Project as completed on the date of this certificate is as given in Table Aand Bbelow TABLE-A Sr.No. Particulars Amounts 1. Total Estimated cost of the building as on date of Registration is Rs 3,63,91,598 / 2 Cost Incurred as on date of certificate Rs 1,81,95, 799 / 3 Work done in Percentage 50 % 4 Balance Cost to be Incurred Rs 1,81,95,799 / Cost Incurred on Additional /Extra Items as on date of certificate not included| Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts 1 Total Estinmated cost of theinternal and external development works including Rs 1,21,08,400/ amities and facilities in the layout as on date of Registration is 2 Cost Incurred as on date of certificate Rs 60,54,200 / 3. Work done in Percentage 50 % 4 Balance Cost to be Incurred Rs 60,54,200 / 5 Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) Yours Faithfully Res. No. *M-1475244) Abhay Subrao Patil artere (MIE)Engine? Agreed & Accepted by: Signature of Promoter Name: Date: 06-10-2023 Note 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. independent 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an by Engineer In Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on to be mentioned case of independent quantity surveyor being appointed by Developer, the name has Engineer, the name of at the place marked (*) & in case quantity are being cal culated by oftice of should be mentioned person in the office of Engineer, who is responsible for the quntity calculated at the place marked (*). Total Estimated Cost () & 3. (**) Balance Cost te be incurred (4)may vary from diference between this is an actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As will Estimated Cost any deviation quantity required for the Development of Real Estate Project result in an anendment of the cost incured /to be incurred. 4. Allcomponents of work with specifications are indicative & not exhaustive material 5. Pleasespecify if there are any deviations / qua1 fications. Example Any deviation in input used from specifications in Agreement of Sale ANNEXURE - A List of Extra / Additional/Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) 1 2 ABHA Res. PNAoT.IZ (MM-I14E7)524 ered Enginees