FORM-2 ENGINEER'S CERTIFICATE Date: 02.07.2023 To, MISSamarth Pride, Gut No: 38, Jalgaon Road, Ssawangi , Aurangabad. Subject: Certificate of Cost Incurred for Development for Construction of " SAMARTH PRIDE" Building situated on Gut No :38 (Part), Sawangi , Tal &Dist: Aurangabad , demarcated by its boundaries To the east -Gut No :36 , To the West :Gut No :30,To The South : Gut No : 38 ( Part) &, To The North:9,00 m wide approach road and Gut No :38 (Part), admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- P51500045981 Sir LEr. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being of Building SAMRTH PRIDE " situated on Gut No: 38 (Part), Sawangi , Tal & Dist:Aiurangabad , demarcated by its boundaries To the east - Gut No : 36 ,To the West : Gut No :30,To The South : Gut No :38 (Part) &,To The North :9.00 mwide approach road and Gut No 38 (Part), admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1.Following technical professionals are appointed by Developer: i) Shri Dhananjay .B.Doifode as L.S./ Architect; ii) Shri Abhay Subrao Patil as Structural Consultant ii) Shri Abhay Subrao Patil as Quantity Surveyor. 2 We have estimated the cost of the completion to obtain Occupation Certificate of the Civil,MEP and Allied works,of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer. and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168/- The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of oblaining occupation certificate for the building from BHAY P CIDCO , Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being Res. No. implemented. *{M-1475244) (MÊE) artere Eng at Rs. 2.29,35,649 /- The amount of Estimated (ost 4 The Estimated Cost Incurred till date is calculated Incurred is calculated on the base of amount of Total Estimated Cost. the subject project to The Balance cost of Completion of the Civil, MEP and Allied works of the Building of obtain Occupation Certificate from CIDCO, Aurangabad is estimated at Rs. 2,55,92,519 6. Icertify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date ot this certificate is as given in Table A and B below TABLE-A Sr.No. Particulars Amounts Total Estimated cost of the building as on date of Registration is Rs 3,63,91,598 / 2 Cost Incurred as on date of certificate Rs 1,72,09,587 / 3 Work done in Percentage 47.29 % 4. Balance Cost to be Incurred Rs 1,91,82,0|| / 5 Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts 1. Total Estimated cost of the internal and external development works including Rs 1,21,08,400 / amities and facilities in the layout as on date of Registration is 2 Cost Incurred as on date of certificate Rs 57,26,062 / 3 Work done in Percentage 47.29 % 4 Balance Cost to be Incurred Rs 63,82,338 / Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Ni. in the Estimated Cost (Annexure-A) BHAY Yours Faithfully Abhay Subrao Patil Res. No.PATE M-1475244)| (MIE)Engig hart tered Agreed &Accepted by: Signature of Promoter Name: Date: 02-07-2023 Note: 1. The scope of work is to complete Registered Rcal Estate Project as per drawings approved from time totime as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. In mentioned case of independent quantity surveyor being appointed by Developer, the name has to be name of at the place marked () & in case quantity are being calculated by office of Engincer, the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (+). & 3. (**) Balance Cost to be incurred (4) may vary from difference between.Total Estimated Cost (1 ) actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred/to be incurred. 4. Allcomponents of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. ANNEXURE A List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) 1 2. BHAr Res. No. (M-(1M4I7E5)24 ) tered Snainees