FORM-2 ENGINEER'S CERTIFICATE Date: 07.04.2023 To, MIS Samarth Pride, Gut No : 38, Jalgaon Road, Ssawangi , Aurangabad. SAMARTH PRIDE Subject: Certificate of Cost Incurred for Development for Construction of demarcated by its boundaries To Building situated on Gut No :38 (Part), Sawangi, Tal &Dist: Aurangabad , No: 38 ( Part) &, To The North:9.00 m the east -Gut No:36 ,To the West : Gut No :30,To The South : Gut Sq.Mt and Proposed built up wide approach road and Gut No :38 ( Part), admeasuring Land area = 2850 .00 area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- P51500045981 Sir the Subject Real Estate 1, Er. Abhay Subrao Patil have undertaken asignment of certifying Estimated Cost for PRIDE"situated on Gut No:38 Project proposed to be registered under RERA, being of Building " SAMRTH -Gut No : 36 ,To the (Part), Sawangi, Tal &Dist: Aiurangabad ,demarcated by its boundaries To the east No West : Gut No :30,To The South: Gut No:38 ( Part) &, To The North :9.00 mwide approach road and Gut Sq.Mt being 38 ( Part), admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Developer: i) Shri Dhananjay .B.Doifode as L.S./ Architect; ii) Shri Abhay Subrao Patil as Structural Consultant ii) Shri Abhay Subrao Patil as Quantity Surveyor. 2 We have estimated the cost of the completion to obtain Occupation Certificate of the Civil,MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available tous for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculatedby Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labou and other inputs made by Developer, and the site inspection carried out by us. 3 We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Tolal Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building from CIDCO, Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project isbeing 4 implemented. Res. No. *M-1475244) artere (MIE)Engins Rs. 2,11,94,497 /- The amount of Est1mated Cost 4 The Estimated Cost Incurred till date is calculated at Cost. Incurred is calculated on the base of amount of Total Estimated Building of the subject project to 5 The Balance cost of Completion of the Civil,MEP and Allied works of the obtain Occupation Certificate from CIDCO, Aurangabad is estimated at Rs. 2,73,33,670 - 6 Icertify that the Costof the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A andB below TABLE-A Sr.No. Particulars Amounts Total Estimated cost of the building as on date of Registration is Rs 3,63,91,598 / 2. Cost Incurred as on date of certificate Rs 1,59,03,128 / 3 Work done in Percentage 43.70 % 4. Balance Cost to be Incurred Rs 2,04,88,470 / 5. Cost Incurred on Additional /ExtraItems as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts 1 Total Estimated cost of the internal and externaldevelopment works including Rs ,21,08,400 / amities and facilities in the layout as on date of Registration is 2 Cost Incurred as on date of certificate Rs 52,91,370 / 3 Work done in Percentage 43.70 % 4 Balance Cost to be Incurred Rs 68,17,030 / Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) RBHAY Yours Faithfully Abhay Subrao Patil PAT Res. No. +(M-1475244 artered(MIE)Engir ha Agreed &Accepted by: Signature of Promoter Name: Date: 07-04-2023 Note: time of work is to complete Registered Real Estate Project as per drawings approved from 1 The scope mentioned in the Agreement to Sale. to timeas per specifications independent Quantity Survey can be done by the office of Engineer or can be done by an 2. (*) Engineer. In Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Quantity mentioned appointed by Developer, the name has to be case of independent quantity surveyor being being calculated by office of Engineer, the name of are at the place marked (*) & in case quantity mentioned ofice of Engincer, who is responsible for the quantity calculated should be person in the at the place marked (*). Cost (1) & vary from difference between Total Estimated 3. (**) Balance Cost to be incurred (4) may an quantity required / escalation of cost etc. As this is actual Cost incured (2) due to deviation in Real Estate Project will Development of Estimated Cost any deviation quantity required for the incured. result in an amendment of the cost incurred/tobe & not exhaustive 4. Allcomponents of work with specifications are indicative qualifications. Example: Any deviation in input material 5. Please specify if there are any deviations / used from specifications in Agreement of Sale. ANNEXURE - A in the Cost List of Extra / Additional / Deleted Items considered Cost) (Which were not parts of the original Estimate of Total S. No. List of Extra/ Additional /Deleted Items Amount (in Rs.) 1 2. SHAY PA Res. No. M-1475244)* Sngine (MIE) arts ered e