FORM-2 ENGINEER'S CERTIFICATE Date: 08.01.2023 To, MIS Samarth Pride, Gut No :38, Jalgaon Road, Ssawangi, Aurangabad. SAMARTH PRIDE " Subject: Certificate of Cost Incurred for Development for Construction of demarcated by its boundaries To Building situated on Gut No : 38 (Part), Sawangi, Tal &Dist: Aurangabad , No:38 ( Part) &, To The North:9.00 m the east -Gut No :36 ,To the West :Gut No :30,To The South: Gut Sq.Mt and Proposed built up wide approach road and Gut No : 38 ( Part) ,admeasuring Land area = 2850 .00 area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- PS1500045981 Sir Subject Real Estate 1, Er. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the PRIDE"situated on Gut No:38 Project proposed to be registered under RERA, being of Building SAMRTH Gut No :36, To the (Part), Sawangi , Tal &Dist: Aiurangabad,demarcated by its boundaries To the east - No : West: Gut No:30,To The South: Gut No :38 (Part) &, To The North:9.00 m wide approach road and Gut being 38 ( Part), admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Developer. i) Shri Dhananjay .B.Doifode as L.S./ Architect; ii) Shri Abhay Subrao Patil as Structural Consultant ii) Shri Abhay Subrao Patil as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate of the Civil.MEP and Allied works,of the Building ofthe project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Abhay Subrao Patil uantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. 3 Weestimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Total Cost of project is with reference to the Civil, MEP and allied works requiredto be completed for the purpose of obtaining occupation certificate for the building from BHAY CIDCO ,Aurangabad being the Planning Authorityunder whose jurisdiction the aforesaid project is being PATIRes. No. *M-1475244)* implemented. artere MIE) Sngine 1,72,51,449 /- The amount of Estimated Cost 4. The Estimated Cost Incurred till date is calculated at Rs. Incurred is calculated on the base of amount of Total Estimated Cost. subject project to 5 The Balance cost of Completionof the Civil, MEP and Allied works of the Building of the obtain Occupation Certificate from CIDCO,Aurangabad is estimated at Rs. 3,12,76,719 / of 6. Icertify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date this certificate is as given in Table A andB below TABLE-A Sr.No. Particulars Amounts Total Estimatedcost of the building as on date of Registration is Rs3,63,91,598 / 2 Cost Incurred as on date of certificate Rs 1,29,44,491 / 3 Work done in Percentage 35.57 % 4. Balance Cost to be Incurred Rs 2,34,47, 107 / Cost Incurredon Additional /Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts 1. Total Estimated cost of the internal and external development works including Rs 1,21,08,400/ amities and facilities in the layout as on date of Registration is 2. Cost Incured as on date of certificate Rs 43,06958 / 3. Work done in Percentage 35.57 % 4. Balance Cost to be Incurred Rs 78,01,442 / 5 Cost Incurred on Additional / Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) Yours Faithfully Res. No. M-1475244 ) Abhay Subrao Patil (MIE) Agreed &Accepted by: Signatureof Promoter Name: artered IEng Date: 08-01-2023 Note: Real Estate Project as per drawingsapproved from time 1. The scope of work is to complete Registered Agreement to Sale. to time as per specifications mentioned in the independent Quantity Survey can be done by the office of Engineer or can be done by an 2. (*) Calculated, can be relied up on by Engineer. In Quantity Surveyor, who's Certificate of Quantity mentioned independent quantity surveyor being appointed by Developer, the name has to be case of Engineer, the namne of at the place marked (*) & in case quantity are being calculated by ofice of mentioned office of Engineer, who is responsible for the quantity calculated should be person inthe at the place marked (*). Estimnated Cost (1) & Balance Cost to be incurred (4)may vary from difference between Total is an 3. (**) quantity required / escalation of cost etc. As this actualCost incurred (2)due to deviation in Real Estate Project will Estimated Cost any deviation quantity required for the Development of to be incurred. incurred / result in an amendment of the cost are indicative & not exhaustive 4. All components of work with specifications specify if there are any deviations / qualifications. Example: Any deviation in input material 5. Please used from specifications in Agreement of Sale. ANNEXURE - A considered in the Cost List of Extra / Additional/Deleted Items Estimate of Total Cost) (Which were not parts of the original Amount (in Rs.) S. No. List of Extra / Additional/Deleted Items 1 2 BHAY PATI Res. No. M-1475244 artere (MIE)Engine