FORM-2 ENGINEER'SCERTIFICATE Date: 05.10.2022 To, MIS Samarth Pride, Gut No: 38, Jalgaon Road , Ssawangi , Aurangabad. Subject: Certificate of Cost Incurred for Development for Construction of SAMARTH PRIDE" Building situated on Gut No : 38 ( Part), Sawangi, Tal &Dist : Aiurangabad demarcated by its boundaries To the east - Gut No :36 ,To the West :Gut No :30,To The South :Gut No: 38 (Part) &, To The North :9.00 m wide approach road andGut No :38 (Part) ,admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. Ref: RERA Registration Number- PS1500045981 Sir ,Er. Abhay Subrao Patil have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being of Building "SAMRTH PRIDE" situated on Gut No :38 (Part),Sawangi ,Tal &Dist :Aiurangabad ,demarcated by its boundaries To the east - Gut No :36 ,To the West : Gut No :30,To The South :Gut No :38 ( Part) &, To The North :9.00 mwide approach road and Gut No 38 ( Part) , admeasuring Land area =2850 .00 Sq.Mt and Proposed built up area : 2091.74 Sq.Mt being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Developer. i) Shri Dhananjay .B.Doifode as L.S./ Architect; ii) Shri Abhay Subrao Patil as Structural Consultant ii) Shri Abhay Subrao Patil as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate of the Civil,MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as caleulated by.Shri Abhay Subrao Patil quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by Developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 4,85,28,168 /- The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certi ficate for the building from BHAY CIDCO , Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being PA Res. No. implemented. M-1475244)+ (MIE) tered Engic 4 The Estimated Cost Incurred till date is calculated at Rs. 1,30.22,249 - The amount of Estimated Cost Incurred is calculatedon the base of amount of Total Estimated Cost. 5. The Balance costof Completion of the Civil, MEP and Allied works of the Building of the subject project to oblain Occupation Certificate from CIDCO, Aurangabad is estimated at Rs. 3,55,05,919 - 6 Icertifly that the Costof the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TABLE-A Sr.No. Particulars Amounts 1. Total Estimated cost of the building as on date of Registration is Rs 3,63,91,598 / 2 Cost lncurred as on date of certificate Rs 97,71,144 / 3 Work done in Percentage 26.85 % 4 Balance Cost to be Incurred Rs 2,66,20,454 / Cost Incurred on Additional / Extra Items as on date of certificate not included Rs Nil. in the Estimated Cost (Annexure-A) TABLE-B Sr.No. Particulars Amounts Total Estimated cost of the internal and external development works including Rs 121,08,400 / amities and facilities in the layout as on date of Registration is 2 Cost Incurred as on date of certificate Rs 32,51,105 / 3 Work done in Percentage 26.85 % 4 Balance Cost to be Incurred Rs 88,57,295 / 5 Cost Incurred on Additional /Extra Items as on date of certificate not included Rs Nil. the Estimated Cost (Annexure-A) BHAY Yours Faithfully PAT Res. No. *M-1475244) Abhay Subrao Patil (MIE) artere Engin' Agreed & Accepted by: Signature of Promoter Name: Date: 05-10-2022 Note: 1. The scope of workis to complete Registered Real Estate Project asper drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who'sCertificate of Quanity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer,the name has to be mentioned at the place marked (*)& in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (). 3. (**) Balance Cost to be incured (4) may vary from diference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred /to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. ANNEXURE - A List of Extra / Additional/ Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra/ Additional /Deleted Items Amount (in Rs.) 1 2 ABHA Res. No. (M-147524 Chart tered (MIESngineeS )