Ar. Doifode Dhananjay (B.ARCH), (M.ARCH) ARE " ARCHITECTS " INTERIORDESIGNERS PROJECT CONSULTANTS DEVA's GROUP DARCHITECT's, "GANRAJ" Plot no3 &4, Gajanan colony, Garkheda,AUrangabad. 431009 PHONE NO, -+9)-9373294230, 9822294230, 8275326061, 9767455995 DATE: FORM 1 (see Regulation 3| ARCHITECT'S CERTIFICATE (o be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 08.01.23 To The M/s Samarth Pride, Gut no.-38, Jalgaon Road, Sawang, Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number] situated on the Plot bearing SawangiGut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P) to the South, Land of gut no. 36 to the East, Land of gut no. 30 to the West of Division Aurangabad vllage Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sq.mts. &Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. Sir, IDhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for theSubject Real Estate Project proposedto be registered under RERA, beingof the Building / Phase of the Project, situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sq.mts.& Proposed Built upArea= 2091.74 sq.mt. area being developed by M/sSamarth Pride. 1 Following technical professionals are appointed by Owner / Promoter: (1) Shri. Dhananjay B. Doifode.as LS./ Architect; (i) Shri. Abhay Patil. as Structural Consultant. of the aforesaid Real Based on Site Inspection, with respect to each of the Building/Wing done for each of Estate Project, Icertify that as on the date of this certificate, the Percentage of Work P51500045981under RERA is the building/Wing of the Real Estate Project as registered vide number with respect to each of the major as per table A herein below. The percentage of the workexecuted to each Building/Wing activity of the Building Wing and Overall Percentage of work done withrespect is detailed in the Table B. TABLE-A building/Wing of A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100 % 1 Basement's (if any) N.A 2 Podiums (if any) N.A. 3 100 % 4 Plinth 01 Stilt Floor N.A. 5 02 Slabs of Super Structure 25% 6 Internal walls, Internal Plaster, Floorings, I) doors and 00 % windowS within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % 00% Staircases. lifts' Wells and Lobbies at each Floor level Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 00% 10 completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings andN.A. mechanical Equipment as per CFO NOC, Electrical fittings, conditions of environment/CRZ equipment, compliance to NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. building/Wing of B-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout The Project) Percentage of Actual Work S Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100% 1 Basement's (if any) N.A. 2 3 Podiums (if any) N.A. 4 Plinth 100 % 01 Stilt Floor N.A. 02 Slabs of Super Structure 25 % 5 7 Internal walls, Internal Plaster, Floorings, I) doors and 00 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 00% 10 completion of terraces with waterproofing of the Building/wing. Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. 11 mechanical Equipment as per CFO NO0C, Electrical fittings, conditions of environment/CRZ equipment, compliance to NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. Wall and all other requirements as may be required tO complete project as per specifications in agreement of Sale. Any other activities. C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout build1ing/Wing of The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100 % 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. 4. Plinth 100% 01 Stilt Floor N.A. 02 Slabs of Super Structure 20% 7 Internal walls, Internal Plaster, Floorings, ) doors and 00 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at cach Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. of D-lype Building (SAMARTH PRIDE) (To be prepared separately tor each Layout building/Wing The Project) Percentage of Actual Work Sr Tasks/Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100 % 1. Basement's (if any) N.A. 2. Podiums (if any) N.A. 3. 100 % 4 Plinth N.A. 5. 01Stilt Floor 02 Slabs of Super Structure 20 % 6 Floorings, ) doors and 00% 7 Internal walls, Internal Plaster, windows within Flats/Premises 00 % Sanitary Fittings within the Flat/Premises level 00 % Staircases. lifts' Wells and Lobbies at each Floor Overhead and Underground Water Tanks 00 % 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. and N.A. 11 Installation of Lifts. water pumps, Fire Fitting Fittings Electrical fittings, mechanical Equipment as per CFO NOC, environment/CRZ equipment, compliance to conditions of plinth protection, NOC. Finishing to entrance lobby/s. Building/Wing. Compound paving of areas appurtenant to may be required to Wall and all other requirements as agreement of Sale. complete project as per specifications in Any other activities. TABLE -B Common Areas (Internal and xternal Development Works) in respect of the Registered Phase/Project Number Sr Proposed Percentage Details Common areas and facilities No (Yes/No) of Actual (3) Work (5) (1) (2) Done (As on date of the Certificate) (4) N.A. N.A. N.A. 1. Internal Roads & Footpaths 00% BOREWELL 2 Water Supply yes 3 Sewerage (Chamber, lines, Septic Tank, STP). Septik 00% yes Tank N.A. N.A. N.A. 4 Storm Water Drains YES 00 % GARDEN 5 Landscaping & Tree Planting YES 00 % Along Road 6. Street Lighting 7 Community Buildings N.A. N.A N.A. Treatment and disposal of sewage and sullageN.A. N.A. N.A. water. Solid Waste management & Disposal N.A. N.A. N.A. Water conservation / Rain water harvesting Upto 00 % 00 % 10 BorewelIl Energy management. N.A. N.A. NA. 11 12 fire protection and lire Safety requirements N.A. N.A. N.A. Electrical meter room, sub-station, receiving METER 00% N.A. 13 station. Others (Option to Add more) N.A. N.A. N.A. 14 ARCHITECI Mr. Dhananjay B. Doifode (8.Arch, M.Arch) CA/2013/60839 Garraj" P.No.3 &4, Gajanan Colony, Aurange Your's Faithfully, Signature & Name (IN BL0CK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Name: M/s Samarth Pride. Date:08.01.2023