Ar. Doifode Dhananjay EOUARE ARE (B.ARCH), (M.ARCH) " ARCHITECTS " INTERIOR DESIGNERS " PROJECT CONSULTANTS DEVA's GROUP D°ARCHITECT'S, "GANRAJ" Plot no 3 8& 4, Gajanan colony, Garkheda,Aurangabad. 431o09 PHONE NO,- +91-9373294230, 9822294230, 8275326061, 9767455995 FORM 1 DATE: Isee Regulation 3| ARCHITECT'S CERTIFICATE (lobe submitted at the time ot Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 07.04.23 To The M/s Samarth Pride Gut no-38, Jalgaon Road, Sawangi , Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number) situated on the Plot bearing Sawangi Gut no. 38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P) tothe South,Land of gut no. 36 tothe East, Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. &Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. Sir, IDhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for theSubject Real Estate Project proposed to be registered under RERA, beingof the Building / Phase of the Project, situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010admeasuring LandArea =2850.00 sq.mts.& Proposed Built up Area- 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Owner /Promoter : (1) Shri. Dhananjay B. Doifode.as L.S. / Architect; (i) Shri. Abhay Patil. as Structural Consultant. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51500045981 under RERA is as per table Aherein below. The percentage of the work executed with respect to each of the major activity of the Building Wing and Overall Percentage of work done withrespect to each Building/Wing is detailed in the Table B. TABLE-A A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100 % Basement's (if any) N.A. N.A. 3 Podiums(if any) Plinth 100 % 5. 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 50% 7 Internal walls, Internal Plaster, Floorings, I) doors and 00% windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00% Staircases. lifts' Wells and Lobbies at each Floor level 00% 9 Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lotbby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. B-Type Building (SAMARTH PRIDE) (To be prepared separately tor each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100% 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. Plinth 100 % 01 Stilt Floor N.A 5. 6. 02 Slabs of Super Structure 50 % Internal walls, Internal Plaster, Floorings, I) doors and 00 % 7. windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00% Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. N.A. 1: Installation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks / Activity Percentage of ActualWork No Done (2) (As on date of this (1) Certificate) (3) 1 txcavation 100 % Basement's (it any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100 % 5 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 50% 7 Internal walls, Internal Plaster, Floorings, I) doors and 00% windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00% 9 Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completionof terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. D-lype Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1. Excavation 100 % Basement's ut aly) N.A. Podiums (it any) N.A. 3. Plinth 100 % 4. 01 Stilt Floor N.A. 5 02 Slabs of Super Structure 50 % 6 Internal walls, Internal Plaster, Floorings, ) doors and 00 % 7. WIndowS Within Flats/Premise Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 00 % 10 completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings andN.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Details Proposed Percentage Sr Common areas and facilities of Actual No (Yes/No) (3) Work (5) (1) (2) Done (As on date of the Certificate) (4) N.A. N.A. 1 Internal Roads & Footpaths N.A. 00 % BOREWELL 2 Water Supply yes 00% yes 3 Sewerage (Chamber, lines, Septic Tank, STP). Septik Tank N.A. N.A. N.A. 4 Storm Water Drains 00% GARDEN Landscaping & Tree Planting YES 5 Along Road YES 00% 6 Street Lighting N.A. N.A. N.A. Community Buildings N.A. N.A. N.A. Treatment and disposal of sewage and sullage water. N.A. N.A. N.A. Solid Waste management & Disposal 00 % 00% 10 Water conservation / Rain water harvesting Upto Borewell N.A. N.A. N.A. 11 Energy management. requirements N.A. N.A. N.A. 12 fire protection and lire Safety receiving METER 00% N.A. 13 Electrical meter room, sub-station, station. N.A. Others (Option to Add more) N.A. N.A. 14 ARCHITECT Doifode Mr. Dhananjay B. (B.Arch, M.Arch) CA/2013/60839 Gunraj" P No.3 &4, Gajanan Coiony, Aurangaos Your's Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Name: M/sSamarth Pride. Date 07 04.2023