Ar. Doifode Dhananjay DEVA's GROUP SQUARE (B.ARCH.), (M.ARCH.) " ARCHITECTS " INTERIOR DESIGNERS PROJECT CONSULTANTS D°ARCHITECTS,"GANRAJ" Plot no 3 & 4,Gajanan colony, Garkheda,Aurangatbad. 431009 PHONE NO. - +91-937329423o, 9822294230, 8275326061, 9757455995 DATE FORM 1 [see Regulation 3I (To be submitted at the time of ARCHITECT'S CERTIFICATE Registration of Ongoing Project and for withdrawal of Money from Account) Designated Date: 06.10.2023 To The M/s Samarth Pride, Gut no.-38,Jalgaon Road, Sawangi, Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "sSAMARTH PRIDE" Building's of the Project [RERA Registration Number] situated on the Plot bearing Sawangi Gut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) & 9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P) to the South, Land of gut no. 36 to the East, Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. & Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/sSamarth Pride. Sir IDhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for theSubject Real Estate Project proposed to be registered under RERA, beingof the Building/ Phase of the Project, situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts.& Proposed Built up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Owner / Promoter : (1) Shri. Dhananjay B. Doifode.as L.S. / Architect; (i) Shri. Abhay Patil. as Structural Consultant. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51500045981under RERA is as per table A herein below. The percentage of the work exeCuted with respect to each of the major activityof the Building Wing and Overall Percentage of work done withrespect to each Building/Wing is detailed in the Table B. TABLE-A A-TYpe Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100 % 2. Basement's (if any) N.A. 3. Podiums (if any) N.A. 4 Plinth 100 % 5 01 Stilt Floor N.A. 02 Slabs of Super Structure 90 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 00 % windowS within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 00 % 9 Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. separately for each Layout building/Wing of B-Type Building (SAMARTH PRIDE) (To be prepared The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 100 % 1 Excavation Basement's (if any) N.A. 2 Podiums (if any) N.A. 3 100 % 4 Plinth 5 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 90% Internal walls, Internal Plaster, Floorings, I) doors and 00 % 7. windoWS within Flats/Premises Sanitary Fittings within the Flat/Premises 00% Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster,elevation, 00% completion of terraces with waterproofing of the 8uilding/ wing 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to Complete project as per specifications in agreement of Sale. Anyother activities. building/Wing of separately for each Layout C-Type Building (SAMARTH PRIDE) (To be prepared The Project) Percentage of Actual Work Tasks / Activity Done Sr No (2) (As on date of this Certificate) (1) (3) 100 % 1. Excavation N.A. 2 Basement's (if any) N.A. 3 Podiums (if any) 100% 4 Plinth N.A. 5 01 Stilt Floor 80 % 6 02 Slabs of Super Structure doors and 00 % 7. Internal walls, Internal Plaster, Floorings, ) windowvS within Flats/Premises 00 % Sanitary Fittings within the Flat/Premises level 00 % Staircases. lifts' Wells and Lobbies at each Floor Overhead and Underground Water Tanks 00% 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. N.A. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. D-Type Building (SAMARTH PRIDE) (To be prepared separately for each The Project) Layout building/Wing of Sr Tasks / Activity Percentage of Actual Work No (2) Done (1) (As on date of this Certificate) (3) 1 Excavation 100 % 2 Basement's(if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100% 5 01 Stilt Floor N.A. 02 Slabs of Super Structure 80% 7 Internal walls, Internal Plaster, Floorings, I) doors and 00 % windowS within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 00% 9 Staircases. lifts' Wells and Lobbies at each Floor level 00% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to Complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Proposed Percentage Details Sr Common areas and facilities No (Yes/No) of Actual (3) Work (5) (1) (2) Done (As on date of the Certificate) (4) 1 Internal Roads & Footpaths N.A. N.A. N.A. Water Supply 00% BOREWELL 2. yes Sewerage (Chamber, lines, SepticTank, STP). Septik 00 % yes Tank 4. Storm Water Drains N.A. N.A. N.A. Landscaping & Tree Planting YES 00 % GARDEN 6 Street Lighting YES 00 % Along Road 7 Community Buildings N.A. N.A. N.A. Treatment and disposal of sewage and sullage N.A. N.A. N.A. Water. SolidWaste management & Disposal N.A. N.A. N.A. 10 Water conservation/ Rain water harvesting Upto 00 % 00 % Borewell 11 Energy management. N.A. N.A. N.A. 12 fire protection and lire Safety requirements N.A. N.A. N.A. 13 Electrical meter room, sub-station, receiving METER 00 % N.A. Station. 14 Others (Option to Add more) N.A N.A. N.A. CHITECT Mraranjav B. Doifode (8.Arch, M.Arch) CA/2013/60839 Auranu Gajanaa Colory, n:aj" P. No.3 &4, Your's Faithfully, Signature &Name (IN BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Name: M/s Samarth Pride. Date: 06.10.2023