Ar. Doifode Dhananjay OURE (B.ARCH), (M.ARCH.) " ARCHITECTS "INTERIOR DESIGNERS PROJECT CONSULTANTS DEVA'sGROUP D°ARCHITECT'S, "GANRAJ" Plot no 3&4, Gajanan colony, Garkheda,Aurangabad. 491009 PHONE NO, - +91-937329423o, 9822294230, 8275326061, 9767455995 FORM 1 (see Regulation 3| DATE: ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 13.01.24 To The M/s Samarth Pride, Gut no. 38,Jalgaon Road, Sawangi, Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number] situated on the Plot bearing Sawangi Gut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P)to the South, Land of gut no. 36 to the East, Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. & Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/sSamarth Pride. Sir, IDhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for theSubject Real Estate Project proposed to be registered under RERA, beingof the Building / Phase of the Project, situated on the piot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010admeasuring Land Area =2850.00 sq.mts.& Proposed Built up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1 Following technical professionals are appointed by Owner/ Promoter : (1) Shri. Dhananjay B. Doifode.as L.S. / Architet; () Shri. Abhay Patil. as Structural Consultant. Based on Site Inspection, with respect to each of the Bulding/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51500045981under RERA is as per table Aherein below. The percentage of the work executed with respect to each of the major activity of the Building Wing and OverallPercentage of work done withrespect to each Building/Wing is detailed in the Table B. TABLE-A A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1. Excavation 100 % 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100 % 5 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 00 % windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other reguirements as may be required to complete project as per specifications in agreement of Sale. Anyother activities. B-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) (3) Excavation 100% 2 Basement's (if any) N.A. Podiums (if any) N.A. Plinth 100 % 5 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 100 % 7 Internal walls, lnternal Plaster, Floorings, ) doors and 00% windows within Flats/ Premises Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overheadand UndergroundWater Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work S Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100 % Basement's (if any) N.A. 3 Podiums (if any) N.A. 4. Plinth 100 % 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 00% windowS within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. D-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100 % 2. Basement's (if any) N.A 3 Podiums (if any) N.A. 4 Plinth 100% 5 01Stilt Floor N.A. 6 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, ) doors and 00 % wIndows within Flats/Premises Sanitary FittingsS within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. 11 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B respect of the Registered Common Areas (Internal and External Development Works) in Phase/Project Number Details Common areas and facilities Proposed Percentage Sr (Yes/No) of Actual No (3) Work (5) (1) (2) Done (As on date of the Certificate) (4) N.A. N.A. N.A. 1 Internal Roads & Footpaths 00 % BOREWELL 2 Water Supply yes Sewerage (Chamber, lines, Septic Tank, STP). Septik 00 % yes 3 Tank N.A. N.A N.A. 4 Storm Water Drains 00 % GARDEN Landscaping & Tree Planting YES 5. 00 % Along Road YES 6 Street Lighting N.A. N.A. N.A. 7 Community Buildings N.A. N.A. N.A. Treatment and disposal of sewage and sullage water. Solid WVaste management & Disposal N.A NA. N.A. 9 00 % 00 % 10 Water conservation / Rain water harvesting Upto Borewell N.A. N.A. N.A. 11 Energy management. N.A. N.A. N.A. 12 fire protection and lire Safety requirements METER 00 % N.A. 13 Electrical meter room, sub-station, receiving station. Others (Option to Add more) N.A. N.A. N.A. 14 Mr. Dhananjay B. Doifode (B.Arch, M.Arch) CA/2013/60839 Ganraj" P. No.3 &4, Gajanan Colony, Aurangabz. Your's Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Name: M/s Samarth Pride. Date:13.01.2024