Ar. Doifode Dhananjay (B.ARCH.), (M.ARCH.) LARE ARCHITECTS " INTERIOR DESIGNERS " PROJECT CONSULTANTS DEVA'sGROUP DARCHITECT'S, "GANRAJ" Plot no B&4, Gajanan colony, Garkheda,Aurangabad. 431009 PHONE NO, -+91- 9373294230, 98z2294230, 8275326061, 9767455995 FORM 1 DATE: (see Regulation 3| ARCHITECT'S CERTIFICATE (1o besubmtted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 10.04.24 To The M/s Samarth Pride, Gut no. 38,Jalgaon Road, Sawangi, Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project (RERA Registration Number] situated on the Plot bearing SawangiGut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P)to the South, Land of gut no. 36 to the East , Landof gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. & Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. Sir, IDhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for theSubiect Real Estate Project proposed to be registered under RERA, beingof the Building/ Phase of the Project. situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sq.mts.& Proposed Built up Area 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1 Following technical professionals are appointed by Owner / Promoter : (1) Shri. Dhananjay B. Doifode.as L.S. / Architect: (i) Shri. Abhay Patil. as Structural Consultant. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing ot the Real Estate Project ds regIstered vIde number P51500045981under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Wing and OverallPercentage of work done withrespect to each Building/Wing is detailed in the Table B. TABLE-A A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual VWork Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100 % 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100 % 01 Stilt Floor N.A. 5 6 02 Slabs of Super Structure 100% Internal walls, Internal Plaster, Floorings, 1) doors and 40 % 7 windows within Flats/Premises o Sanitary Fittings within the Flat/Premises 00% Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/wing. Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. 11 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. B-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/VWing of The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3 Excavation 100% 1 Basement's (if any) N.A 2. 3 Podiums (it any) N.A. Plnth 100 % 5 01 Stilt Floor N.A. 02 Slabs of Super Structure 100% 6. 7. Internal walls, Internal Plaster, Floorings, I) doors and 40% windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % Starcases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks 10 External plumbing andexternal plaster, elevation, 00 % completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. to Wall and all other requirements as may be required complete project as per specifications in agreement of Sale. Any other activities. C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100 % Basement's (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100 % 5 01 Stilt Floor N.A. 6 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 40 % windows within Flats/Premises o Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % 9 Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/wing. Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. 11 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. of prepared separately for each Layout building/Wing D-Type Building (SAMARTH PRIDE) (To be The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this Certificate) (1) (3) 100% 1 Excavation N.A. 2 Basement's (if any) N.A. 3 Podiums (if any) 100 % 4 Plinth N.A. 5 01 Stilt Floor 100 % 6 02 Slabs of Super Structure I) doors and 40 % 7. Internal walls, Internal Plaster, Floorings, windowS within Flats/Premises 00% Sanitary Fittings within the Flat/Premises 00 % each Floor level Staircases. lifts' Wells and Lobbies at Overhead and Underground Water Tanks 00% 10 External plumbing and external plaster, elevation, the completion of terraces with waterproofing of Building/wing. Fitting Fittings and N.A. 11 Installation of Lifts. water pumps, Fire fittings, mechanical Equipment as per CFO NOC, Electrical environment/CRZ equipment, compliance to conditions of plinth protection, NOC. Finishing to entrance lobby/s. Compound Building/Wing. paving of areas appurtenant to as may be required to Wall and all other requirements agreement of Sale. specifications in complete project as per Any other activities.