Ar. Doifode Dhananjay DEVA's GROUP SOUARE (B.ARCH.),(M.ARCH) "ARCHITECTS " INTERIOR DESIGNERS PROJECT CONSULTANTS D°ARCHITECTS, "GANRAJ" Plot no &4, Gajanancolony, Garkheda,Aurangabad. 431009 PHONE NO. -+91-9373294230, 9822294230, 8275326061, 97674ss995 FORM 1 DATE: Isee Regulation 3| ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 09.10.24 To The M/s Samarth Pride, Gut no.-38, Jalgaon Road, Sawangi., Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number) situated on the Plot bearing Sawangi Gut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P) to the South, Land of gut no. 36 to the East , Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. & Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. Sir, Dhananjay B. Doifode have undertaken asignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, beingof the Building / Phase of the Project, situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad vilage Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area -2850.00 sq.mts.&, Proposed Built up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1 Following technical professionals are appointed by Owner / Promoter: (1)Shri. Dhananjay B. Doifode.as L.S./Architect; (ii) Shri. Abhay Patil. as Structural Consutant. of the Building/Wing of the aforesaid Real Based on Site Inspection, with respect to each certificate, the Percentage of Work done for each of Estate Project, Icertity that as on the date of this registered vide number P51500045981 under RERA is the building/Wing of the Real Estate Project as of the major as per table A herein below. The percentage of the work executed with respect tO each Building/Wing of work done withrespect to each activity ot the Building Wing and OverallPercentage is detailed in the Table B. TABLE-A of prepared separately for each Layout building/Wing A-Type Building (SAMARTH PRIDE) (To be The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 100 % 1 EXcavation N.A. 2 Basement's (if any) N.A. 3 Podiums (if any) 100 % 4 Plinth 01 Stilt Floor N.A. 5. 100 % 6 02 Slabs of Super Structure 80% doors and 7. Internal walls, Internal Plaster, Floorings, I) windowS within Flats/Premises Flat/Premises 00 % o Sanitary Fittings within the 00% each Floor level Staircases. lifts' Wells and Lobbies at Overhead and Underground Water Tanks elevation, 00 % 10 External plumbing and external plaster, waterproofing of the completion of terraces with Building/wing. Fittings and N.A. 11 Installation of Lifts. water pumps, Fire Fitting mechanical fittings, Equipment as per CFO NOC, Electrical environment/CRZ of equipment, conpliance to conditions to entrance lobby/s. plinth protection, NOC. Finishing Compound Building/Wing. paving of areas appurtenant to required to may be Wall and all other requirements as agreement of complete project as per specifications in Sale. Any other activities. separately for each Layout building/Wing of B-Type Building (SAMARTH PRIDE) (To be prepared The Project) Percentage of ActualWork Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) 100 % 1. Excavation Basement's (if any) N.A. 2 N.A. 3 Podiums (if any) 100% 4 Plinth N.A. 5. 01 Stilt Floor 100 % 6. 02 Slabs of Super Structure Floorings, ) doors and 80% 7 Internal walls, Internal Plaster, windows within Flats/Premises 00 % Sanitary Fittings within the Flat/Premises each Floor level 00 % Staircases. lifts' Wells and Lobbies at Overhead and Underground Water Tanks 00% 10 External plumbing and external plaster, elevation, of the completion of terraces with waterproofing Building/wing. Fittings and N.A. 11 Installation of Lifts. water pumps, Fire Fitting fittings, mechanical Equipment as per CFO NOC, Electrical environment/CRZ equipment, compliance to conditions of lobby/s. plinth protection, NOC. Finishing to entrance Building/Wing. Compound paving of areas appurtenant to as may be required to Wall and all other requirements specifications in agreement of Sale complete project as per Anyother activities building/Wing of C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout The Project) Percentage of Actual Work S Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100% Basement's (if any) N.A. 2 N.A. 3 Podiums (if any) 100% Plinth 01 Stilt Floor N.A. 5 02Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings, I) doors and 80 % 7. windows within Flats/Premises Sanitary Fittings within the Flat/ Premises 00 % level00 % Staircases. lifts' Wells and Lobbies at each Floor Overhead and Underground Water Tanks 00 % 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. 11 mechanical Equipment as per CFO NOC, Electrical fittings, environment/CRZ equipment, compliance to conditions of protection, NOC. Finishing to entrance lobby/s. plinth Compound paving of areas appurtenant to Building/Wing. required to Wall and all other requirements as may be agreement of Sale complete project as per specifications in Any other activities. Layout building/Wing of D-Type Building (SAMARTH PRIDE) (To be prepared separately for each The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 100% 1 Excavation N.A. 2 Basement's (if any) N.A. 3 Podiums (if any) 100% Plinth N.A. 5 01 Stilt Floor 100% 6. 02 Slabs of Super Structure and 80% 7. Internal walls, Internal Plaster, Floorings, ) doors windowS within Flats/Premises 00 % Sanitary Fittings within the Flat/Premises Floor level 00 % Staircases. Iifts' Wells and Lobbies at each Overhead and Underground Water Tanks elevation, 00 % 10 External plumbing and external plaster, completionof terraces with waterproofing of the Building/wing. NA. Fittings and 11 Installation of Lifts. water pumps, Fire Fitting Electrical fittings, mechanical Equipment as per CFO NOC, environment/CRZ equipment, compliance to conditions of plinth protection, NOC. Finishing to entrance lobby/s. Building/Wing. Compound paving of areas appurtenant to may be required to Wall and all other reguirements as agreement of Sale. complete project as per specifications in Anyother activities. TABLE-B the Registered Common Areas (Internal and External Development Works) in respect of Phase/Project Number Percentage Details Common areas and facilities Proposed of Actual No (Yes/No) (5) (3) Work (1) (2) Done (As on date of the Certificate) (4) NA. N.A. Internal Roads & Footpaths N.A. BOREWELL 1 yes 00 % Water Supply 00% yes Septik Sewerage (Chamber lnes, Septic Tank, STP). Tank N.A. N.A. Storm Water Drains N.A. 4 00 % GARDEN Landscaping &Tree Planting YES 5 00 % Along Road YES 6 Street Lighting N.A. N.A. N.A. 7 Community Buildings N.A. N.A. sullage N.A. Treatment and disposal of sewage and water. N.A. N.A. N.A. 9 Solid Waste management & Disposal 00% 00% Water conservation / Rain water harvesting Upto 10 Borewell N.A. N.A. N.A. 11 Energy management. N.A. requirements N.A. N.A. 12 fire protection and lire Safety 00 % N.A. sub-station, receiving METER Electrical meter room, 13 station. N.A. N.A. Others (Option to Add more) N.A. 14 Mr. Dhananjay B. Doifode (B.Arch, M.Arch) CA/2013/60839 Ganraj P.No. 3&4, Gajanan Colony, Aurangabe: Your's Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by Signature of Promoter Name: M/s Samarth Pride. Date:09.10.2024