Ar. Doifode Dhananjay OUAR ARE (B.ARCH.), (M.ARCH) " ARCHITECTS " INTERIOR DESIGNERS " PROJECT CONSULTANTS DEVA's GROUP DARCHITECT'S, "GANRAJ" Plot no 3&4,Gajanan colony, Garkheda,Aurangabad. 431009 PHONE NO. - +91 -9373294230, 9822294230, 8275326O6, 9767455995 DATE FORM 1 [see Regulation 3| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration ofOngoing Project and for withdrawal of Money from Designated Account) Date:08.01.25 To The M/s Samarth Pride, Gut no.-38, Jalgaon Road, Sawangi, Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project (RERA Registration Number] situated on the Plot bearing SawangiGut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North , Land of gut no.38 (P) to the South, Land of gut no. 36 to the East, and of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sq.mts. &Proposed Built-up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. Sir, IDhananjay B. Doifode have undertaken ass1gnment f certifying Estimated Cost for theSubject Real Estate Project proposed to be registered under RERA, beingof the Building / Phase of the Project, situated on the plot bearing Sawangi Gut no.-38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sq.mts.& Proposed Built up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1. Following technical professionals are appointed by Owner / Promoter : (1) Shri. Dhananjay B. Doifode.as L.S. /Architect; (i) Shri. Abhay Patil. as Structural Consultant. aforesaid Real Based on Site Inspection, with respect to each of the Building/Wing of the Work done for each of Estate Project, Icertify that as on the date of this certificate, the Percentage of P51500045981under RERA is the building/Wing of the Real Estate Project as registered vide number each of the major as per table Aherein below. The percentage of the work executed with respect to each Building/Wing activity of the Building Wing and Overal|Percentage of work done withrespect to is detailed in the Table B. TABLE-A building/Wing of A-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout The Project) Percentage of ActualWork Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) Excavation 100 % 1 Basement's (if any) NA. 2 3 Podiums (if any) N.A. 100 % 4 Plinth 01 Stilt Floor N.A. 5 02 Slabs of Super Structure 100 % 6 7 Internal walls, Internal Plaster, Floorings, I) doors and 100% windowS within Flats/ Premises Sanitary Fittings within the Flat/Premises 50 % 100 % Staircases. lifts' Wells and Lobbies at each Floor level Overhead and UndergroundWater Tanks External plumbing and external plaster, elevation, 50% 10 completion of terraces with waterproofing of the Building/wing. and NA. 11 Installation of Lifts. water pumps, Fire Fitting Fittings mechanical Equipment as per CFO NOC, Electrical fittings, environment/CRZ equipment, compliance to conditions of protection, NOC. Finishing to entrance lobby/s. plinth appurtenant to Building/Wing. Compound paving of areas Wall and all other regquirements as may be required to agreement ot Complete project as per specifications in Sale. Any other activities. B-Type Bulding (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks / Activity Done No (2) (As on date of this (1) Certificate) (3) 1 Excavation 100 % 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100% 5 01 Stilt Floor N.A. 02 Slabs of Super Structure 100 % 7 Internal walls, Internal Plaster, Floorings, I) doors and 100 % windowS within Flats/Premises Sanitary Fittings within the Flat/Premises 50% Staircases. lifts' Wells and Lobbies at each Floor level 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 50% completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. Equipment as per CF0 NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. prepared separately for each Layout building/Wing of C-Type Building (SAMARTH PRIDE) (To be The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this Certificate) (1) (3) 100% tXcavation N.A. 2 Basement's (if any) N.A. 3 Podiums (if any) 100% Plinth NA. 5 01 Stilt Floor 100 % 6 02 Slabs of Super Structure Floorings, ) doorS and 100 % 7 Internal walls, Internal Plaster, windows within Flats/Premises 50 % Sanitary Fittings within the Flat/Premises 100 % each Floor level Staircases. lifts' Wells and Lobbies at Overhead andUnderground Water Tanks 50% elevation, 10 External plumbing and external plaster, waterproofing of the completion of terraces with Building/wing. N.A. Fitting Fittings and 11 Installation of Lifts. water pumps, Fire mechanical Electrical fittings, Equipment as per CFO NOC, environment/CRZ of equipment, compliance to conditions plinth protection, NOC. Finishing to entrance lobby/s. Building/Wing. Compound paving of areas appurtenant to required to as may be Wall and all other requirements of Sale. complete project as per specifications in agreement Any other activities. building/Wing of prepared separately for each Layout D-Type Building (SAMARTH PRIDE) (To be The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this Certificate) (1) (3) 100 % 1 Excavation N.A. 2 Basement's (if any) N.A. 3 Podiums (if any) 100 % Plinth N.A. 5 01 Stilt Floor 100% 6 02 Slabs of Super Structure ) doors and 100 % 7 Internal walls, Internal Plaster, Floorings, windows within Flats/Premises 50 % Sanitary Fittings within the Flat/Premises 100 % each Floor level 9 Staircases. lifts' Wells and Lobbies at Overhead and Underground Water Tanks elevation, 50% 10 External plumbing and external plaster, of the completion of terraces with waterproofing Building/wing. Fittings and N.A. 11 Installation of Lifts. water pumps, Fire Fitting mechanical fittings, Equipment as per CFO NOC, Electrical environment/CRZ equipment, compliance to conditions of plinth protection, NOC. Finishing to entrance lobby/s. Compound Building/Wing. paving of areas appurtenant to be required to may Wall and all other requirements as agreement of Sale. complete project as per specifications in Any other activities. TABLE-B Areas (Internal and External Development Works) in respect of the Registered Common Phase/Project Number Percentage Details Common areas and facilities Proposed Sr of Actual (Yes/No) No Work (5) (3) (1) (2) Done (As on date of the Certificate) (4) N.A. N.A. Internal Roads & Footpaths N.A. 1. BOREWELL yes 00% Water Supply 00% yes Sewerage (Chamber, lines, Septic Tank, STP) Septik 3. Tank N.A. N.A. Storm Water Drains N.A. 4. 00% GARDEN Landscaping & Tree Planting YES 5. 00% Along Road YES 6 Street Lighting N.A. N.A. N.A. 7. Community Buildings N.A. sullage N.A. N.A. Treatmnent and disposal of sewage and water. N.A. NA. N.A. Solid Waste management & Disposal 00 % 00 % harvesting Upto 10 Water conservation / Rain water Borewell N.A. N.A. N.A. Energy management. 11 requirements N.A. N.A. N.A. 12 fire protection and lire Safety 00 % N.A. room, sub-station, receiving METER 13 Electrical meter Station N.A N.A. N.A. 14 Others (Option to Add more) ARCHITECT Ar Dhananjay B. Doifode (B.Arch, M.Arch) CA/2013/60839 "Genraj" P. No.3 &4, Gajanan Colony, Aurangab Your's Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No. CA/2013/60839) Agreed and Accepted by Signature of Promoter Name. M/s Samarth Pride. Date: 08.01.2025