Ar. Doifode Dhananjay sOUARE DEVA's GROUP (B.ARCH.), (M.ARCH) " ARCHITECTS " INTERIOR DESIGNERS " PROJECT CONSULTANTS D°ARCHITECTS, "GANRAJ" Plot no &4, Gajanan colony, Garkheda,Aurangabad. 431009 PHONE NO,- +9)-9373294230, 9822294230, 8275325O61, 9767455995 FORM 1 DATE: (see Regulation 3| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registrationof Ongoing Project and for withdrawal of Money from Designated Account) Date: 03.07.24 To The M/s Samarth Pride, Gut no.-38, Jalgaon Road, Sawangi, Aurangabad. Maharashtra. Subject: Certificate of Percentage of Completion of Construction Work of "SAMARTH PRIDE" Building's of the Project [RERA Registration Number] situated on the Plot bearing SawangiGut no.-38(P), demarcated by its boundaries (latitude and longitude of the end points) Land of gut no. 38 (P) &9.00 M. WIDE Approch Road to the North, Land of gut no. 38 (P) to the South, Land of gut no. 36 to the East, Land of gut no. 30 to the West of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area = 2850.00 sq.mts. &Proposed Built-up Area= 2091.74 sV.mt. area being developed by M/s Samarth Pride. Sir, IDhananjay B. Doifode have undertaken assignment of certifying Estimated Cost for theSubject Real Estate Projet proposed to be registered under RERA, beingof the Building / Phase of the Project, situated on the plot bearing Sawangi Gut no.38(P), of Division Aurangabad village Sawangi taluka Aurangabad District Aurangabad PIN 431010 admeasuring Land Area =2850.00 sq.mts.& Proposed Built up Area= 2091.74 sq.mt. area being developed by M/s Samarth Pride. 1 Following technicalprofessionals are appointed byOwner /Promoter (1) Shri.Dhananjay B. Doifode.as L.S. / Architect; () Shri. Abhay Patil. as Structural Consultant. the Building/Wing of the aforesaid Real Based on Site Inspection, with respect to each of certificate, the Percentage of Work done for each of Estate Project, Icertify that as on the date of this registered vide number P51500045981under RERA is the building/Wing of the Real Estate Project as the major of the work executed with respect to each of as per table A herein below. The percentage work done withrespect to each Building/Wing activityof the Building Wing and Overall Percentage of is detailed in the lable B. TABLE-A separately for each Layout building/VWing of A-Type Building (SAMARTH PRIDE) (To be prepared The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3) 100 % 1 Excavation N.A. 2 Basement's (if any) N.A. 3. Podiums (if any) 100 % 4. Plinth N.A. 01 Stilt Floor 02 Slabs of Super Structure 100% 6 I) doors and 60% 7 Internal walls, Internal Plaster, Floorings, windows within Flats/Premises 00 % Sanitary Fittings within the Flat/Premises level 00% Staircases. lifts' Wells and Lobbies at each Floor Overhead and Underground Water Tanks elevation, 00 % 10 Externalplumbing and external plaster, of the completion of terraces with waterproofing Building/wing. Fitting Fittings and N.A. 11 Installation of Lifts. water pumps, Fire mechanical Electrical fittings, Equipment as per CFO NOC, environment/CRZ of equipment, compliance to conditions plinth protection, NOC. Finishing to entrance lobby/s. Compound Building/Wing. paving of areas appurtenant to requirered to be Wall and all other requirements as may agreement of specifications n complete project as per Sale. Any other activities. separately for each Layout building/Wing of B-Type Building (SAMARTH PRIDE) (To be prepared The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this Certificate) (1) (3) 100 % 1 Excavation N.A. Basement's of any) N.A. 3 Podiums (if any) 100% 4 Plinth N.A. 5 01 Stilt Floor 100 % 6. 02 Slabs of Super Structure Floorings, ) doors and 60 % 7 Internal walls, Internal Plaster, windowS within Flats/Premises 00 % Sanitary Fittings within the Flat/Premises each Floor level 00 % Staircases. lifts' Wells and Lobbies at Overheadand Underground Water Tanks 00 % elevation, 10 External plumbing and external plaster, waterproofing of the completion of terraces with Building/wing. Fittings and N.A. 11 Installation of Lifts. water pumps, Fire Fitting mechanical fittings, Equipment as per CFO NOC, EIlectrical environment/CRZ equipment, compliance to conditions of lobby/s. plinth protection, NOC. Finishing to entrance Building/Wing. Compound paving of areas appurtenant to to as may be required Wall and all other requirements specifications in agreement of Sale. complete project as per Anyother activities. C-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing of The Project) Percentage of Actual Work Sr Tasks/ Activity Done No (2) (As on date of this (1) Certificate) (3 100 % 1 Excavation 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. Plinth 100 % 4 01 Stilt Floor N.A 5 100 % 6. 02 Slabs of Super Structure Intenal walls, Internal Plaster, Floorings, ) doors and 60% 7 windows within Flats/Premises 00 % 8 Sanitary Fittings within the Flat/Premises 9 Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 00 % 10 completion of terraces with waterproofing of the Building/wing. Installation of Lifts. water pumps, Fire Fitting Fittings and N.A. 11 Equipment as per CFO NOC, Electrical fittings, mechanical environment/CRZ equipment, compliance to conditions of protection, NOC. Finishing to entrance lobby/s. plinth Building/Wing. Compound paving of areas appurtenant to required to Wall and all other requirements as may be specifications in agreement of Sale. complete project as per Anyother activities. D-Type Building (SAMARTH PRIDE) (To be prepared separately for each Layout building/Wing or The Project) Sr Tasks / Activity Percentage of Actual Work No Done (2) (As on date of this (1) Certificate) (3) txcavation 100 % 2 Basement's (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 100 % 5 01 Stilt Floor N.A. 02 Slabs of Super Structure 100 % 7. Internal walls, Internal Plaster, Floorings I) doors and 60% windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00 % Staircases. lifts' Wells and Lobbies at each Floor level 00 % Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 00 % 10 completion of terraces with waterproofing of the Building/wing. N.A. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, EIlectrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, Compound paving of areas appurtenant to Building/Wing. Wall and all other requirements as may be required to of Sale. complete project as per specifications in agreement Any other activities. of the Registered TABLE-B Development Works) in respect Common Areas (Internal and External Details 3 Phase/Project Number Common areas and facilities Proposed Percentage of Actual Sr (Yes/No) Work (5) No (3) (2) Done (1) (As on date of the Certificate) (4) N.A. N.A. N.A. BOREWELL 1 Internal Roads & Footpaths 00 % yes yes 2 Water Supply Septik 00% Septic Tank, STP). 3 Sewerage (Chamber, lines, Tank N.A. N.A. N.A. GARDEN Storm Water Drains 00 % YES Along Road 5 Landscaping &Tree Planting YES 00 % Street Lighting N.A. N.A. N.A. N.A. Community Buildings N.A. N.A. 7 sewage and sullage Treatment and disposal of 8 N.A. water. N.A. N.A management & Disposal 00 % 00 % Solid Waste Upto Rain water harvesting Water Conservation/ Borewell N.A. N.A. N.A. Energy management. N.A. N.A. 11 N.A. Safety requirements N.A. 12 fire protection andlire sub-station, receiving METER 00 % 13 Electrical meter room, N.A. N.A. station. N.A. more) 14 Others (Option to Add ACHITECT Mr. Dhananjay B. Doifode (B.Arch, M.Arch) CA/2013/60839 "Ganraj" P.No.3 &4,Gajanan Colony, Aurangaba Your's Faithfully, LETTERS) ofLS/ Architect Signature & Name (INBLOCK (License No. CA/2013/60839) Agreed and Accepted by: Signature of Promoter Pride. Name:M/s Samarth Date:03.07.2024