LODHI SAJJAD ARcHrrEcr FORM 1 [see Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE:2alOLl2025 To AADESHUIAR COI{STRUCTION Aadinath Chambers, Plot No. 31 B & C, Sector F1, N4, CIDCO, Aurangabad - 431003. Subject: Certiflcate of Percentage of Completion of Construction Work of SAI SUIU./AN PRIDE having Maha RERA Registration Number P515OOO477O5 being developed by Aadeshwar Construction for the period ended 30 / 09 /2O24. Sir, I/ We SalJad A.K. Lodht have undertaken assignment as Architect /Licensed Surveyor of cerlifying Percentage of Completion of Construction Work of having Maha RERA Registratjon Number P515OOO477O5 being developed by Aadeshwar Construction for tJre period ended 30 /O9 I 2024. Based on Site inspection with respect to Layout / each of the aforesaid Rea-1 Estate Project, I certify that as on ttre date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Building SAI SUMAN PRIDE (To be prepared separately for each Layout buildin of The ct Sr Tasks / Activtty Perceltage of Actual No t2t Work Done (1) (As on date of this Certilicate) (31 1 Excavation 'too.7" 2nd Floor, Above City Bakels, SA'JAD A.r. TODIII lvlobile : +91 99605076M Near Police Commissioners Office. E-mail : architectsajjadlodhi@yahoo.co-in Mill Corner Signal, Aurangabad-43100'1. cA/0513799a ' architectsajjadlodhil23@gmail.com 2 Basement's (if any) LOOo/o 3. Podiums (if any) Oo/o 4. Plinth lOOo/o 5. Stilt Floor Oo/o 6 Slabs of Super Structure LOO/" 7 Internal walls, Internal Plaster, Floorings, I) doors l0Oo/o and windows within Flats / Premises 8 Sani Fittings within the Flat/Premises IOOYo 9 Staircases. lifts' Wells and Lobbies at each Floor LOOY" leve1 Overhead arrd Underground Water Tanks 10 External plumbing and external plaster, elevation, LOOY" completion of terraces urith waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting LOOo/o Fittings and Equipment as per CFO NOC, Electrical frttings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Buiiding/Wing. Compound Wall and all other requirements as may be required to complete project as per specilications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Worksl in respect of the Re red Phase/ ect Number Sr Common areas and facilitles Proposed Percentage Details No (Yes/No) of Actual (U tzt t3t lllork Done (st (As on date of the Certllicate) (41 i Internal Roads & Foo tpaths No Oo/" 2. Water Supply Yes LOOo/o 3 Sewerage (Chamber, lines, Septic Tank, Yes LOOYo STP). 4. Storm Water Drains No Oo/o Landsc & Tree Plantin No Oo/o 6 Street Lishtine No OYo 7 Community Buil No OYo 8 Treatment and disposal of sewage and No OYo sullage water. 9 Solid Waste management & Disposal No Oo/o 10 Water conservation / Rain water YES LOOo/o harvesting sArrADA.t(. toDEI cNA5B7oe4 11 Ener$/ management. No Oo/o 72 fire protection and lire Safety No OYo requirements 13 Electrical meter room, sub-station, No Oo/o fecel station. 74 Others (Option to Add more) Yes LOOY' Compound lllall and Gate Your's Faithfully, AR. Sajjad A.K. Lodhi (License No. ..CA/05/3709a) Agreed and Accepted by: lI/S AADE$llUt'AR COidSTRUCTICII Partfler Signature of Promoter For Aadeshwar Construction Date:28/Ol/2025 Place : Aurangabad