AnneKure C FORM 2A (See MahaRERA Order No. 5 of 2018) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 14-10-2025 To, AB Developers, Raaj Group, Office No. 2, Muley Tapadia Complex,Jalna Road, Aurangabad QUALITY ASSURANCE CERTIFICATE (Certificate No 13 for the Quarter Ending Sep 25) Certificate for quality materials used andquality of Construction & workmanship Subject: for the work of Anandam Residency having Maha RERA registration Number P51500033671 being developed by A B Developers. Sir, |/We Prasad Kshirsagar have undertaken an assignment of supervision of this Real Estate Project. OUR RESPONSIBILITY | / We are responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. INPUT MATERIALS, FIXTURES & FITTINGS WWe hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fittings, etc and amenities to be provided by the Promoter in the said project, building and the Apartment as are as per specifications mentioned in Annexure 'E, of Agreement to Sale. mentioned in Agreement of Sale, the For those items, where no specification have been relevant BIS Standard / IS / National Materials, Fixtures and Fittings used conform to the Building Codes or as per Industry Standards. WORKMANSHIP [2 /We hereby certify that the work has been carried out under our supervision. We further certify up to the mark and the work has been that workmanship and quality is satisfactory and acceptable within the permissible limits of deviation as per relevant code of practice. STRUCTURAL ENGINEER [31 Kharkhane having License No Reg. No. Promoters have engaged structural engineer Mr. NG CAT -|474 having Cell No 9823028081. done under his supervision. The The structural design of buildings in this Project has been 10262:2009 or as per other formwork and concrete mix design has been done as per IS certificates for STABILITY and relevant codes as applicable. His periodic checks and SAFETY have been kept on record. PRESERVATION OF RECORDS [5] prescribed format and will Record of all test results of this Project have been properly kept in the be preserved at least up to the Defect Liability Period or for the period as required by any other provision of Law. Please specify deviation in quality of materials or any other item of work which were not conforming to the specifications as mentioned in Agreement of Sale. Yours faithfully, Signature of Site Supervisor Name: Ravi Chavan Qualification: 12th OPERS 4IS AB License No (if any): Mobile No: 8530803144 Place: Aurangabad PARTNER Signature of Promoter Name: A B Developers Date: 14-10-2025