Annexure - B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:09/07/2025 To, M/s. AB Developers, Raaj Group, Office No.2,First Floor, Mulay Tapadiya Complex, Jalna Road, Near Mondha Naka,Aurangabad- 431001 Subject: Certificate of Cost Incurred for Development of Anandam Residency having MahaRERA Registration Number P51500033671 (Only applicable after Project Registration) being Developed by A B Developers. Sir, 1. |/We Mahavir P. Lalwani have undertaken assignment of Certifying Estimated Cost for Anandam Residency, having MahaRERA Registration Number (Only applicable after Project Registration) being Developed by AB Developers. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & Row house building proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Qur estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by Rs. 20,70,00,000 Quantity Surveyor" appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis givento us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 20,70,00,000 (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments &proportionate completion of internal &external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) /Wing(s) Development from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The EstimatedCost incurred till date is calculates to Rs. 12,90,65,000 (Total of Table A & B). The Amount of Estimated Cost Incurred is. calculated. on.the. basis. of.input materials /services used & unit cost of these items. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale. of the aforesaid Project is estimated at Rs. 5,59,35,000 (Total of Table A & B). 6. | Certify that the cost of Civil, MEP &Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building/ Wing / Development bearing Number Apartment &s Row House or called (to be prepared separately of each Building / Wing Development of the Real Estate Project) Particulars Amount (in Rs.) No. 1 Total Estimated Cost of Building/Wing /Layout / 18,50,00,000 Piotted Development as on date of Registration is 2 Cost incurred as on date of Certificate 12,90,65,000 3 Work Done in Percentage (as Percentage of 69.76% Estimated Cost) 4 Balance Cost to be incurred ** ((based on 5,59,35,000 Estimated Cost) 5 Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) TABLE - B Internal & External Development Works in respect of Registered Phase S. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of Internal & External 2,20,00,000 Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate 2,20,00,000 3 Work Done in Percentage (as Percentage of 100% Estimated Cost) 4 Balance Cost to be incurred ** (based on Estimated Cost) 5. Cost incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) Mhavir P. Lalvant Architest/Consu!tant Enginee R+ V). E127191 M a o Yours faithfully, Engineer Signature & Name with Stannp of Mahavir P Lalwani Section 2(u) of the Act) Holder or equivalent as per [Not less than Bachelor's Degree Local Authority License Number (if applicable) Agreed & Accepted iM/S ABDEVELOPÉRS Kour Signature of Pr&rASNER Name: À B Developers Ajmera Rameshwar K. Bharuka & Kaushal S. Date: 09/07/2025 Note: drawings Registered Real Estate Project as per 1. The scope of work is to complete mentioned in the Agreement to approved from time to time as per specifications Sale. done by an by the office of Engineer or can be 2. (*) Quantity Survey can be done Certificate of Quantity Calculated, can be independent Quantity Surveyor, who's quantity surveyor being appointed relied up on by Engineer. In case of independentat the place marked (*) & in case mentioned by Developer, the name has to be Engineer, the name of person in the office quantity are being calculated by office of mentioned at the quantity calculated should be of Engineer, who is responsible for the place marked ("). Balance Cost to be incurred (4) may vary from difference between Total 3. (**) due to deviation in quantity required / Estimated Cost (1)& actual Cost incurred (2) escalation of cost etc. As this is an Estimated Cost any deviation quantity required cost Project will result in an amendment of the for the Development of Real Estate incurred / to be incurred. are indicative & not exhaustive 4. Allcomponents of work with specifications deviations / qualifications. Example: Any deviation in 5. Please specify if there are any Agreement of Sale. input material used from specifications in TABLE C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. Listof Extra l Additional / Deleted ltems Amount (in Rs.) 1. 2.