ffi AR. ROHIT RAKA I Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawal of Money from Designated Account) oaret L2-04-2023 To, lvlarathwada Constructions pvt Ltd, 50, Hari Prasad Complex, Dashmeshnagar, Osmanpura Aurangabad Subject:Certificate of percentage of Completion of Construction Work ofGREEN SPACE RES|DENCY PROJECT 1 B BLOCK having MahaRERA Registration Number P51500045751being Developed by lvlarathwada Constructions h^ Ltd. Sir, I, ArchRohit Rakahave undertaken assignment as Architect / Licensed surveyor of certifying pcrcentage of completion of construction work of GREEN sPAcE REstDENcy pRoJECT 1 B BLOCK havin! MahaRERA Registration Number p5r50004s761 being Deveroped pw by Marathwada constructions Ltd, Based on the site rnspection, with respect to'the Layout each Building,/wing / of the aforesaid Rear Estate Project, I certify that as on date of this certificate, the percentage of Work Done for each of the Building/wing of the Real Estate project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table-8. TABLE-A For BuildingcREEN SPACE RES|DENCY PROJECT 1 B BLOCK Row House L to 3 s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) l2l (3) 1. Excavation o0% 2. Basements (if any) 00% 3. Podiums (if any) o0% 4. Plinth o00/o 5. Stilt Floor 0Oo/o 6. Slab of Super Structure 00% 7. lnternal Walls, lnternal Plaster, Floorings, Doors, windowi 00o/o AR. ROHIT RAKA Staircases, Lift Wells & Lobbies at each Floor Level Overhead and U nderground Water Tanks External Plumbing & External Plaster, Elevation, Completion with waterproofins of the Buildi lnstallation of Lifts, Water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, plinth protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, TABTE.A For Building G REEN SPACE RES|DENCY PROJECT 1 B BLOCK Row House 4 to 6 s. Tasks / Activity Percentage of Actual Work No, Done (As on date of the Certificatel (1) l2l 1. Excavation too% 2. Basements (if any) 00% 3. Podiums (if any) 00% 4. P lint h LOOo/o 5. Stilt Floor o0% 6. Slab of Super Structure o0% 7. lnternal Walls, lnternal plaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitary Fittings within Flats / premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10. External Plumbing & External plaster, Elevation, Completion 00% of Terraces, with waterproofing of the Building / Wing 1,1,. lnstallation of Lifts, Water pumps, Fire Fighting Fittings and 00% Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, plinth protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Mongol Koryoloy. 70, suVARNAtttit,ttousr, Dqshmeghno#fg Vlshworoop (0240)23587 59' I 5452w?22 Emoll; rokqsdcslgnsiudle@gmqll'c;rliilrel: xlF AR. ROHIT RAK I TABTE-A For Buildint GREEN SPACE RES|DENCY PROJECT 1 B BLOCK Row House 7 to 9 s. Tasks / Activity Percentage of Actual Work No, Done (As on date of the Certificate) (1) (21 (3) 1. Excavation 700% 2. Basements (if any) 00% 3. Podiums (if any) jOVo 4. Plinth 100% 5. Stilt Floor to0% 6. Slab of Super Structure 700% 7. lnternal Walls, lnternal Plaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitary Fittings within Flats / premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead and U nderground Water Tanks 10. External Plumbing & External plaster, Elevation, Completion o0% of Terraces, with waterproofing of the Building / Wing 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, plinth protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABTE.E common Areas (tnternal & External Development works) in respect ofthe GREEN spAcE REstDENcy PROJECT 1 B BLOCK S. No. Common Areas & Facilities Proposed Percentage of actual Details (Yes / No) Work Done (As on date of Certlficate) (1) (2) (3) (4) (s) 1. lnternal Roads & Footpaths Yes 30% lnternal Project Road 2. Water Supply YES 00% FROM BOREWELL 3. Sewerage (Chamber, Lines, Septic YES 00% DRAINAGE LINE Tank, STP) TItL CORPORATION AR. ROHIT RAKA LINE 4. Strom Water Drains NO NO NO 5. Landscaping & Tree Planting NO NO NO 6. Street Lighting NO N.A. N.A. 7. Community Buildings NO N.A. N,A. Treatment & Disposal of Sewage and NO N.A. N.A. Sullage Water 9. Solid Waste Management & Disposal NO N,A. N.A. 10. Water Conservation / Rain Water YES oo% RAIN WATER Harvesting HARVESTING AS PER NORMS 11. Energy Management YES 000/. SOLAR SYSTEM FOR COMMON LIGHTS L2. Fire Protection & Fire Safety YE5 00% AS PER FIRE requirements NORMS 13. Electrical Meter Room, Sub-Station, YES 00% ELECTRIC METER Receiving Station ROOM L4. Others (Option to Add more) + Yours faithfully, Signature & Name Architect Arch Rohit Raka License Number Agreed & Accepted by: Signature of Name:M/s. DatetL2-O4-202? 70, SUVARNANEET HOUSE, Doshmeshnogori neqr Vlshworoop Mongol Koryoloy, Emoll: rokosdeslgnsludlo@gmoll'com, Iel: (0240)23587 5j, 9 545208222