MANOJ KAIA AND ASSOCIATES ARCH ITECTS AND MASTERPI.AN N ERS K FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: - 14-01-2023 To, The Trilok Buildcon, Room No. 3, Resham Lawns, Gut No. 141 Part, Satara, Beed Bypass, Chhatrapati Sambhajinagar. Subject: Certificate of Percentage of Completion of Construction Work of Trilok Vista having MahaRERA Registration Number P515OOO45751 being developed by M/s Trilok Buildcon. Sir, I have undertaken assignment as Architect of Certifying Percentage of Completion of Construction Work of Trilok Vista having MahaRERA Registration Number P515OOO45751 being developed by M/s Trilok Buildcon. , Based on the Site Inspection, with respect to the Layout I each Building/Wing of the aforesaid Rea-l Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Date: L4lOtl2O23 RegNo: C,Al96l L9597 Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9537005781 or Mail- manoj.kala@yahoo.co.in MANOJ KALA AND ASSOCIATES ARCHITECTS AND MASTERPIANNERS K TABLE-A-1 Row House SectorA-1 To 12 s. Tasks / Activity Percentage of Actual No. Work Done lAs on date of the Certilicatel (U l2l (3t 1. Excavation lOOo/o 2. Basements and Plinth O"/" 3. Podiums (if any) ooh 4. Stilt Floor O"/" 5. Slab of Super Structure Oo/o 6. Internal Walls, Internal Plaster, Floorings, Doors, Oo/o windows within Flats / Premises Sanitary Fittings within Flats / Premises Oo/o 8. Staircases, Lift Wells & Lobbies at each Floor Level o"h Overhead and Underground Water Tanks 9. External Plumbing & External Plaster, Elevation, Oo/o Completion of Terraces, with waterproofing of the Buildine / Wine 10. Installation of Lifts, Water Pumps, Fire Fighting Oo/o Fittings and Equipment's as per CFO NOC, t Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and atl other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other ActiviW Date: L4lOll2O23 AR$+lECT RegNo:C Al96l L9597 Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9637005781 or Mail- manoj.ka[a@yahoo.co.in MANOJ KATA AND ASSOCIATES ARCH ITECTS AND MASTERPI.AN N ERS TABLE.A.2 K Row House Sector A-13 To 24 s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certlficatel (u l2l (31 1. Excavation tOOo/o 2. Basements and Plinth lOOo/o 3. Podiums (if any) Oo/o 4. Stilt Floor lOOo/o 5. Slab of Super Structure IOOo/o 6. Internal Walls, Internal Plaster, Floorings, Doors, 4Oo/o windows within Flats / Premises 7. Sanitary Fittings within Flats / Premises o.h 8. Staircases, Lift Wells & Lobbies at each Floor Level Oo/o Overhead and Underground Water Tanks 9. Externd Plumbing & External Plaster, Elevation, Oo/o Completion of Terraces, with waterproofrng of the Buildine / Wine 10. Installation of Lifts, Water Pumps, Fire Fighting Oo/o Fittings and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound WaIl and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Date: l4lOLl2O23 RegNo:C Al96l L9597 Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9537005781 or Mail- manoj.kala@yahoo.co.in MANOJ KAIA AND ASSOCIATES ARCH ITE TS AN D MASTERPIAN N ERS TABLE.B Common Areas (lnternal & External Development Works) in respect of the re Registered Phase s. Common Areas & Proposed Percentage of Details No. Facilities (Yes / Nof actual Work Done (As on date of Certilicatel t1l l2l (31 l4l (sl 1. Internal Roads & Footpaths YES 3OYo Internal Project Cement Roads 2. Water Supply YES SOVI From Borewell 3. Sewerage (Chamber, Lines, YES OVo As per Consultant Septic Tank, STP) Drawing 4. Strom Water Drains NO 5. Landscaping & Tree YES OVo Tree plantation and Planting garden 6. Street Lighting YES Oo/o Street Lights for internal proiect 7. Community Buildings NO 8. Treatment & Disposal of NA NA Sewage and Sludge Water 9. Solid Waste Management & NO Disposal 10. Water Conservation / Rain YES Oo/o Rain water Water Harvesting harvesting as per norlns 11. Energy Management 72. Fire Protection & Fire NO NA Safety requirements 13. Electrical Meter Room, NO NA Sub-Station, Receiving Station a Date: l4loll2o23 Yours ti Accepted by: .;t1 BUILDC()N of PftHliIttFR Name: Trilok Buildcon. Date: l4lOL 12or23 Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9637005781 or Mail- manoj.kala@yahoo.co.in