MANOJ KATA AND ASSOCIATES ARCHITECTS AND MASTERPIANNERS FORM 1 re [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: - 10- lO-2O22 To, The Trilok Buildcon, Room No. 3, Resham Lawns, Gut No. 141 Part, Satara, Beed Bypass, Chhatrapati Sambhaj inagar. Subject: Certificate of Percentage of Completion of Construction Work of Trllok Vista having MahaRERA Registration Number P515OOO45751 being developed by M/s Trilok Buildcon. Sir, I have undertaken assignment as Architect of Certifying Percentage of Completion of Construction Work of Trilok Vista having MahaRERA Registration Number P515OOO4S751 being developed by M/s Trilok Buildcon. , Based on the Site Inspection, with respect to the Layout / each Building/Wing of the a-foresaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Date: LOI LO|2O22 ftQ*- 'qB RegNo: C.Al96l L {'"fi Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9637005781 or Mail- manoj.kala@yahoo.co.in MANOJ KAIA AND ASSOCIATES ARCH ITECTS AN D MASTERPLAN N ERS K TABLE.A.l Row House Sector A-1 To 12 s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificatel (u tzl (31 1. Excavation 5Oo/o 2. Basements and Plinth O"/" 3. Podiums (if any) o"h 4. Stilt Floor Oo/o 5. Slab of Super Structure oh 6. Internal Walls, Internal Plaster, Floorings, Doors, Ot/" windows within Flats / Premises 7. Sanitary Fittings within Flats / Premises Oo/" 8. Staircases, Lift Wells & Lobbies at each Floor Level Ot/o Overhead and Underpround Water Tanks 9. External Plumbing & External Plaster, Elevation, Oo/o Completion of Terraces, with waterproofing of the Buildine / Wine 10. Installation of Lifts, Water Pumps, Fire Fighting Oo/o Fittings and Equipment's as per CFO NOC, t Electrical Fittings, Mechalical Equipment's, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activitv Date: LOI LOl2022 Yours Faithfully, f ",. Manoj Kala RegNo:CAl96lL Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9537005781 or Mail- manoj.kala@yahoo.co.in MANOJ KA1A AND ASSOCIATES ARCH ITE TS AND MASTERPIANN ERS TABLE.A.2 K Row House Sector A- 13 To 24 s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certilicatel (U l2l (31 1. Excavation lOOo/o 2. Basements and Plinth lOOo/o 3. Podiums (if any) Oo/o 4. Stilt Floor Oo/o 5. Slab of Super Structure Oo/o 6. Internal Walls, Internal Plaster, Floorings, Doors, O%o windows within Flats / Premises 7. Sanitary Fittings within Flats / Premises O/o 8. Staircases, Lift Wells & Lobbies at each Floor Level O"/o Overhead and Underground Water Tanks 9. External Plumbing & External Plaster, Elevation, Oo/o Completion of Terraces, with waterproofing of the Buildine / Wine 10. Installation of Lifts, Water Pumps, Fire Fighting Oo/o Fittings and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, P1inth Protection, Paving of Areas appurtenant to Building/Wing, Compound WaIl and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other ActiviW Date: lOl lOl2022 Yours Fal.OFO, , # p $ Manoj Kala RegNo:CAl96ll95 Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +9 1 9637005781 or Mail- manoj. kala @yahoo.co. in MANOJ KALA AND ASSOCIATES ARCH ITECTS AN D MASTERP!.AN N ERS TABLE.B K Common Areas (Internal & External Development Works) in respect of the Registered Phase S. Common Areas & Proposed Percentage of Details No. Facilitiec (Yes / No) actual Work Done (As on date of Certilicatel t1l l2l (3) (41 (s) 1. Internal Roads & Footpaths YES 3Oo/o Internal Project Cement Roads 2. Water Supply YES 5O/o From Borewell 3. Sewerage (Chamber, Lines, YES ooh As per Consultant Septic Tank, STP) Drawing 4. Strom Water Drains NO 5. Landscaping & Tree YES OYo Tree plantation and Planting garden 6. Street Lighting YES OVo Street Lights for internal proiect 7. Community Buildings NO 8. Treatment & Disposal of NA NA Sewage and Sludge Water 9. Solid Waste Management & NO Disposal 10. Water Conservation / Rain YES OVo Rain water Water Harvesting harvesting as per nofins 11. Enerry Management t2. Fire Protection & Pire NO NA Safety requirements 13. Electrical Meter Room, NO NA Sub-Station, Receiving Station Date: LOllOl2Ozz ? Yours Faithfully, | - ,r {+,:, \rh ,/ \ Cn' ,-- lQ\, Atctrltectl Atchftecy' Signa ManoJ Kala RegNo:CAl96l Lvov-r Date: l0l LO|2O22 Manoj Kala and Associates, B-301, Space Olympia, SutgirniChowk, Garkheda, Aurangabad 431009 Contact: +91 9637005781 or Mail- manoj.kala@yahoo.co.in