t Amol Kshirsagar Annexure - B Arch itectural Planner, Consulting Engineer & FORM.2 Valuer [See Regulatlon 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date: 12-01-2024 To, SARA LANDMARKS, 11, A-W!NG, NARAYAN PLAZA, CANNAUGHT PLACE, AURANGABAD Subject: Certificate of Cost lncurred for Development of SARA SAHYADRI PARK having MahaRERA Registration Number P51500033910 being developed by SARA LANDMARKS. Sir, I / We ER AMOL KSHIRSAGAR have undertaken assignment of Certifying Estimated Cost for SARA SAHYADRI PARK having MahaREM Registration Number P51500033910 being developed by SARA LANDMARKS. 1. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in' the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. estimate Total Estimated Cost of completion of the aforesaid Project mentioned reference at Rs. 12,11,38,0901 (Total of Table A & B) at the time of Registration. The Total Cost of Project is with reference to the Civil, MEP & Allied Works com of the apartments & proportionate completion of internal & external works, as per the mentioned in the Agreement of Sale & for the purpose of obtdining Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted from the AURANGABAD MUNICIPAL CORPOMTION AU being Project is being Flat No.4, Plot No. 102, Nath pran gan, Garkheda, Chhatrapati Sambhajinagar Mob. :09960669921 The Estimated Cost incurred till date is calculates to Rs. 4,23,98,331/- (Total of Table A & B). The Amount of E.stim.a.t_e.d...C..gsj..!nc!l.r.r:ed..!s...eA!gu!ated...-o.n..the..-b.es.r-s...gJ..inp.ql m.a.terials./.serv.!ces.u.ep..d.&.uni!..c..o..q!..qI.th.ese.items. 4. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs.7,87,39,7591- (Total of TableA& B). 5. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / wing / Layout / plotted Development for SARA SAHYADRI PARK S. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of Building / Wing tLayout I Rs. 11 ,57,44,4901- Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate Rs. 4,05,10,5711- 31 December2023 3. Work Done in Percentage (as percentage of 35o/o t Estimated Cost) 4. Balance Cost to be incurred .. (based on Rs. 7,52,33,919/- Estimated Cost) 5. Cost incurred on Additionall Extra ltems not included in the Estimated Cost (Table-C) TABLE - B Internal & External Development Works in respect of SARA SAHyADR! pARK s. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of lnternal & External Rs.53,93,600/- Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate Rs. 18,87,760/- 31 December2023 3. Work Done in Percentage 1as percentage of 35% Estimated Cost) 4. Balance Cost to be incurred ** llbased on Rs.35,05,840/- Estimated Cost) 5. Cost incurred on Additional tExtra ltems not included in the Estimated Cost (Table-C) 9 q \o t> D +) Yours faithfully, Er. AMOL signature & Name (lN BLocK LETTERS) with stamp of Engineer LocalAuthority License Number E t 174 t 93 Agreed & Accepted by: Name: SARA LANDMARKS Date: 12-01-2024 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. ! (.) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the piace marked (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4' All components of work with specifications are indicative & not exhaustive 5' Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of sale. {f,lh\ TABLE - C List of Extra / Additional / Deleted Items considered in the cost (which were not parts of the original Estimate of rotal cost)