Amol Kshirsagar Arch itectu ral Plan ner, Consulting Engineer & Annexure A Valuer FORM 1 [See Regulation 3] ARCHTTECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawal of Money from Designated Accotrnt) Date:72-01-2024 To, SARA LANDMARKS, 11, A-WING, NARAYAN PLAZA. CANNAUGIII PLACE, AURANGABAD Subject: Completion of Construction Work of SARA MahaRERA Registration Number p51500033910 NDMARKS Sir, t 1 on the site Inspectign,-with respect to Layout / eachBuilding/wing of the aforesaid lhe of this i",.t*""-,ri" p"..",,tage of work Done }il,:*:**j,::Igl$ S* "i Estate project under noJ"oirio=t;t# of the Building/wing of the":Rear for v' The percentage of work executed. with respect il;H?::fr to eaci Jthe activity of entire phase is [ed in Table-B. TABLE-A-1 Number -SARA SAHyADRI pARK RH No 1to 12 Tasks/Activity Percentage of ectuat Work Done on date of the '^Frro Flat No.4, Plot No. 102, ,E,i* Nath prangan, Garkheda, Ghhatrapati Sambhaj inagar Mob. : 09960669921 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/ Prernises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatiorL 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water punps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to enh'ance lobby/ s, plinth protection, paving of areas appurtenant to Building/Wtng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A-2 t / Building / WlrgNumber - SARA SAIIYADRI PARK RH no. 13 to 18 S. Tasks/ Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2') (3) 1 Excavation 0 2 X number of Basernent(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 F1ats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water purnps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Elecb'ical fittings to Common Areas, electro, mechanical equipment Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building /Wng, Compound Wall and all other requirements as may be required to Obtain Occu ion Certificate TABLE-A-3 Layout / Building / Wne Number - SARA SAHYADRI PARK RH No. 19 to 25 s. Tasks/ Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, Internal Plaster, Floorings \Ariftin 0 Flats/Irremises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and I Underground Water Tanks. 9 The extemal plumbing and external plaster, elevatiorL 0 completion of terraces with waterproofing of the Building/Wing 10 lnstallation of lifts, water pumps/ Fire l.'ighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, rnechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Buildng/Wng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A-4 t Number - SARA SATIYADRI PARK RH no. 26to 37 s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0 2 X number of Basement(s) and Plinth -20 J X number of Pocliums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FIat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the F1at/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatiory 0 cornpletion of terraces with waterproofing of the Buitding/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CIrO NOC, Electrical fittings to Cornmon Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtenant to Building/Wng, Compound Wall and all other requirements as lnay be required to Obtain Occupation /Completion Certificate TABLE-A.5 La Number - SARA SAIIYADRI PARK RH no.38 to 49 S. Tasks/Acivity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100 2 X number of Basernent(s) and Plinth 100 --) X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 100 6 Internal wa1ls, Internal P1aster, Floorings within 100 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 100 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatior; 100 completion of terraces with waterproofing of the Buildins/Wine '10 Installation of lifts, water purnps, Fire Fiqhting Fittinrs ,,// 100 iev and Equipment as per CIrO NOC, Electrical fittings to Common Areas, electro, rnechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Buildng/Wng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A-6 Number - SARA SAIIYADRI PARK RH No. 50 to 58 s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, Internal P1aster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fiftings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 , connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external. plaster, elevatiorg 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, elech'o, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildtng/Wng, Compound Wall and all other requirements as may be required to Obtain Occupabion / Completion Certificate TABLE-A.7 Building / Wll:.S, Number - SARA SAHYADRI PARK RH no. 59 to 58 s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0 2 X number of Basement(s) and Plinth ao QWVt J X number of Pocliums 0 4 Stilt Floor 0 5 X number of Slabs of Super Strucfure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 I;ittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatiorl 0 completion of terraces wittr waterproofing of the Buitdine/Wing 10 Installation of lifts, water purnps, Fire Fighting Fittings 0 and Ecluipment as per CFO NOC, Electrical fittings to Cornmon Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protectiory paving of areas appurtenant to Buildtng/Wng, Compound Wall and all other requirernents as may be required to Obtain Occupation / Completion Certificate TABLE.A.8 t Wing Number - SARA SAIfYADRI PARK RH no.59 to 80 . S. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100 2 X number of Basernent(s) and Plinth 100 J X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 100 Fittings within the Flat/Prernises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 conneching Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatior! 100 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fiehtins Fittines ./ 100 and Equipment as per CIrO NOC, Elechical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to enh'ance lobby / s, plinth protection, paving of areas appurtenant to Building /W^g, Compound WaIl and all other requirements as may be required to Obtain Occupation / Completion Certificate TABLE.A-9 lqrout / Building / wngNumber - SARA SATTYADRI PARK RH no.81to 90 S. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) 1 Excavation 4) (3) 100 2 X number of Basement(s) ancl l,linth L00 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 6 lnternal walls, Internal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fiftings within the F'lat/Premises, Electrical 100 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 , connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 100 completion of terraces with waterpro-ofing of the Building/Wing 10 Installation of lifts, water purnps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Elecbical fittings to Common Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building/Wtng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A.l0 La Building / Wne Number - SARA SAI{YADRI PARK RH no. 9tto97 s. Tasks/Activity Percentage of Acfual Work No. Done (As on date of the Certificate) (1) \4 (3) 1 Excavation 0 2 X number of Basement(s) and Plinth _-/ 0 \5 \qbED6sU' J X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to eich of the Flat/Premises 7 Sanitary Fittings within the Flat/premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and 9 The external plumbing and external plaster, elevatiorg 0 cornpletion of terraces with waterproofing of the Buildnrg/Wing 10 TABLE.A-l1 Number - SARA SAIfYADRI PARK RH no.9g to 103 ' Percentage of Acfual Work Done 'As on date of the X number of Basernent(s) and Plinth X number of Slabs of Super Structure Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Sanitary Fittings within the Flat/premises, Electricail Fittings within the Flat/Premises Staircases, L,ifts Wells and l,obbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, completion of terraces with waterproofing of. the Buildins/Wins Installation of lifts, water pumps, Fire Fiehtins F W, \t/{ and Equipment as per CIIO NOC, Electrical fittings to Common Areas, electro, rnechanical equipmer.r! Compliance to conditions of environment /CRZ NOC, Finishing to enh'ance lobby / s, plinth protection, paving of areas appurtenant to Building/Wtng, Compounrl WaIl and all other requirements as may be required to Obtain Occupation /Com Certificate TABLE-A-l2 Number - SARA SAHYADRI PARK RH no. lM to 110 S. Tasks/Activity Percentage of Acfual Work No. Done (As on date of the Certificate) (1) a) (3) 1 Excavation 100 2 X number of Basement(s) and Irlinth 0 J X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building/Wtng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Cerfficate TABLE.A.13 Number - SARA SAIIYADRI PARK RH No.111to 120 S. Tasks/Activity Percentage of Acfual Work No. Done (As on date of the Certificate) (1) \4 (3) 1 Excavation 00 2 X number of Basement(s) and Plinth 100 7' r6) l> J X number of Pocliums 4 Stilt Floor 5 X number of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 100 Fittings wiflrin the Flat/Premises 8 Staircases, Lifts Wells ancl Lobbies at each Floor level 100 connecting Staircases anc{ Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 80 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water purnps, Fire Fighting Fittings 70 and Equipment as per CIrO NOC, Electrical fittings to Cornmon Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protectiory paving of areas appurtenant to Building/Wng,Compound Wall and all other requirernents as rnay be required to Obtain Occupation / Completion Certificate TABLE-B Common Areas (Internal & External Development Works) in respect of the Wi^g Number - SARA SAIIYADRI PARK Common Areas & Facilities Percentage of acfual Work Done (As on date of Water Conservatioru Rain water LED LIGHTS FOR STREET LIGHTS Fire Protection And Fire Safety Electrical Meter Room, Sub- Station, Receivinq Station : Aggregate area of recreational Water Su BOREWELL 9. Sewerage (Chamber, Lines, Septic YES 0 COMMON SEPTIC Tank, STP) : TANK 10. Storm Water Drains : YES 0 AS PER CONSULTANT 17. Landscaping & Tree Planting: NO 0 NA 12. Street Lighting : YES 0 LED LIGHTS 13. Community Buildings : NO 0 NA 74. Treatnent And Disposal Of NO 0 NA Sewage And Sullage Water: Yours faithfully, \1.\ ER. AMOL Signature & Name 0N BLOCK LEffflsy of Land Surveyor Architect / License Number E / 174/ 99 Agreed & Accepted by: *l lh Name: SARA Date:1241-2024