Amol Kshirsagar Arch itectu ral Planner, Consulting Engineer & Annexure A Valuer FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:07-01-2023 To, SARA LANDMARKS, 11, A-WING, NARAYAN PLAZA, CANNAUGHT PLACE, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SARA SAIfYADRI PARK having MahaRERA Registration Number P51500033910 being developed by SARA LANDMARKS Sir, I / WeER AMOL KSHIRSAGAR has undertaken assignment as Architect / Licensed Suiveyor of Certifying Percentage of Completion of Construction Work of SARA SAIIYADRI PARK having MahaRERA Registration Number P51500033910 being developed by SARA on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Estate Projec! I certify that as on date of this Certificate, the Percentage of Work Done for of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein . The percentage of work executed with respect to each of the activity of entire Phase is in Table-B. TABLE.A.1 Number -SARA SAHYADRI PARK RH No I to L2 Tasks/Activity Percentage of :Acfual Work Done As on date of the Flat No.4, Plot No. 102, Nathpran gan,Garkheda, Chhatrapati Sambhajinagar Mob. : 09960669921 Xnumb"roffi Internal Flats/Premises, Doors and El^r /o-^-^:- 'SCS Staircases, aUO * ::3:-.gg .S.,:."."y anct Lifts, overhead and Water Tanks. The exte completi Buildine/Wins c;;;il;".. "."rtirl[ Finishing to enh.ance lo of areas appurtenant WaIl a-.I Wall all ^rL.-- and aII other -^-- ' re_quiremenrc as may be requirect Obtain Occuparion Ctmple tion to / C"r#i'.r* TABLE-A.2 s. Buildi /w o. 13 to tg No. Percentage ofIEfiEoil (t As on date of the Certificate 1 (: 2 X number of 0 J X number of poairrr.r, 0 4 0 5 Xr,umburoffi 0 6 Internal 0 Flats/Premises, Doors an 0 El^a /rr)--,--' 7 0 ses 8 Staircases, aOO connecting Staircases anti Lifts, 0 Overhead and Underground Water Tanks. 9 The exte completi 0 Buildine/Wino 10 0 ;#i ,.a,,-',b t Common Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRi NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtenant to Building/Wing, Compounl WalI and all other requirements as may te requirecl to Obtain Occupation /Completion Certificate TABLE-A-3 La t B Number - SARA SAHYADRI PARK RH No- 1s fn ,E s. Tasks/Activity Percentage of Acfual Work No. Done (As on date of the Certificate) (1) 1 trxcavanon QI o 0 2 X number of Basement(s) and plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal plaster@ 0 Flats/Premises, Doors and Winclows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/premises, Electrical 0 Fittings within the Flat/Irremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead ancl a 9 The external plumbing and ex@ 0 completion of terraces with waterproofing of the 10 TABLE-A.4 t Wing Number - SARA SAIIYADRI PARK Rff nn )A tn an s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) GI ol (3) 1 r,xcavarlon 0 2 X number of Basement(s) and ptinth 0 ro X number of Pocliums X number of Slabs of Super Structure Internal walls, Internal Ha@ Flats/I'remises, Doors and Winclows to eich of the sanitary Fittings within th@ Staircases, fifts We connecting Staircases and Lifts, Overheacl and Underground Water Tanks. The external plumbing u"a@ completion of terraces with waterproofing of the Installation of I and Equipment as per CF Common Areas, electro, mechanical equipmen! Compliance to conditions of environment ldni NOC, Finishing to enbance lobby/s, plinth protection, paving of areas appurtenant to tsuildng/Wng, Compour,j Wall and all other requirernents ai rnay Le requiecl to Obtain Occupation /Completion Certificate TABLE.A.5 Wi Number - SARA SAIfYADRI PARK RH no.38 to 49 S. Percentage of Actuaiwork No. Done on date of the 11) 1 Excavation 100 2 X number of Basernent(s) and ptintn 100 J X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Shuchrre 100 6 Internal walls, Internal@ 100 Flats/Prernises, Doors and Windows to eich of the 7 sanitary Fittings within @ 50 Fittings within the Flat/prernises 8 Staircases, fifts Welt 50 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing a"@ 50 completion of terraces with waterproofing of the L0 Installation of lifts, water 50 irl + tQ6EY il and Equipment as per CFO NOC, Elechical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing tion, paving of areas CompounJ Wall and required to Obtain Occupation / Completion Certificate TABLE.A-5 La Number - SARA SAHYADRI PARK RH No.50 to 58 s. Tasks/Activity Percentage of Acfual Work No. Done (As on date of the Certificafpl (1) (21 (3) 1 Excavation 0 2 X nurnber of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal wa1ls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to ejch of the Flat/Premises 7 Sanitary Irittings within the Flat/premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at eachJl,ooilevel 0' corurecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and e*te..,allGGr; eGrutior,, 0 completion of terraces with waterproofing of the 10 TABLE-A.7 / Build Number - SARA SAIfYADRI PARK RH no- 59 to 68 S. Tasks/Activity Percentage of Actual Work No. Done laq ,. date of the Certificate) (1) (2) (3) 1 Excavation 0 2 X number of Basement(s) and plinth / 0 X number of lruaUrnt Stilt Floor X number of Slabs of Strucfure Internal -, Flats/Premises, Doors and Windows to each of the lsnitary Pitti" F'ittings within the Flat/Irremises Staircases, L connecting Staircases and Lifts, Overhead and Underground Water Tanks. Th" "rrur^ of terraces cornpletion with waterproofing of th; Installa and Eq Common 1-^*- ^- a Areas, i electro, mechanical equipmen! Compliance to conclitions rf environment Finishing to entrance /CniNOC, plLi.nth protectiory paving o.f areas appurtenantlobbyls, to Buitiing/Wng, Compouncl Wall and all other re_quirements as rnay 6e requiied to Obtain Occupation / Completion Certificate TABLE.A.8 Nlmlgr - SARA SATTyADRI PARK RH no.69 to 80 Percentage oF actual W'ork Done As on date of the Excavation Xnrmbe@ X number of Podiums Stilt Floor X.r-bero@ Inte,ral walls, Flats/Prernises, Doors and Windows to each of the o, lpitary Fittings within the Flat/prernises Sauir.ur"t 99ryecting Staircases and Lifts, Overhead ancl Underground Water Tanks. The extern, completion of terraces with waterproofing of th; Installation of lift+ water Fire Fi s v l!; /.7 vvrrrt,rrqrrLr ru uc,nqluons of envirolunent Finishin g to entranc e /cRZ Noc, f t" c tion, p avin g of areas appurtenant!"b!V to !Builil ",..f -t.i.,tn inr /ivin,,"o Compouncl vuurlrLru.fL(l required to TABLE.A.9 Wi no. g1to 90 Tasks/Activity Percentage ofAdal Woik Done on date of the Excavafion Xnumbero@ X number ofFodiumi Xn,rmbetffi Internal w Flats/Premi :ir"', fitHngs within the Flat/premises Staircases, tO 59ryecting Staircases and Lifts, Overheacl ,rrJ Underground Water Tanks. The exte completi Buildins/Win<, vv..ulvrr f1.ttrali/ efecffO Compliance to conriitions Finishing to entrance lo of areas appurtenant Wall Wall ^-,{ ancl all ^tt ^!L^- other --- - requirements as may be requireci Obtain Occupa rion / Clomple rion to Certifilate TABLE-A.10 / Burld w A DAfIYAI s. Tasks/ Activity- 'RI I{RKRHno.97to97 No. Percentage oaActuat Woil- Done (1) (As on date of the Certificate) 1 .c,xLdVaUOn (3) 2 0 S\ X number of Slabs of Super Structure Internal walls, Internal Rtaste@ F'lats/Premises, Doors and Winclows to each of the sanitary Fittings within trre rt@ ings within the Flat/Irremjses Staircases, Lifts Wells a,.'O toffi connecting Staircases and Lifts, Overheacl and The external plumbing and external plaster, elevatior; completion of terraces with waterproofing of the Installation of lifts, water purnps, Fire Fighting Fittings and Equipment as per CFO NOC, Elechical fittings io Common Areas, electro, mechanical equipmeng Compliance to conditions of environment /CRi NOC, Finishing to entrance lobby/s,plinth protectiorg paving of areas appurtenant to tsuilcltng/Wtng, Compounj Wall and all other requirernents ai rnay be requilred to Obtain Occupation /Completion Certificate TABLE-A-11 Wing Number - SARA SAIIYADRI PARK Rff nn QR +n Ii? S. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) ji)_ (21 (3) 1 Excavation 0 2 ,r numoer or uasernent(s) and plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 ruunDer oI Slabs of Super Strucfure 0 walls, Internal plm ^. 6 Internal 0 Flats/Premises, Doors and Windows to eich of the FIat/Premises 7 Darumry ,hrtrngs wrurrn the Flat/premises, Electrical 0 Fittings within the Ftat/prernises 8 Julrcases/ Lrtts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 rne exrernar plumhmg and external plaster, elevatiory 0 completion of terraces with waterproofing of the Building/Wing '10 Installation of lifts, water pumpffi 0 and Equip Common mechanical aarrin,-a,.r (-n*-li^.^^^ Compliance r^ r'.' to conditions -- of Finishing to entuance lobby/s of areas appurtenant to Bu IA/^tf WaIl ^-J - ri ^tr other and aII r obt i" o..,r,ti"^ /"3;;;?;:: e:,HI# required to TABLE-A-12 o.lM to 110 Percentage of actuai Wort As on date of the Excavation Xnurnbero@ X number oFpodiumi X number o?SGt r.,r Strucfure Internal *rO Flats/Premises, Doors ancl Windows to each of the li].l:o'y l-1* Fittings within the Flat/premises Staircases, corurectlng Staircases ancl Lifts, Overheacl ur,J Underground Water Tanks. The exte completi Il',lfJ.i--,/rrr:,- vv'lulvrr EclD/ gfeCtIO ^f Compliance to conditions Finishing to entrance lo of areas appurtenant IA/-tl Wall anri ^lr other ^^-.r all -rr requirements as may be requiretl Obtain Occupa tion /Completion CerUfilate to TABLE-A-13 wi Nulnher: SARA sAHyADRI pARK RH No.111 to72O Percentage of ectuat Work As on date of the Certificate Excavation Xr,umber@ X nurnber of Pocliums X nunlber of Slabs of S.,p", St r.fur" Internal *otlt Flats/Premises, Doors and Windows to each of the llnitary ritti.rg Fittings within the Flat/premises Staircases, Lif connecting Staircases anc{ Lifts, Overheacl and Unclerground Water Tanks. T'he externul pl"mb completion of terraces with waterproofing of ft; Installation of li and Equiprnent Cornmon Areas, electro, mechanical equipmen! Compliance to conditions of environment /CkiNOC; Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Buifting/Wng, Cornpornj Wall and all other requirements as rnay 6e requi'recl to Obtain Occupation / Completion Certificate TABLE-B Areas (Interna1 & External Development Works) .Common in respect of the wi^g Number - SARA sAIryADRr pARi( s. Common Rreai & facilities Proposed Percentage of acfual Details No. (Yes/No) Work Done (As on date of Certificate) (1) ol (3) (sl 1. 14 YES 0 TRIMIX ROAD 2. yYaler \-onservauon, leln water YES 0 Harvesting: ASPER 3. Energy management: CONSULTANT YE5 0 LED LIGMS FOR E STREET LIGFITS 4. r us I r(rlEuuurl ftno. irre Satety NO 0 NA Requirements: 5. Electrical tvteter noom, SuU NO 0 NA Station, Receiving Station : 6. Aggregate area of recreational NO 0 Open Space : 7. NO 0 8. YES 20 BOREWELL 9. Sewerage (Chamber, Lines, Septic YES 0 COMMON SEPTIC Tank, STP): TANK 10. Storm Water Drains ; YES 0 ASPER CONSULTANT 11. Landscaping & Tree planting: NO 0 12 NA YES 0 LED LIGHTS 13. Community Buildings : NO 0 NA L4. Treatrnent And Disposal Of NO 0 NA Sewage And Sullage Water: Yours faithfully, ER. AMOL KSHIRSAGAR Signature & Name (IN Surveyor / Architect License Number E/L74/ gg Agreed & Accepted by: Name: SARA LANDMARKS Date:0741-2023