Amol Kshirsag€ar Architectural Planner , Consulting Engineer & Annexure A Valuer FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:70-10-2022 To, SARA LANDMARKS, 11, A.WING, NARAYAN PLAZA, CANNAUGHT PLACE, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SARA SATIYADRI PARK having MahaRERA Registration Number P51500033910 being developed by SARA LANDMARKS Sir, | / WeER AMOL KSHIRSAGAR has undertaken assignment as Architect / Licensed Burveyor of Certifying Percentage of Completion of Construction Work of SARA SAIfYADRI PARK having MahaRERA Registration Number P51500033910 being developed by SARA LANDMARKS. Based on the Site lnspection, with respect to the Layout / each Building/Wing of the aforesaid Certificate, the Percentage of Work Done for oject under MahaRERA is as per Table-A herein espect to each of the activity of entire Phase is TABLE.A-1 t / Buildin s, / Wlrrs, Number -SARA SAIilIADRI PARK RH No I to 12 s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (r) (3) \ (21 7 Exca,)etion 0 2 X numfor of Basement(s) and Plinth 0 .\ \1 lat lNcr.4, Plot No. 102, FIat i\ { athpr 'angan,Garkheda, Nathl hhatr'apati Sambhajinagar Chha lob. : 09960669921 Mob. Xnurnber of pocliums Stilt Floor X number of Slabs of Strucfure Internal * Flats/Irremises, Doors and Winclows to each of the llnitarr Fittings within the Flat/premises Staircases, Liftt connecting Staircases anci Lifts, Overheacl and Underground Water Tanks. fhe externr, completion of terraces with waterproofing of th; Installa and Eq Cornmon Areas, electro, mechanical equipmenf /a^---^ ^,^ a r Compliance to conditions rf environment /CRiNOC, Finishing to entrance lobby/ s, plrmth protectioru paving to' Buitcr ing/wng, Compound ,:1^f::: Wall and ]fnlfenant all other re^quirernents af'may Uu ,eqrilea to Obtain Occupation /Completion Certificate TABLE.A-2 Nymler - SARA SAHyADRI pARK RH no. 13 to 18, Percentageof AEilwork- Done As on date of the Excavation Xnumberof@ X number ofFoai"r"t Stilt Floor Xnrrnb"rofs@ Internal * Flats/Premises, Doors and Windows to each of the Sanitary fittin Fittings within the Flat/premises Staircases, t,i connecting Staircases ancl Lifts, Overheacl and Underground Water Tanks. The exter.r r* completion of terraces with waterproofing of th; Installation ofliftr, *t", Fire Figlltine Fi and Equipment as per CFo NoC@ Common Areas, electro, mechanical equiprient, TABLE-A.3 Building / WneNumber - SARA SAHYADR PARK Rfr Nn 10 s. Tasks/Activity Percentage of ActuaI Work No. Done (As on date of the Certificate) (1) 2l (3) 1. Excavation 0 z X nurnber of tsasement(s) ancl plinth 0 5 X number of Podiums 0 4 DUr.t floor 0 5 X number of Slabs ollgpgf StructuE 0 5 Internal walls, Internal pl@ 0 Flats/Premises, Doors and Windows to each of tte 7 Sanitary Fittings within tt e ff@ 0 Itl@gr within the Flat/premises 8 D*urcases, Ltts We.lls and Lobbies at each Floor level connecting Staircases and Lifts, Overheacl and 0' Underground Water Tanks. 9 The external plumbing a'ra@ 0 completion of terraces with waterproofing of the Building/Wing 10 0 TABLE.A.4 Building / Wns,Number - SARA SAIIYADRT PARK Rff nn ,A+^ 2t'7 s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) QI (3) 2 1. Excavation ,l. numDer or rasement(s) and pli .// Zo o ffi 'fu@ X number of Pocliums X number of Slabs of Super Structure Internal walls, Internal p@ Flats/Premises, Doors and Winclows to eich of the Sanitary Fittings *i within the Flat/ Irremises Staircases, fifts We connecting Staircases and Lifts, Overheacl and The external plumbing una@ completion of terraces with waterproofing of the Installation of and Equipment as per CF Common Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRiNOC, Finishing to entrance lobby/s, plinth protectiory paving of areas appurtenant to Builcltng/Wng, Compouni wall ancl all other requirernents ai rnay 6e requi'recl to Obtain Occupation / Completion Certificate TABLE.A-5 Number - SARA SAIIYADRI PARK RH no.38 to {9 s. Percentage of .tctual Work No. Done on date of the t) 1 Excavation 100 2 XnumberofB@ 100 J X number of Podiums 4 5 X number of Slabs of 100 6 Internal walls, Internal 10 Flats/Prernises, Doors and Winclows to each of the 7 Sanitary Fittings *i 0 8 Staircases, fifts W 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing o 0 completion of terraces with waterproofing of the 10 Installation of lifts, water tngs 0 Ka 1 Eet ,tJo\ A r{tJ t> lp LI},t., \Ar',( l$r.-; ) + h / and Equipment as per CFO NOC, El"chi"rl fittirgs to Common Areas, electro, rnechanical equipment, Compliance Finishing to of areas ap Wall and all other requirements as may be requirecl to Obtain Occupation / Completion Certificate TABTE-A-5 ut E"il4ine / WneNumber - SARA SAHYADR PARK Rff Nn En +^ trq s. Tasks/Activity Percentage of Acfual Work No. Done (As on date of the Certificate) (1) QI (3) 1 11XCaVaUOn 0 2 ,r nurnDer or basement(s) and I{inth 0 3 X number of Podiurns 0 4 Dfrlt rtoor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal ph@ 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Darurary rlnrngs wrthrn the Flat/premises, Electrical 0 Fittings within the Flat/premises 8 Staircases, Lifts Wells and Lobbffi connecting Staircases and Lifts, Overheacl and 0' Underground Water Tanks. 9 rne exrernal plumDmg and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing 10 TABLE.A-7 La Building / WneNumber - SARA SAHYADRT PARK Rff nn Eq +^ AQ, s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) tzt (3) 1 Excavation 0 2 ,r numoer or basement(s) and plinth s .Qffi,I% X number of Podiums X number of Slabs of Super Struchrre Internal walls, Internal plu@ Flats/Premises, I)oors and Windows to each of the Sanitary Fittings within Ur"@ ings within the Illat/Irremises Staircases, Lifts Wells a^d Loffi connecting Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevatiorl completion of terraces with waterproofing of the Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical flttirrgs io Wall and all other requirernents as rnay be requiecl to Obtain Occupation /Completion Certificate TABLE.A.8 La t B Wing Number - SARA SAIIYADR PARK Rff nn 6q +^ R?t s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) EI (21 {q) 1 EXCaVaUOn 100 2 numDer or basement(s) and plinth ^ 100 3 numDer oI rodlums ^. 4 Stilt Floor. q munDer or blabs ot Uuper Strucfure ^ 100 6 Internal walls, Internal pl@ 10 Flats/Premises, Doors and Windows to eich of the Flat/Premises 7 Darumry rttrulgs wruun the },lat/premises, Electrical 0 Fittings within the Flat/prernises 8 Drarcases/ l,tts Wells and Lobbies at each Floor level 0 conneching Staircases and Lifts, Overhead ancl 9 The external plumbing and @ completion of terraces with wateiproofing of the 0 Building/Wing 10 rnsauauon or [tts, water pumps, Fire Fightine Fittings z0 trhm * E rcu-, l7 ws vvrr.I,rrarrLr ru conqltlons of environment Finishing to entrance /cRz Noc, r:.qlir,tf, frtt".tion, paving -Buitcl l"lby/ to ins/frng, Compound ;j",i':i', :Xp^11,:1,,t Wall and all other requiremeno ur',,uy't".;;#;'i; Obtain Occu pation / Cbmpletion Certifi'cate TABLE.A-9 no. g1 to 90 Percentage-iAGl wbE Done on date of the Excavation Xnumberof B@ X number of F"airrrro X number of Slatrs of Internal w Flats/Premi llT*', Ii Fittings within the Flat/premises Stuir.ur"t connecting Staircases ancl LifLs, Overheacl ur,J The external completion Building/Wins vvr.rru rvr I f1'I eas/ eIeCU:O Compliance to conditions Finishing to entrance lo of areas appurtenant IA/olI Wall --.{ all ^rL--- ancl ^rI other requirements as may be required Obtain Occupa hion Comple rion to / Certifi'cate TABLE.A.IO no,9irto 97 Percentage-f AEal-Wbrk Done on date of the Excavation xnumberofB@ X nurnber of Pocliums X number of Slabs of Super Struchrre Internal walls, Internal phs@ Flats/I'remises, Doors and Winclows to eich of the sanitary Fittings within the@ Staircases, Lifts Wells rr.,a tffi connecting Staircases anci Lifts, Overhead and Unclerground Water Tanks. Ihe external plumbing and "@waterproofing of the cornpletion of terraces with Installation of lifts, water p"-p@ and Equipment as per CF ) NOC, Electrical flttir,g, io Cornmon Areas, electro, mechanical equipieng Compliance to conditions of environment /CRi NOC, Finishing to entrance lcbby/ s, plinth protection, paving areas appurtenant to tsuilclng/W:rrrg Compounj _of Wall and all other requirernents ai rnay 6e requiecl to Obtain Occupation / Completion Certificate TABLE-A-l1 t Wir,g Number - SARA SAIIYADRI PARK Rff nn QR +^ rJla S. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1, Excavation 0 2 J I numper or basemen X number of Podiums inth 0 0 4 Stilt Floor 0 5 munoer or brabs ot Uuper Structure ^rnrernar 0 6 watls, lnternal plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Darurary rrrurngs wruun the lilat/premises, Electrical 0 Iittings within the Flatl prernises 8 Dulrcases/ Lfts wens and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead ancl Underground Water Tanks. 9 rne exrernal prumbmg and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water Durnns. Fire Fiohrino FirH and Equipment as per CFO NOC, Eleclrical fittings to Common Areas, electro, mechanical equipieng TABLE.A-l2 Number- SARA SAIIYADRI ARK RTf nn 1(M ta 11rt s. Tasks/Activity Percentage of ActuaI Work No. Done (As on date of the Certificate) ti,- (21 €) 1. I]XCaVaflon 0 , X nurnber of Basement(s) ancl plinth 0 J /\ numoer oI l,ocl.rums 0 4 Stilt Floor 0 5 ,r numoer or Dlabs ot Super Strucfure 0 6 rnrernal wals/ lnternal plaster, Floorings within 0 Flats/Premises, Doors and Windows to erch of the Flat/Premises 7 sanitary Fiftings within tne r@ 0 Fittings within the Flat/premises 8 Staircases, Lifts Wells ur,a Loffi 0 connecting Staircases and Lifts, Overheacl and Underground Water Tanks. 9 rne exrernal prumbmg and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing 10 0 TABLE-A-I3 La t / Building / WngNumber - SARA SAIIYADRT p ARK RIf Nn 111 +n 1?fi S. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) QI (3) 1 tloll 100 , J X nurnber of Pocliums 0 4 Stilt Floor 0 5 X number of Slabs of Super Strucfure 0 6 Internal walls, Internal Plaster, floorir,lgs wittrin 0 Flats/Premises, Doors and Windows to each of the FIat/Premises 7 Sanitary Fittings within the Flat/premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at eacfiTl,oor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatiory 0 cornpletion of terraces with waterproofing of the 10 0 TABLE-B Areas (Internal & External Development Works) .Common in respect of the Wi^g Number - SARA SAIIYADRI pARk s. Common Areas & Facilities Proposed Percentage of actual Details No. (Yes/No) Work Done (As on date of Certificate) (1) (3) \2) (4) (s) 1. Internal Roads & Footpaths: YES 0 TRIMIX ROAD 2. Water Conservatioru Rain water YES 0 AS PER Harvesting: CONSULTANT 3. Energy management: YES 0 LED LIGHTS FOR STREET LIGHTS 4. Fire Protection And Fire Safety NO 0 NA Requirements: 5. Electrical Meter Room, Sub- NO 0 NA Station, Receiving Station : 6. Aggregate area of recreational NO 0 NA 9p", Space : 7. OpenParking: NO 0 NA 8. YES 20 OPEN \ATELL AND ,& ,1. ,,/+J W BOREI,TELL 9. YES 0 COMMON SEPTIC 10. Storm Water Drains : TANK YES 0 ASPER CONSULTANT 11. Landscaping & Tree plantine. NO 0 NA 12. YES 0 LED LIGHTS 13. CommuniW Buildings : NO 0 NA 1.4. Treahnent And Disposal Of NO 0 NA Sewage And Sullage Water: Yours faithfully, ER. AMOL signature_& Name 0N BLocK LETTERS) of Land surveyor / Architect LicenseNumber E/174/gg Agreed & Accepted by: ,:( Name: SARA LAND g Date:10-10-2022