Amol Kshirsagar Architectu ral Pla nner, Consulting Engineer & Annexure A Valuer FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE of Money (To be submitted at the time of Registration of ongoing Project & for withdrawal from Designated Account) Date:06-0L2022 To, SARA LANDMARKS, 11, A-WING, NARAYAN PLAZA, CANNAUGHT PLACE, AURANGABAD Subject: certificate of Percentage of Completion of construction work of sARA SA1IyADRI pARK hiving MahaRERA Registration Number P51500033910 being developed by SARA LANDMARKS' Sir, r as Architect / Licensed SurveYor K Of SARA SA}IYADRI PARK P51500033910 being developed by SARA l on the Site Inspection, with respect to the Layout / eachBuilding/Wing 9fth9 aforesaid Done for Estate projec! I certify that as on dut" of this Certificate, the Percentage of Work herein of the nuiiaingTWinj of the Real Estate Project under MahaRERA is as per Table-A v. The p".."r,tug" of-work executed with respect to each of the activity of entire Phase is inTable-B. TABLE.A.I Buildin Wi Number -SARA SAIIYADRI PARK RH No I to 12 Percentage of Actual Work Done As on date of the Flat No.4, Plot No. 102, Nathprangan,Garkheda, Ghhatrapati Sambhajinagar Mob. : 09960669921 4 Stilt Irloor 0 5 X number of Slabs of Super Struchrre 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/premises, Electrical 0 Fittings within the Flat/ Prernises 8 Staircases, Lifts We1ls and Lobbies at each Floor level 0 corurecting Staircases and Lifts, Overhead and 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing 10 0 TABLE-A-2 La Building / WngNumber - SARA SAHYADRI PARK RH no. 13 to s. Tasks/Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 7 Excavation 0 2 X number of Basement(s) and Plinth 0 c X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Strucfure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary F-ittings within the Illat/Irremises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and 9 The external plumbing and external plaster, elevatiory 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water purnps, Fire Fighting Fittings 0 ancl Equipment as per CFO NOC, Electical fittines to w Common Compliance Finishing to entrance p\inth protection, paving -Builiing/Wng, of areas appurtenantlobbyls, to Co-porrj Wall and all other requirements af'may 6e requiiecl to Obtain Occupation / Completion Certificate TABLE-A.3 Tasks/Activity Percentage ofActuilEil As on date of the Certificate Excavation X number of Basementls; andflinth-- X number of Pocliums Stilt Floor X number of Slabs o? S"p", St rre Internal walls, tnterna "ct Flats/Itemises, Doors ancl Windows to each of the !11tary Fittings *i Irittings wi thin the l.=lat/ premises Staircases, Lift" W ggnnecting Staircases and Lifts, Overhead and Underground Water'Ianks. The externA pl" completion of terraces with waterproofing of th; Installation o and Equipment as per CF Wall and all other r required to obt i, o..,p"ti"" /"3;i1;T;:: A,ffil# TABLE-A.4 La Build Number - SARA SAIrvannr It At ra tH no. 26to37 s. Percentage of Acfual Work No. Done. (As on date of the Certificate) (1) (3) 1, 0 2 0 ,5tKsr--r; t \\ Z \QGR{PY J X number of Pocliums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Irittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each F1oor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces wittr waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CIrO NOC, Electrical fittings to Common Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protectiory paving of areas appurtenant to tsuilding/Wing, Compound Wall and all other requirernents as may be required to Obtain Occupation / Completion Certificate TABLE-A.5 Buildi Wi Number - SARA SAIIYADRI PARK RH no.38 to 49. Percentage of Actual Work Done As on date of the X number of Basement(s) and Plinth X number of Podiums X number of Slabs of Super Structure Internal walls, Internal P1aster, Floorings urithin Flats/Prernises, Doors and Windows to each of the Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises Staircases, Lifts Wells and L,obbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevatiort completion of terraces with waterproofing of the Installation of lifts, water purnps, Fire Fightine Fi (t\ \N' x and Equipment as per CFO NOC, Elechical fittings to Common Areas, electro, rnechanical equipnieng Compliance to conditions of environment /CRZ NOC, Finishing tion, paving of areas ComPound wa]] and required to Obtain Occupation /Completion Certificate TABLE-A.6 Build Number - SARA SAHYADRI PARK RH No- 50 fo 58 s. Tasks/Activity Percentage of Actual Work No. Done o 1. Excavation (2) (As on date of the Certificate) (3) 0 2 X number of Basement(s) ancl plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal plaster, Floorings within 0 Flats/Premises, Doors and Windows to eich of the Flat/Premises 7 Sanitary Fiftings within tf,e fht/@ 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells u.d tobblffi 0 connecting Staircases and Lifts, Overheacl and 9 The external plumbing and "@Waterproofing of the completion of terraces with 0 Building/Wing 10 0 TABLE-A-7 La Number - SARA SAI{YADRI PARK RH no.59 fo 68 s. . Tasks/Activity Percentage of Acfual Work No. Done (1) (2) l4!!4 date of the Certificate) G) 1 Excavation 0 X number of Basement(s) and plinth 2 or.6ksE 6 $w aqQrc-ffiSZ 3 X number of Pocliums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/I'remises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatior; 0 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Cornmon Areas, electro, mechanical equipmen! Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildrng/Wrng, Compound Wall and all other requirernents as rnay be required to Obtain Occupation / Completion Certificate TABLE.A.8 Number - SARA SAIfYADRI PARK RH no. 59 to 8O S. Tasks/Activity Percentage of Acttral Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 50 2 X number of Basement(s) and Ptinth 0 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Prernises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevatiory 0 completioft of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water purnps, Fire Fighting Fittings 0 Eh. Ns) a F[r"V and Equipment as per CFo NoC@ Common Areas, elecko, mechanical equiprient. Compliance Finishing to of areas ap Wall and all other requirements as may be requirecl to Obtain Occupatign /Completion Certificate TABLE.A-9 w Number - SARA SAHYADRI PARK Rlf nn- 81 fn Qo s. Tasks/Activity Percentage of Actual Work No. Done (1) _!!!!4 date of the Certificate) QI (3) 1 EXCaVafl.On 50 2 a. numoer ot rasement(s) and plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 A. numDer ot blabs of Super Strucfure 0 6 Internal wa1ls, Internal plaster, Floorings within 0 Flats/Premises, Doors and Windows to eich of the Flat/Premises 7 sanitary Fiftings wirhin u." ruM 0 Fittings r,r,ithin the Flat/ Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level t 0 connecting Staircases and Lifts, Overheacl and Underground Water Tanks. 9 The external plumbing and ext@ 0 completion of terraces with waterproofing of the Building/Wing 10 TABLE.A-10 t Wine Number - SARA SAHYADRI PARK Rlf nn qI +^ q7 s. Tasks/Activity Percentage of Actual Work No. Done _!!q ,4 date of the Certificate) ii) QI (3) 1 r,xcavauon 0 2 X number of Basement(s) and plinth /+;- QrcR{syl X number of Irocliums XnumberofStat@ Internal Irlats/Pre !3nitary rr* Fittings within the Flat/premises Staircases, L ggnnecting Staircases ancl Lifts, Overheacl and Underground Water Tanks. The externa pt"- completion of terraces with waterproofing of th; Installa and Eq Cornmon l- ^--^^ ^,- r Areas, elecho, ^ mechanical equipment, Compliance to conditions rf environment Finishing to entrance /CRiNOC; plinth protectioru paving areas appurtenantlobby1s, to Buildng/Wirrrg Compounj _of Wall and all oflrer re_quirements aJ rnay be requie.t to Obtain Occupation /Completion Certificate TABLE-A-ll Buildi wi Ntrmler - SARA SAIIyADRI pARK RH no. 98 to 103' s. Percentage ofAdiIWoE No. Done 'As on date of the 0 1 Excavation 2 Xnumberornuffi 0 0 J X number of Podiums 4 0 Stilt Floor 5 Xnumber"rsl@ 0 0 6 Internal * 0 Flats/Prernises, Doors ancl Winclows to each of the 7 lqitary at,*.tt 0 Fittings within the Flat/premises 8 Staircases, Lif 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external 0 terraces with waterproofing of the :,:,T?l"til1,..f 10 Installation of lifts, water ,4 Fire Fightine Fi 0,/ ,